GENERAL NOTES <br />A. NOTIFY SERVING UTILITY PRIOR TO ACTIVATION OF PV SYSTEM; APPROVAL FROM BOTH THE LOCAL <br />JURISDICTION AND THE UTILITY IS REQUIRED PRIOR TO INTERCONNECTION. <br />B. DIG ALERT (811) IS TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY IN ACCORDANCE <br />WITH GOVERNMENT CODE 4216 WILL BE FOLLOWED PRIOR TO ANY EXCAVATION TAKING PLACE. <br />NOTES TO INSTALLER <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA GREEN CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ENERGY CODE <br />ANY SANTA ANA CITY MUNICIPAL CODES & AMENDMENTS <br />APPLICABLE CODES & STANDARDS <br />NATIONAL POLLUTANT DISCHARGE <br />ELIMINATION SYSTEM (NPDES) NOTES <br />1. IN THE CASE OF EMERGENCY, CALL ___________________AT WORK PHONE <br />#___________________OR HOME PHONE #___________________. <br />2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING <br />STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE. <br />3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT <br />FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA RUNOFF, <br />VEHICLE TACKING, OR WIND. <br />4. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS SHALL BE <br />IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, <br />OR ADJOINING PROPERTIES BY WIND OR RUNOFF. <br />5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT CONSTRUCTION <br />SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER POLLUTANTS. <br />6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE MADE <br />AWARE OR THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING <br />MEASURES FOR THE PROJECT SITE AND ANY ASSOCIATED CONSTRUCTION STAGING AREAS. <br />7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND <br />WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN TRASH OR RECYCLE <br />BINS. <br />8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED <br />STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE. DISCHARGES OF MATERIAL <br />OTHER THAN STORMWATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION <br />OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A <br />VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, <br />CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY <br />REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302. <br />9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL <br />SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, <br />WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO <br />FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; <br />FERTILIZERS, VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE, <br />DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM <br />CLEANING OR CHEMICAL DEGREASING AND SUPER-CHLORINATED POTABLE WATER LINE <br />FLUSHING. DURING CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH MATERIALS IN A <br />SPECIFIED AND CONTROLLED TEMPORARY AREA ON-SITE, PHYSICALLY SEPARATED FROM <br />POTENTIAL STORMWATER RUNOFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, <br />STATE AND FEDERAL REQUIREMENTS. <br />10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS <br />VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER <br />REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE <br />RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. <br />11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE <br />OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS TO BE DIRECTED <br />TOWARD DESILTING FACILITIES. <br />12. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY <br />PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER <br />CREATES A HAZARDOUS CONDITION. <br />13. THE PERMITTEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND <br />INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS. <br />14. THE PERMITTEE SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS, <br />MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF CHEMICALS INTO <br />THE STORM DRAIN SYSTEM OR THE WATERSHED IS PROHIBITED. <br />15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL <br />TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND <br />STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF <br />TEMPORARY DEVICES WHEN RAIN IS IMMINENT. <br />16. