Laserfiche WebLink
END CAPS <br />End Caps add a completed look and keep debris and <br />pests from collecting inside rail. <br />Firmly press End Cap onto rail end. <br />►End Caps come in sets of left and right. Check that the proper <br />amount of each has been provided. <br />WIRE CLIPS <br />Wire Clips offer a simple wire management solution. <br />Firmly press Wire Clip into top rail slot. Run electrical wire <br />through open clip. Snap closed once all wires have been <br />placed. <br />QM QBOX <br />The QBox ™ is a flashed junction box with Quick Mount <br />PV patented Elevated Water Seal Technology ™, and <br />provides a waterproof pass-through for conduit from <br />the box enclosure to the attic. QBox comes equipped <br />with fasteners to install to the roof deck, and fittings for <br />optional through-the-deck conduit attachment. The QBox <br />is designed to transition or combine up to two (2) strings of <br />conductors utilizing user-supplied wiring components and <br />water-tight fittings. <br />For more information and full instructions please refer to <br />full QMPV Installation Manual. <br />►The QBOX is only certified for use on composition shingle roofs. <br />0 <br />u ' t <br />© 2021 IRON RIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL· 18 <br />MICROINVERTER KITS <br />Use lronRidge's Microinverter Kit to bond compatible <br />microinverters and power optimizers to the racking system. <br />Insert Microinverter Kit T-bolt into top rail slot. Place <br />compatible microinverter or power optimizer into position <br />and tighten hex nut to 80 in-lbs. <br />►If installing in areas with ground snow loads greater than 40 psf, <br />install MLPE devices directly next to module frame edge <br />COMPATIBLE PRODUCTS <br />Enphase <br />M250-72, 250-60, M215-60, C250-72, 5230, 5280, IQ 6, IQ 6+, IQ <br />IQ7, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q Aggregator <br />Darfon <br />MIG240,MIG300,G320,G640 <br />Solar Edge <br />M1600,P300,P320,P340,P370,P400,P401,P405,P485,P505, <br />P600,P700,P730,P800p,P800s,P801,P850,P860,P950, <br />P960, P1100 <br />SMA <br />RoofCommKit-P2-US, TS4-R Module Retrofit Kits (TS4-R-S, <br />TS4-R-O, TS4-R-F) <br />Tigo <br />Tigo Access Point (TAP) <br />TS4-R-X (where X can be F, M, 0, or S) <br />TS4-R-X-DUO (where X can be M, 0, or S) <br />TS4-A-X (where X can be F, 2F, O, O-DUO, or S) <br />AP Systems <br />QS1, YC600 <br />►Remove Grounding Washer on AP Systems QS1 and YC600 <br />inverters before installing to XR rails. <br />►Remove the Stainless Steel Clip on Tigo-"A" MLPE Devices <br />before attaching to XR rails. <br />►Use the number of lronRidge Microinverter kits allowed <br />by the MLPE mounting flange. Some will require 1 kit and <br />others 2 kits. <br />One Microinverter <br />Kil Required <br />(80 in-lbs) <br />On AP systems equipment, <br />remove Grounding Washer <br />SYSTEMS USING ENPHASE MICROINVERTERS OR SUNPOWER AC MOD- <br />Iron Ridge systems using approved Enphase products or Sun Power modules eliminate the need for lay-in lugs and field <br />installed equipment grounding conductors (EGC). This solution meets the requirements of UL 2703 for bonding and <br />grounding and is included in this listing. <br />COMPATIBLE PRODUCTS <br />Sunpower <br />Modules with model identifier Ab-xxx-YY and lnvisiMount (GS) 46mm frame; where "A" is either E, or X; "b" can be 17, 18, 19, 20, 21, or 22; <br />and "YY" can be C-AC, D-AC, BLK-C-AC, or BLK-D-AC. <br />Enphase <br />Microinverters M250-72, M250-60, M215-60, C250-72, and Engage cables ETXX-240, ETXX-208, ETXX-277. <br />► A minimum of two inverters mounted to the same rail and connected to the same Engage cable are required. <br />► The microinverters or Sunpower AC modules must be used with a maximum 20 A branch rated overcurrent protection device (OCPD). <br />► If an AC module is removed from a circuit for maintenance, you must first disconnect AC power and then install a temporary EGC to <br />bridge the gap by inserting an AC extension cable (or via other NEC-compliant means), in order to maintain effective ground continuity <br />to subsequent modules. <br />© 2021 IRON RIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL· 19 <br />929 E Jonquil Rd - <br />2018144011/27/2023