My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
939 W Fairbrook Ln - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairbrook Ln
>
939 W Fairbrook Ln
>
939 W Fairbrook Ln - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:22 PM
Creation date
6/1/2025 12:11:08 PM
Metadata
Fields
Template:
Plan
Permit Number
20180285
101115827
Full Address
939 W Fairbrook Ln
Document Relationships
101115827 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fairbrook Ln\939 W Fairbrook Ln
20180285 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fairbrook Ln\939 W Fairbrook Ln
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 12:11 PM
Modified:
5/30/2025 5:09 PM
Text:
http://www.baruncorp.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RE:CERTIFICATION LETTER <br />Project Address:IRENE HAWES RESIDENCE <br />939 FAIRBOOK LANE <br />SANTA ANA, CA 92706 <br />Design Criteria: <br /> - Applicable Codes = 2022 CBC, 2022 CRC, 2021 IEBC/IBC, ASCE 7-16 and 2021 NDS <br /> - Risk Category = II <br /> - Wind Speed = 110 mph, Exposure Category C, Partially/Fully Enclosed Method <br /> - Ground Snow Load = 0 psf <br /> - Roof 1 - 5: 2 x 4 @ 24" OC, Roof DL = 9 psf, Roof LL/SL = 20 psf (Non-PV), Roof LL/SL = 0 psf (PV) <br />To Whom It May Concern, <br />March 29, 2023 <br />A structural evaluation of loading was conducted for the above address based on the design criteria listed above. <br />Existing roof structural framing has been reviewed for additional loading due to installation of Solar PV System on the roof. The structural <br />review applies to the sections of roof that is directly supporting the Solar PV System. <br />Based on this evaluation, I certify that the alteration to the existing structure by installation of the Solar PV System meets the prescriptive <br />compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. <br />specifications and to meet and/or exceed the requirements set forth by the referenced codes. <br />Sincerely, <br />Barun Corp | Design and Engineering | 610.202.4506 | chrisk@baruncorp.com | www.baruncorp.com <br />939 W Fairbrook <br />Ln07/19/23
The URL can be used to link to this page
Your browser does not support the video tag.