My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
929 E Jonquil Rd - Plan
PBA
>
Building
>
ProjectDox
>
J
>
Jonquil Rd
>
929 E Jonquil Rd
>
929 E Jonquil Rd - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:19 PM
Creation date
6/1/2025 12:11:05 PM
Metadata
Fields
Template:
Plan
Permit Number
20181440
101117388
Full Address
929 E Jonquil Rd
Document Relationships
101117388 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Jonquil Rd\929 E Jonquil Rd
20181440 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Jonquil Rd\929 E Jonquil Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Type: <br />Occupancy Group: <br />Number of Stories: <br />Fire Sprinklers <br />Roof Type: <br />Main Service: <br />Module Make: <br />Module Model: <br />Module Count: <br />Inverter Make: <br />Inverter Model: <br />Inverter Count: <br />Battery Make: <br />Battery Model: <br />Battery Count: <br />Solar System DC Size: <br />Solar System AC Size <br />General Notes: <br />Site Plan <br />Scale: 1/16" = 1' <br />- Contractor shall take all the necessary precautions <br />when preparing roof for anchor point locations. <br />Building structure integrity is the responsibility of the <br />installer. Adjustments may be required due to existing <br />roof layout. <br />- Photovoltaic modules shall not be installed over any <br />attic, plumbing or mechanical vent(s). No building, <br />plumbing or mechanical vent(s) are to be covered or <br />obstructed. <br />- Wire runs are diagrammatic. All routes are subject <br />to change by the contractor due to field conditions. <br />All routes shall comply with CEC requirements. <br />- Working clearances around new and existing <br />equipment will be maintained in accordance with <br />CEC 110.26. Clear working space of 36" required in <br />front and 30" in width. <br />- All exposed conduit and equipment shall be painted <br />to match the background material color of its <br />location. <br />- Access Pathway and Setbacks: <br />Not fewer than two 36" wide pathways on separate <br />roof planes from lowest roof edge to ridge on all <br />buildings. <br />Ridge 18" min. (less than 33% array coverage) <br />Ridge 36" min. (more than 33% array coverage) <br />Edge 36" min. <br />R324.6.1, R324.6.2, CFC 1204.2.1.1, CFC 1204.2.1.2 <br />ESS Size 15 kWh <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />I <br />n <br />f <br />o <br />r <br />m <br />a <br />t <br />i <br />o <br />n <br />: <br />Jo <br />h <br />n <br /> <br />G <br />o <br />m <br />e <br />z <br />92 <br />9 <br /> <br />E <br /> <br />J <br />o <br />n <br />q <br />u <br />i <br />l <br /> <br />R <br />d <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />(7 <br />1 <br />4 <br />) <br /> <br />2 <br />9 <br />2 <br />- <br />9 <br />5 <br />9 <br />8 <br />jg <br />o <br />m <br />e <br />z <br />@ <br />m <br />i <br />n <br />d <br />s <br />p <br />r <br />i <br />n <br />g <br />. <br />c <br />o <br />m <br />ENPHASE <br />IQ8PLUS-72-2-US <br />20 <br />Project Manager: <br />October 31, 2023 <br />Drawing Number: <br />PPSI23030SOLAR-PV <br />PV1 <br />Co <br />n <br />t <br />r <br />a <br />c <br />t <br />o <br />r <br /> <br />I <br />n <br />f <br />o <br />r <br />m <br />a <br />t <br />i <br />o <br />n <br />: <br />License C10 #973253 <br />151 Kalmus Dr Ste L2 <br />Costa Mesa, CA 92626 <br />Contractor: <br />Matt Stoutenburg <br />(714) 258-3900 <br />Q.PEAK DUO BLK ML-G10+ 405 <br />VB <br />R3/U <br />ONE <br />NO <br />COMP SHINGLE <br />200 AMP <br />Q.CELLS <br />20 <br />7.40 kW <br />ENPHASE <br />IQBATTERY-5P-1P-NA <br />3 <br />8.1 kW <br />Maximum allowable span = 12 ft. <br />If any rafter supporting solar <br />components is found to exceed <br />the allowable span, the <br />contractor shall contact the <br />engineer of record for review and <br />a retrofit solution. <br />929 E Jonquil Rd - <br />2018144011/27/2023
The URL can be used to link to this page
Your browser does not support the video tag.