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH <br />WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY FORECAST EXCEEDS 40%. <br />17. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE <br />USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE MAXIMUM <br />EXTENT PRACTICABLE, AND STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO <br />MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OF <br />ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TRACKING, OR WIND. <br />18. APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS OR <br />RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE TRANSPORT FROM <br />THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTY BY WIND OR RUNOFF. <br />INFINITY SOLAR, INC. <br />749 N MAIN ST. <br />ORANGE, CA 92868 <br />PHONE: (714) 880-8089 <br />LIC NO.: C10 - 824287 <br />TIM POLUJANCEWICZ <br />REVISIONS <br />SHEET LIST TABLE <br />SCALE: 1/32" = 1'-0" <br />SITE PLAN <br />PV.01A COVER SHEET <br />PV.01B BATTERY NOTES <br />PV.02 ROOF & FIRE PLAN <br />PV.03A & B STRUCTURAL DETAILS <br />PV.04 THREE LINE DIAGRAM <br />PV.05 ELECTRICAL CALCULATIONS <br />PV.06 LABELS <br />PV.07 PLACARD MAP <br />MM MICROINVERTER MAP <br />LC LOAD CALCULATIONS <br />SPEC SPECIFICATION SHEETS <br />AUTHORITIES HAVING JURISDICTION <br />AHJ: SANTA ANA CITY <br />UTILITY: SCE <br />LOT INFORMATION <br />APN: 198-261-34 <br />LOT AREA: 0.91 ACRES <br />LIVING AREA: 1850 SQ. FT. <br />DESIGN SPECIFICATIONS <br />OCCUPANCY: R-3.1 <br />CONSTRUCTION: V-B <br />ZONING: RESIDENTIAL <br />SNOW LOAD: 0 <br />WIND EXPOSURE: C <br />WIND SPEED: 95 MPH <br />ROOF SURFACE: 2757 <br />PV COVERAGE: 902.96 <br />OF STORIES: ONE <br />FIRE SPRINKLERS: NO <br />MODULE:(43) HANWHA QCELLS Q.TRON BLK M-G2+ 425 <br />INVERTER:(43) ENPHASE IQ8A-72-2-US [240V] <br />MOUNT 1:(50) EVERFLASH ECOMP KIT <br />MOUNT 2:(06) PROSOLAR FASTJACK 6" <br />MOUNT 3:(32) PROSOLAR FASTJACK 6" <br />RAILING:RACKING-48-X RAILS <br />MSP UPGRADE:NO <br />SCOPE OF WORK: <br />PROJECT INFORMATIONSYSTEM COMPONENTS <br />ALL WORK SHALL COMPLY WITH APPLICABLE, LOCAL, <br />MUNICIPAL CODES, AND TO MANUFACTURERS' <br />LISTINGS AND INSTALLATION INSTRUCTIONS. <br />ADDITIONAL INSTALLATION NOTES <br />AERIAL IMAGE <br />SITE PLAN LEGEND KEY <br />MAIN ELECTRICAL PANEL <br />PV & ESS EQUIPMENT <br />PROPERTY LINE <br />FENCE <br />FIRE SETBACKS & <br />PROPOSED PATHWAYS <br /> INSTALLATION OF NEW BATTERY BACKUP: (4) FRANKLIN APOWER X [240V] (13.6 kWH EACH) <br />BATTERY:(4) FRANKLIN APOWER X [240V] <br />SEE RESPONSE LETTER FOR DETAILS <br />N <br />DRAWN BY: <br />PAPER: 11X17 (ANSI B) DATE: <br />DESIGN LEAD: <br />DESIGNED BY SOLAR DEPLOYED, LLC. <br />931 10TH ST #114, MODESTO, CA 95354 <br />209-671-2001 | HELLO@SOLARDEPLOYED.COM <br />SIGNATURE: <br />CHECKED BY: <br />7/23/2024 <br />T.M. <br />C.B. T.M. <br />SHEET NAME: <br />NEW PV SYSTEM <br /> 18.275 kW DC (STC-DC) | 16.642 kW (CEC-AC) <br />SARAH HAMMARSTROM <br />403 N SUSAN ST BLDG #E, <br />SANTA ANA, CA 92703 <br />APN: 198-261-34 <br />SHEET NO.: <br />ENGINEER OF RECORD <br />40 <br />3 <br /> <br />N <br /> <br />S <br />U <br />S <br />A <br />N <br /> <br />S <br />T <br />DRIVEWAY <br />COVER SHEET PV.01A <br /> INSTALLATION OF NEW PV SYSTEM: 18.275 kW DC (STC-DC) | 16.642 kW (CEC-AC) | 15.007 kW AC (INVERTER) <br />(N) PV SYSTEM FOR HAMMARSTROM RESIDENCE | 403 N SUSAN ST BLDG #E, SANTA ANA, CA 92703 <br />SYSTEM SIZE: 18.275 kW DC (STC-DC) | 16.642 kW (CEC-AC) | 15.007 kW AC (INVERTER) <br />BLDG. EBLDG. DBLDG. C <br />BLDG. B <br />BLDG. G <br />BLDG. H <br />BLDG. A <br />BLDG. F <br />SEE PV.02 FOR ADDITIONAL DETAILS <br />THIS DETACHED PATIO IS PART OF <br />THE OCCUPANCY OF BUILDING E <br />(BUILDING PERMIT NO.: 101104927) <br />DETACHED PATIO OF BLDG. E <br />A AHJ CORRECTIONS08.14.23 <br />A <br />A <br />Bldg# 101119805 <br />Elec# 20183212 <br /> <br />APPROVALS: <br />PLNG - ASevilla <br />BLDG - JLo <br />ELEC - MSmith <br />403 N Susan St Bldg# E - <br />101119805 & 201832129/23/2024