Laserfiche WebLink
FILL TANK WITH AIR <br />PRESSURE TO MATCH <br />WATER PRESSURE, <br />THEN OPEN VALVE <br />WELDED STEEL EXPANSION <br />TANK WITH POLYPROPYLENE <br />LINING, FDA APPROVED FOR <br />DOMESTIC WATER SERVICE <br />PIPE UNION: <br />DIELECTRIC IF <br />REQUIRED FOR <br />DISSIMILAR METALS <br />BUTYL DIAPHRAGM <br />FROM CW SUPPLY TO <br />HEATER, NO <br />INTERVENING VALVES <br />PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT <br />FIELD CONDITIONS. MAKE PIPE SAME SIZE AS TANK FITTING. <br />FOLLOW MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br />PROCEDURE. VERIFY PROPER OPERATION WHEN INSTALLED. <br />EXPANSION TANK DETAIL 5 <br />SCALE <br />N.T.S <br />SEISMIC STRAPPING FOR <br />BRACING IN SEISMIC AREAS <br />PROVIDE WCO WHERE SHOWN ON PLAN, AND ON <br />SANITARY WASTE BRANCHES NOT SERVED WITH A <br />FLOOR CLEANOUT: LOCATED ABOVE FIXTURE FLOOR <br />RIM WITHIN 4'-0" OF FLOOR. CONSULT LOCAL CODES <br />FOR OTHER WCO REQUIREMENTS. <br />RISER LENGTH AS REQUIRED <br />LONG SWEEP AT <br />END OF LINE OR <br />COMBINATION WYE <br />AND EIGHTH BEND <br />IN RUN OF LINE. <br />INSTALL ESCUTCHEON <br />PLATE AT CLEANOUT TEE. <br />PROVIDE SCREWED <br />COUNTER-SINK BRONZE <br />PLUG FOR CLEANOUT TEE <br />WITH TAPPED THREAD & <br />TEE JOINT COMPOUND <br />CONCRETE FLR. <br />WASTE OR <br />VENT TO <br />ABOVE <br />PLUMBING WALL OR <br />COLUMN REFER TO <br />FLOOR PLANS <br />PROVIDE <br />WATERPROOFING <br />2 <br />SCALE <br />N.T.S <br />NOTE: <br />DIRECTION <br />OF FLOW <br />WALL CLEANOUT DETAIL <br />PIPE INSULATION <br />INSULATION SHALL BE RUN <br />CONTINUOUS THRU HANGERS <br />PIPE <br />INSULATION PROTECTION SHIELD. USE 16 GAUGE <br />SHEET STEEL, 2 PIPE DIAMETERS LONG, 120 <br />DEGREES SUPPORT, OR GRINNEL FIGURE 167. <br />HANGER ROD <br />PROVIDE GALV. STEEL SHIELD FOR ALL <br />INSULATED PIPE.VERIFY INSULATION THICKNESS <br />WHEN SIZING HANGERS AND SHIELDS. <br />ADJUSTABLE BAND HANGER <br />FOR PIPE 3-1/2" AND SMALLER <br />AND CAST IRON PIPE 2" AND <br />SMALLER <br />HANG PIPE LARGER THAN 4" <br />FROM TOP OF JOISTS ONLY AT <br />PANEL POINT <br />SIDE BEAM CONNECTOR <br />ATTACHED TO TOP CHORD OF <br />WOOD TRUSS <br />PROVIDE COPPER COATED <br />HANGERS WHERE <br />HANGERS CONTACT BARE <br />COPPER PIPE <br />PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. <br />DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE PENETRATE <br />VAPOR BARRIER. DO NOT HANG ONE PIPE FROM ANOTHER EXCEPT IN CHASES. <br />SLOPE ALL WATER PIPING SLIGHTLY TOWARD DRAINABLE LOCATIONS. HANGER <br />SPACING FOR PIPE SIZES: AS INDICATED IN TABLE. CAST IRON: 10' AND WITHIN <br />1'-0" OF ALL JOINTS. ROD SIZES FOR PIPE SIZE: 1/2" TO 4" = 3/8", 5" TO 8" = 