My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
403 N Susan St Bldg# E - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Susan St
>
403 N Susan St Bldg# E
>
403 N Susan St Bldg# E - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:31:27 AM
Creation date
6/5/2025 7:31:18 AM
Metadata
Fields
Template:
Plan
Permit Number
20183212
101119805
Full Address
403 N Susan St Bldg# E
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Email us for more information <br />prosolar@prosolar.com <br />FastJack® FJ-300-18 <br />For Oatey® style flashings <br />FastJack® FJ-450-18 <br />For standard metal flashings <br />3" High Part# FJ-300-18 <br />For low profile installations using Oatey® flashings (for composition shingle roof-tops) <br />4-1/2" High Part# FJ-450-18 <br />For installations using standard flashings (for composition & flat rooftops) <br />6" High Part# FJ-600-18 <br />For standard flashings (for flat tile rooftops) <br />7-1/2" High Part# FJ-750-18 <br />For standard flashings (sized for S-curve tile roofs and/or double flashed installations) <br />The Fast Jack® design is covered under Pat. #6,360,491 <br />Laboratory Tested <br />2,359 lbs <br />Vertical Pullout! <br />lbs <br />Side Lat <br />808 <br />eral Pullout!* <br />Benefits of the FastJack® <br /> Removable post makes installation on existing <br />roofs/retrofit quick and easy (refer to the <br />illustration to the right) <br /> Patented design locates the lag bolt directly under <br />the stanchion providing superior strength values <br /> Fast & easy to install—saves time and labor costs <br /> Precision machined from extruded aluminum, there <br />are no welds to corrode or break <br /> Significantly lighter than steel for installer <br />convenience and reduced shipping costs. <br /> Integrated drill guide insures perfect pilot holes <br />every time —minimizes the possibility of splitting <br />roof rafters <br /> Base design allows virtually any roof flashing to <br />install flat on the roof deck <br />Serrated base grips the roof <br />deck to prevent the base <br />from moving while installing <br />the lag bolt <br />Flashable Roof Stanchion <br />The patented design of the FastJack® is the most innovative, efficient and cost-effective tool of <br />it's kind! The FastJack® has been laboratory tested to provide 2,359 pounds of strength using <br />only a single lag bolt (included)! <br />Four Sizes Available! <br />*Using 1ea. 5/16" x 3-1/2" Lag Bolt <br />RAFTER <br />Easy installation of <br />flashings on existing <br />roof-tops See reverse for <br />installation theory <br />Standard & Oatey® Flashings <br />slip over the base and under the <br />delicate shingle <br />The post can be <br />installed through <br />the top of the <br />flashing <br />(805)805) 486 <br />(805)805) 486-4 ax <br />1551 S. Rose Ave. <br />Oxnard, CA 93033 <br />View more info on ourwebsite at: <br />www.prosolar.com <br />© Professional Solar Products, Inc. February 2015. <br />All FastJack® attachments are sold in heavy duty reclosable <br />boxes which allow for easy storage and handling <br />Box includes: <br />(1 8)Aluminum Bases <br />(1 8)1" dia. Aluminum Po sts (18) 3/8" SS Flat Washers <br />(18)) 5 6" x 3-1/2" Lag Bolts <br />(1 8)3/8" x 3/4" SS Bolts <br />UL2703* <br />Step 7: Seal S lashing around the <br />post to waterproof <br />Easy Installation: (See FastJack® installation video at: www.prosolar.com) <br />Flashing Template <br />Available for Oatey <br />(Pictured) and standard <br />flashings. Makes cutting in <br />a perfect flashing easy! <br />© Professional Solar Products, Inc. February 2015. FastJack © is a registered trademark and covered under Pat.#6,360,491 <br />Step 2: Install base using <br />included lag into pilot hole <br />Step 3: Cut through shingles <br />for flashing (flashing template <br />illustrated below) <br />Step 1: Drill Pilot hole in Rafter <br />using integrated drill guide <br />Carbide bit <br />recommended <br />to break <br />through roof <br />material before <br />drilling <br />INCORRECTCORRECT <br />Step 4: Temporarily hold post <br />in place by inserting upwards aligning post and base <br />Step 6: Tighten post onto base <br />403 N Susan St Bldg# E - <br />101119805 & 201832129/23/2024
The URL can be used to link to this page
Your browser does not support the video tag.