Laserfiche WebLink
RFG J A� - lFARWA I SCH <br />SHEARWALL SCHEDULE <br />MARK SHEATHING NAIL EDGE FIELD SILL TO SILL TO ALLOW. SHEAR <br />SIZE NAIL NAIL SHEAR WALL ( 1 ) (2) SPACING SPACING WOOD CONN. (1) CONC. CONN. (1) (PLF) TYPE(3) <br />15/32 STR I O.S. 10d 6" 12" SDS1/4"x6" @ 16" 2x: 5/8"1/J A.B. @ 32"340 I 3x: 5/8"1/J A.B. @ 48" <br />15/32 STR I O.S. 10d 4" 12" SDS1/4"x6" @ 12" 3x: 5/8"1/J A.B. @ 32" 510 JI <br />ill 15/32 STR I O.S. 10d 3" STGR( 4) 12" SDS1/4"x6" @ 9" 3x: 5/8"1/J A.B. @ 24" 665 JI <br />In 15/32 STR I O.S. 10d 2" STGR( 4) 12" SDS1/4''x6" @ 6" 3x: 5/8"1/J A.B. @ 16" 870 JI <br />& 15/32 STR I D.S. 10d 4" 12" SDS1/4''x6" @ 6" 3x: 5/8"1/J A.B. @ 16" 1020 III <br />� 15/32 STR I D.S. 10d 3" STGR( 4) 12" SDS1/4''x6" @ 4" 3x: 5/8"1/J A.B. @ 12" 1330 K <br />A 15/32 STR I D.S. 10d 2" STGR( 4) 12" SDS1/4''x6" @ 3" 3x: 5/8"1/J A.B. @ 8" 1740 K <br />SHEARWALL NOTES: <br />(1)0.5. INDICATE5 5HEATI-HNG ON ONE 51DE OF WALL AS 5HOWN ON FLAN5.D.5. INDICATE5 DOU6LE 51DED 5HEARWALL: 5HEATHING ON 60TH 51DE5 OF WALL <br />(2)USE COMMON WIRE NAIL5 FOR ALL STRUCT-1 5HEATHING. <br />ESTRUCTURA USA, INC. <br />ADVANCED STRUCTURAL ENGINEERING <br />468 North Camden Orive #131E <br />Beverly Hills, CA. 90210 <br />Sheet: <br />Job. No: <br />Project: <br />41 <br />24-204 <br />2201 HALLADAY ST. <br />940 E Anahurst Pl & 2201 <br />S Halladay11/25/2024