1/2", <br />10" TO 12" = 5/8". LOCATE HANGERS WITHIN 1'-0" OF VALVES AND FITTINGS. <br />PROVIDE SUPPLEMENTAL STEEL STRUTS BETWEEN JOISTS IF REQUIRED. <br />LOCATE HANGERS WITHIN 1'-0" OF EQUIPMENT CONNECTIONS. ANCHOR WATER <br />PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. CHAINS AND <br />PERFORATED STRAP IRON AND STEEL ARE NOT ACCEPTABLE. DO NOT <br />SUSPEND PIPE FROM JOIST BRACING MEMBERS. REFER TO CODES AND <br />SPECIFICATIONS FOR FURTHER INFORMATION. PROVIDE SEISMIC BRACING AS <br />REQUIRED BY LOCAL AUTHORITIES. PROVIDE FIBERGLASS INSULATION WITH <br />ALL-SERVICE JACKET WITH VAPOR BARRIER ON ALL SIZES OF HOT AND COLD <br />WATER AND CONDENSATE PIPING. GAS PIPING SHALL BE KEPT A MIN. OF 6" <br />ABOVE GRADE OR STRUCTURE. <br />GAS PIPE SUPPORT <br />STEEL PIPE, <br />NOMINAL SIZE OF <br />PIPE (INCHES) <br />SPACING OF <br />SUPPORTS <br />(FEET) <br />NOMINAL SIZE OF <br />TUBING <br />SMOOTH-WALL <br />(INCHES O.D.) <br />SPACING <br />OF <br />SUPPORTS( <br />FEET) <br />1/2 6 1/2 4 <br />3/4 OR 1 8 5/8 OR 3/4 6 <br />1-1/4 OR LARGER <br />(HORIZONTAL)10 7/8 OR 1 <br />(HORIZONTAL)8 <br />1-1/4 OR LARGER <br />(VERTICAL <br />EVERY FLOOR <br />LEVEL <br />1 OR LARGER <br />(VERTICAL) <br />EVERY <br />FLOOR <br />LEVEL <br />1 <br />SCALE <br />N.T.S <br />6'1-1/2" <br />10'4" <br />10' <br />10' <br />10' <br />2-1/2" <br />3" <br />2" <br />ALL-THREAD ROD <br />CO <br />P <br />P <br />E <br />R <br /> <br />P <br />I <br />P <br />E <br />HA <br />N <br />G <br />E <br />R <br /> <br />S <br />P <br />A <br />C <br />I <br />N <br />G <br />6'1/2"1/2" <br />6'3/4" <br />6' <br />6' <br />1-1/4" <br />1" <br />PI <br />P <br />E <br /> <br />S <br />I <br />Z <br />E <br />WOOD STRUCTURE <br />CL <br />LC <br />STEEL STRUCTURE SECTION <br />PIPE HANGER DETAIL (BELOW ROOF) <br />WATER PIPE <br />SUPPORT: <br />ELMDOR/STONEMAN, MODEL <br />#1100-4 SEALANT SHALL BE <br />APPLIED AROUND PIPE OPENING <br />THRU COUNTER FLASHING <br />SLEEVE FOR WATER TIGHT SEAL <br />BUILT-UP ROOFING <br />APPLY PERMASEAL WATER <br />PROOFING COMPOUND <br />AROUND PIPE, COUNTER <br />FLASHING SLEEVE & <br />FLASHING FOR WATER <br />TIGHT SEAL. <br />SEAMLESS LEAD FLASHING <br />OVER STEEL REINFORCED <br />BOOT <br />INSTALL (3) <br />VANDAL- PROOF <br />SET SCREWS <br />8" MIN. <br />BOOT <br />HEIGHT <br />5" MIN. <br />12" MIN. <br />PIPE THRU ROOF <br />3 <br />SCALE <br />N.T.S <br />2" MIN. <br />PIPING THRU ROOF DETAIL <br />THERMOMETER (TYPICAL) <br />RECIRCULATION PUMP <br />CHECK VALVE (TYPICAL) <br />HOSE BIBB DRAIN VALVE (TYPICAL) <br />H.W. <br />SUPPLY LINE <br />REFER TO PLANS <br /> COLD WATER SUPPLY <br />CHECK VALVE (TYPICAL)H.W. RETURN <br />EXPANSION TANK <br />ASME