Laserfiche WebLink
1.0 EV-SWBD Foundation <br /> 1.1 Foundation Design <br /> 1.2 RISA Foundation Output <br /> 1.3 Anchorage Design <br /> 1.4 Equipment Drawing <br />2.0 100A-SW Foundation <br /> 2.1 Foundation Design <br /> 2.2 RISA Foundation Output <br /> 2.3 Anchorage Design <br /> 2.4 Equipment Drawing <br />3.0 400A-SW Foundation <br /> 3.1 Foundation Design <br /> 3.2 RISA Foundation Output <br />3.3 Anchorage Design <br />3.4 Equipment Drawing <br />4.0 Wind Design Parameters <br />5.0 Seismic Design Parameters <br />Index <br />Tom's Truck Center #2 <br />CLIENT: Charge Ready Program <br />NV5 Project Number: 0000690_F8 <br />IFC Design <br />https://nv5inc-my.sharepoint.com/personal/dieter_bahr_nv5_com/Documents/Desktop/Project Folders/Charge Ready Fdns/Final Calculations/Calculations/Tom's Trucks Cover Sheet.xlsm <br />909 N Grand Ave - <br />101116238 & 201806132/15/2024