Laserfiche WebLink
BARUN CORP CEBC IMPACT CHECK <br />Roof 1 - 5 <br />IRENE HAWES RESIDENCE, 939 FAIRBOOK LANE, SANTA ANA, CA 92706 <br />psf <br />psf <br />psf <br />psf <br />psf <br />psf <br />-41.97% OK <br />12.20 <br />0.00 <br />EXISTING <br />9.20 <br />WITH PV PANELS <br />Roof Live Load (Lr) = <br />WITH PV PANELS <br />13.56 <br />10.61 <br />13.56 <br />Roof Snow Load (SL) =0.00 <br />Roof Dead Load (DL) = <br />20.00 <br />0.00 <br />EXISTING <br />The requirements of section 502.4 of 2022 CEBC are met and the structure is permitted to remain unaltered. <br />Load Increase (%) = <br />(DL + Lr)/Cd = <br />(DL + SL)/Cd = <br />Maximum Gravity Load = <br />23.36 <br />8.00 <br />23.36 <br />Barun Corp | Design and Engineering | 610.202.4506 | chrisk@baruncorp.com | www.baruncorp.com <br />939 W Fairbrook <br />Ln07/19/23