Laserfiche WebLink
Structural Calculations <br />Charge Ready Program <br />Date: 10/27/2023 <br />Calculated by: MM <br />Checked By: DPB <br />Electrical Equipment Pad - Structural Calculation <br />_________________________________________________________________________ <br />I. References <br />1. ASCE 7-16 <br />2. Z & Powe Distribution"EV SWBD-1" Dwg- 2309-3-16362A <br />3. Z & Powe Distribution"EV SWBD-2" Dw- 2309-3-16362B <br />4. GE 150kVA Transformer Dwg 303B111GEDYP76A <br />II. Equipment Information <br />EV SWBD-1 <br />weq1 76in(Width of Equipment) <br />leq1 42in(Length of Equipment) <br />h eq1 90in(Height of Equipment) <br />Weq1 2000lb(Weight of Equipment) <br />h g1 0in(Height above Ground) <br />EV SWBD-2 <br />weq2 32in(Width of Equipment) <br />leq2 30in(Length of Equipment) <br />h eq2 64in(Height of Equipment) <br />Weq2 402lb(Weight of Equipment) <br />h g2 0in(Height above Ground) <br />150kVA Transformer <br />weq3 37.3in(Width of Equipment) <br />(Length of Equipment)leq3 24in <br />(Height of Equipment)h eq3 35.6in <br />(Weight of Equipment)Weq3 1050lb <br />Page: 1 of 5 <br />909 N Grand Ave - <br />101116238 & 201806132/15/2024