My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CANCELLED- 2341 S Park Dr - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Park Dr
>
2341 S Park Dr
>
CANCELLED- 2341 S Park Dr - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:22 PM
Creation date
6/1/2025 12:11:09 PM
Metadata
Fields
Template:
Plan
Permit Number
20181849
101117918
Full Address
2341 S Park Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conclusions <br />Princeton Engineering was asked to review the roof of Johnathan Jimenez, located at 2341 Park Dr, Santa Ana, <br />CA, by Mona Lee Solar, to determine its suitability to support a PV solar system installation. <br />The referenced building's roof structure was field measured by Mona Lee Solar. The attached framing analyses <br />reflect the results of those field measurements combined with the PV solar module locations shown on the PV <br />solar roof layout design prepared by Mona Lee Solar. Loads are calculated to combine the existing building and <br />environmental loads with the proposed new PV array loads. <br />Mona Lee Solar selected the Everest CrossRail 44-X racking with IronRidge All Tile Hook stanchions for this <br />project. The racking and support stanchions shall be placed as shown on their plans, dated 09/14/2023, and shall <br />be fastened to the roof framing using fastener sizes indicated in this report. Rack support spacing shall be no <br />more than that shown above. Note that support points for alternating rows shall share the same roof support <br />member. Intermediate rows shall move the support points laterally to the next roof support member. <br />7-10 NE 03.jpg <br />Google Location Map <br />Framing Summary <br />Based upon the attached calculations, the existing roof's framing system is capable of supporting the additional <br />loading for the proposed PV solar system along with the existing building, seismic and environmental loads. No <br />supplemental roof framing structural supports are required. Minimum required anchorage fastening is described <br />above. <br />References and Codes: <br />1) ASCE 7-16 Minimum Design Loads for Buildings and Other Structures <br />2) IBC 2021 <br />3) 2022 CBC and 2022 CRC <br />4) American Wood Council, NDS 2018,Table 12.2A, 12.3.3A. <br />5) American Wood Council, Wood Structural Design, 1992, Figure 6. <br />Notes: (1) Bolt threads must be embedded in the side grain of a roof support structural member or other structural <br />member integrated into the building's structure. (2) Lag bolts must be located in the middle third of the structural <br />member. (3) Install lag bolts with head and washer flush to surface (no gap). Do not over-torque. <br />Loading Summary R iRooFATM Copyright © 2020 Richard Pantel. All Rights Reserved.4 of 9 <br />2341 S Park Dr - <br />10-26-231/22/2024
The URL can be used to link to this page
Your browser does not support the video tag.