Laserfiche WebLink
STRUCTURAL <br />NOTES <br />SN1 <br />SHEET: <br />ISSUE DATES: <br />DATE: <br />PROJECT NUMBER: <br />SUBMITTAL <br />SET <br />STAMP: <br />CONSULTANT: <br />1 <br />2 <br />3 <br />4 <br />5 <br />RO <br />S <br />S <br /> <br />C <br />O <br />M <br />M <br />O <br />N <br /> <br />A <br />P <br />T <br /> <br />R <br />E <br />M <br />O <br />D <br />E <br />L <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />0 <br />7 <br />23L2127 <br />10-23-24 <br />12 <br />2 <br />3 <br /> <br />N <br />. <br /> <br />R <br />O <br />S <br />S <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />REMODEL/ADDITION <br />PROJECT ADDRESS: <br />Description of Work: <br />Owner:Architect:Engineer: <br />PERMIT APPL. NO.: <br />STRUCTURAL OBSERVATION <br />(ONLY CHECKED ITEMS ARE REQUIRED) <br />Firm or Individual to be responsible for the Structural Observation: <br />Name: <br />FOUNDATION WALL FRAME DIAPHRAGM <br />Concrete <br />Masonry <br />Wood <br />Others: <br />Footing, Stem Walls, Piers <br />Mat Foundation <br />Caisson, Piles, Grade Beams <br />Stepp'g/Retain'g Foundation, <br />Hillside Special Anchors <br />Others: <br />Concrete <br />Steel Deck <br />Wood <br />Others: <br />Steel Moment Frame <br />Steel Braced Frame <br />Concrete Moment Frame <br />Masonry Wall Frame <br />Others: HFX <br />DECLARATION BY OWNER <br />I, the Owner of the project, declare that the above listed firm or individual is hired <br />by me to be the Structural Observer. <br />Signature Date <br />Phone:Calif. Registration: <br />NOTE: <br />STRUCTURAL ENGINEER SHALL BE <br />NOTIFIED OF ANY SITE MEETING OR <br />STRUCTURAL OBSERVATION AT LEAST <br />48 HRS IN ADVANCE OF APPOINTMENT <br />DATE. <br />1223 N. ROSS STREET SANTA ANA CA 92701 <br />LUIS A. LABRADA <br />LUIS A. LABRADA 65416619-370-9515 <br />HOLD - 1223 N Ross <br />St3/4/2025