My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
929 E Jonquil Rd - Plan
PBA
>
Building
>
ProjectDox
>
J
>
Jonquil Rd
>
929 E Jonquil Rd
>
929 E Jonquil Rd - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:19 PM
Creation date
6/1/2025 12:11:05 PM
Metadata
Fields
Template:
Plan
Permit Number
20181440
101117388
Full Address
929 E Jonquil Rd
Document Relationships
101117388 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Jonquil Rd\929 E Jonquil Rd
20181440 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Jonquil Rd\929 E Jonquil Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Electrical Notes: <br />35.0 30.3 1 <br />N/A 1 <br />2 3/4" EMT #10 THWN-2 <br />Modules <br />Inverter & Battery <br />CEC Efficiency <br />97.0% <br />90.0% <br />Max Power <br />300 W <br />7.68 kVA (3 seconds) <br /># CCCFill <br />13.3%3 3/4" EMT #10 THWN-2 2 1 #10 35 1.001.00 <br />EGC Conductor <br />Ampacity <br />Temp <br />Factor <br />16.6% <br />2 1 #10 35 1.0013.3% <br />0.80 <br />1.00 <br />82ºF 110ºF 22ºF 49.1V <br />35.0 <br />Corrected <br />Ampacity <br />Max Current <br />125%Runs <br />1 3/4" EMT #10 THWN-2 4 N/A #10 35 0.87 24.4 15.1 1 <br />Tag Conduit Conductor Hots Neutral <br />20 ENPHASE 60.0 V 240 V 1.21 A <br />3 ENPHASE 86.4 V 240 V 16.0 A <br />IQ8PLUS-72-2-US <br />IQBATTERY-5P-1P-NA <br />QTY. Brand Max DC AC Voltage CurrentModel <br />45.34 V20 Q.CELLS Q.PEAK DUO BLK ML-G10+ 405 W 37.39 V 10.83 A 11.17 A 381.37 W <br />1. Contractor responsible for complying with all local and CEC code requirements and <br />manuals for installing a photovoltaic system. <br />2. All components must be grounded per CEC requirements. <br />3. Each module must be grounded according to installation requirements. <br />4. All photovoltaic equipment shall be listed and recognized per CEC. <br />5. Interconnection method shall comply with CEC 705.12 <br />6. CEC 310.15(B)(3)(c) Informational note 1: Ambient temperatures based off Ashrae.org by <br />averaging the summer months of June through August Dry-Bulb design then rounded to the <br />nearest whole number. <br />7. Rooftop conduit exposed to sunlight are applicable to CEC 310.15(B)(3)(c). <br />8. Notify service utility before activation of photovoltaic System. <br />9. When backfed breaker is the method of utility interconnection, breaker shall not read line <br />and load. <br />10. The photovoltaic and or ESS connection in the main service panel shall be positioned at <br />the opposite (load) end from the input feeder location or main circuit breaker. <br />11. All solar appurtenances shall be painted a color similar to the color of the surface upon <br />which they are mounted. <br />12. All metal conduit and enclosures shall be bonded with bushings and bonding jumpers. <br />13. Rails and modules are grounded using Ironridge XR10 grounding mid clamps, grounding <br />straps and ground lugs. (UL 2703) <br />14. In existing electrical systems that use only a water piping grounding electrode, an <br />additional grounding electrode shall be provided. Install: 5/8" x 10' (8' Min Depth) Copper <br />Ground Rod. (6' min from (E) G.E.) <br />15. Gateway monitoring system device installed in Enphase IQ AC Combiner+. <br />16. Rapid Shutdown is incorporated into Enphase micro-inverter architecture. [S/I] <br />17. Calculations shall be permitted to be rounded to the nearest whole ampere, with decimal <br />fractions smaller than 0.5 dropped. CEC 220.5(B) <br />Brand Model Pmax PPC Imp Isc PTC UL 1703OCV <br />System DC Size System AC Size Ambient Temp Record High Record Low Max System Voltage <br />8.1 kW 7.40 kW <br />Note: Value of capacity of conductors shall be used for 60/75 <br />degrees column per CEC Table 310.15(B)(16) unless <br />separately installed conductors and connectors are rated at <br />least 90 degrees. (90ºC Terminal Rating) Material Type: Cu <br />Note: The Enphase IQ Cable connector will be used in-lieu of a <br />separate AC Disconnect on the roof per 690.15. The AC and <br />DC connectors have been evaluated and approved by UL for <br />use as the load-break disconnect. <br />Type 2 <br />Fire Rating <br />A <br />QTY. <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />I <br />n <br />f <br />o <br />r <br />m <br />a <br />t <br />i <br />o <br />n <br />: <br />Contractor: <br />Matt Stoutenburg <br />Co <br />n <br />t <br />r <br />a <br />c <br />t <br />o <br />r <br /> <br />I <br />n <br />f <br />o <br />r <br />m <br />a <br />t <br />i <br />o <br />n <br />: <br />Costa Mesa, CA 92626 <br />151 Kalmus Dr Ste L2 <br />SOLAR-PV <br />November 1, 2023 <br />Drawing Number: <br />PPSI23030 <br />(714) 258-3900 <br />Project Manager: <br />License C10 #973253 <br />PV3 <br />Jo <br />h <br />n <br /> <br />G <br />o <br />m <br />e <br />z <br />92 <br />9 <br /> <br />E <br /> <br />J <br />o <br />n <br />q <br />u <br />i <br />l <br /> <br />R <br />d <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />(7 <br />1 <br />4 <br />) <br /> <br />2 <br />9 <br />2 <br />- <br />9 <br />5 <br />9 <br />8 <br />jg <br />o <br />m <br />e <br />z <br />@ <br />m <br />i <br />n <br />d <br />s <br />p <br />r <br />i <br />n <br />g <br />. <br />c <br />o <br />m <br />1 <br />4 3/4" EMT #6 THWN-2 2 1 #10 65 30.7% 1.00 <br />2 1 #8 100 36.8% 1.00 1.00 100.0 90.0 <br />1.00 100.0 90.3 1 <br />(See Note 17) <br />6 1" EMT #3 THWN-2 2 1 #8 100 36.8% 1.00 <br />1.00 65.0 60.0 1 <br />5 1" EMT #3 THWN-2 <br />929 E Jonquil Rd - <br />2018144011/27/2023
The URL can be used to link to this page
Your browser does not support the video tag.