T. & P. RELIEF VALVE. FULL <br />SIZE DISCHARGE LINE DRAINS TO <br />(TYPICAL) <br />GAS WATER HEATER IN PARALLEL DETAIL <br />SCALE <br />N.T.S <br />AIR RELEASE VALVE <br />WH <br />G DRIP LEG <br />GAS SUPPLY LINE <br />WH <br />(INSTALL PER MANUFACTURER'S <br />INSTRUCTIONS) <br />UNION (TYPICAL) <br />GATE VALVE (TYPICAL) <br />SEISMIC STRAPS AT LOWER 1/3 <br />AND UPPER 1/3 OF TANK (UPC 510.5) <br />SHUT-OFF VALVE (TYPICAL) <br />G <br />4 <br />GAS FLUE <br />HUB DRAIN <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />SHEET TITLE: <br />DATE: SCALE: <br />GA <br />R <br />F <br />I <br />E <br />L <br />D <br /> <br />R <br />E <br />S <br />T <br />O <br />R <br />A <br />T <br />I <br />O <br />N <br /> <br />/ <br /> <br />R <br />E <br />M <br />O <br />D <br />E <br />L <br />03/05/2023 <br />PLOT DATE: 6/26/2024 3:28:46 PM <br />CD <br />I <br /> <br />Ci <br />r <br />c <br />a <br /> <br />D <br />o <br />m <br />i <br />n <br />i <br /> <br />I <br />n <br />t <br />e <br />r <br />n <br />a <br />t <br />i <br />o <br />n <br />a <br />l <br />, <br /> <br />I <br />n <br />c <br />. <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />- <br /> <br />C <br />o <br />n <br />s <br />u <br />l <br />t <br />i <br />n <br />g <br />98 <br />9 <br />0 <br /> <br />R <br />e <br />s <br />e <br />a <br />r <br />c <br />h <br /> <br />D <br />r <br />. <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />1 <br />0 <br />0 <br />, <br /> <br />I <br />r <br />v <br />i <br />n <br />e <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />Ph <br />o <br />n <br />e <br /> <br />( <br />9 <br />4 <br />9 <br />) <br /> <br />5 <br />3 <br />3 <br />- <br />4 <br />1 <br />1 <br />7 <br /> <br />| <br /> <br />d <br />k <br />a <br />n <br />g <br />@ <br />c <br />d <br />i <br />e <br />n <br />g <br />. <br />c <br />o <br />m <br />82 <br />9 <br /> <br />N <br /> <br />G <br />A <br />R <br />F <br />I <br />E <br />L <br />D <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />DRAWN: CHECKED: <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />V <br />. <br /> <br />0 <br />4 <br />/ <br />2 <br />7 <br />/ <br />2 <br />0 <br />2 <br />3 <br />PL <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />V <br />. <br /> <br />0 <br />9 <br />/ <br />2 <br />8 <br />/ <br />2 <br />0 <br />2 <br />3 <br />IN <br />S <br />P <br />E <br />C <br />T <br />I <br />O <br />N <br /> <br />R <br />E <br />V <br />. <br /> <br />0 <br />6 <br />/ <br />1 <br />9 <br />/ <br />2 <br />0 <br />2 <br />4 <br />P001 <br />M 37036 <br />Exp. 9-30-24 <br />UNGSUN KAHCGN <br />L.C.A.N. <br />PLUMBING DETAILS <br />N.T.S. <br />3 <br />HOLD- 829 N <br />Garfield St1/15/2025