My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
929 E Jonquil Rd - Plan
PBA
>
Building
>
ProjectDox
>
J
>
Jonquil Rd
>
929 E Jonquil Rd
>
929 E Jonquil Rd - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:19 PM
Creation date
6/1/2025 12:11:05 PM
Metadata
Fields
Template:
Plan
Permit Number
20181440
101117388
Full Address
929 E Jonquil Rd
Document Relationships
101117388 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Jonquil Rd\929 E Jonquil Rd
20181440 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Jonquil Rd\929 E Jonquil Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHECK WIND UPLIFT <br />Max Dead load per bracket = (Solar panel width/2*bracket spacing*Solar panel DL) <br />Bracket spacing = 6 ft <br />Dead load per bracket = 55.5 lbs <br />60% DL = 33.3 lbs <br />U = -36.39 psf (use wind zone "2,1OH") <br />U' = U*.6 = -21.83 psf <br />Trib area for wind load = Solar panel length/2*bracket spacing <br />Trib area for wind load =18.5 sq. ft. <br />Net Wind Uplift = Trib area*U'+60% DL <br />Net Wind Uplift = -682.74 lbs <br />Check 5/16" Lag screws (Min 2.5" embedment into (E) Beam) <br />Lag withdrawal (W') = W(Emb depth)(1.6) <br />W (per inch of embedment) for a 5/16" bolt = 266 lb. (per NDS table 12.2A) <br />Lag withdrawal (W') = 1064 lb. <br />W' > Net Wind uplift, OK <br />0 <br />23-1022-PV Page 811/1/2023 <br />929 E Jonquil Rd - <br />2018144011/27/2023
The URL can be used to link to this page
Your browser does not support the video tag.