SUB
<br />GENERAL NOTES
<br />A. NOTIFY SERVING UTILITY PRIOR TO ACTIVATION OF PV SYSTEM; APPROVAL FROM BOTH THE LOCAL
<br />JURISDICTION AND THE UTILITY IS REQUIRED PRIOR TO INTERCONNECTION.
<br />B. DIG ALERT (811) IS TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY IN ACCORDANCE
<br />WITH GOVERNMENT CODE 4216 WILL BE FOLLOWED PRIOR TO ANY EXCAVATION TAKING PLACE.
<br />NOTES TO INSTALLER
<br />2022 CALIFORNIA BUILDING CODE
<br />2022 CALIFORNIA RESIDENTIAL CODE
<br />2022 CALIFORNIA ELECTRICAL CODE
<br />2022 CALIFORNIA FIRE CODE
<br />2022 CALIFORNIA MECHANICAL CODE
<br />2022 CALIFORNIA GREEN CODE
<br />2022 CALIFORNIA PLUMBING CODE
<br />2022 CALIFORNIA ENERGY CODE
<br />ANY SANTA ANA CITY MUNICIPAL CODES & AMENDMENTS
<br />APPLICABLE CODES & STANDARDS
<br />NATIONAL POLLUTANT DISCHARGE
<br />ELIMINATION SYSTEM (NPDES) NOTES
<br />1. IN THE CASE OF EMERGENCY, CALL ___________________AT WORK PHONE
<br />#___________________OR HOME PHONE #___________________.
<br />2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING
<br />STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE.
<br />3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT
<br />FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA RUNOFF,
<br />VEHICLE TACKING, OR WIND.
<br />4. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS SHALL BE
<br />IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES,
<br />OR ADJOINING PROPERTIES BY WIND OR RUNOFF.
<br />5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT CONSTRUCTION
<br />SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER POLLUTANTS.
<br />6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE MADE
<br />AWARE OR THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING
<br />MEASURES FOR THE PROJECT SITE AND ANY ASSOCIATED CONSTRUCTION STAGING AREAS.
<br />7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND
<br />WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN TRASH OR RECYCLE
<br />BINS.
<br />8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED
<br />STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE. DISCHARGES OF MATERIAL
<br />OTHER THAN STORMWATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION
<br />OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A
<br />VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION,
<br />CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY
<br />REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302.
<br />9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL
<br />SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES,
<br />WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO
<br />FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS;
<br />FERTILIZERS, VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE,
<br />DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM
<br />CLEANING OR CHEMICAL DEGREASING AND SUPER-CHLORINATED POTABLE WATER LINE
<br />FLUSHING. DURING CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH MATERIALS IN A
<br />SPECIFIED AND CONTROLLED TEMPORARY AREA ON-SITE, PHYSICALLY SEPARATED FROM
<br />POTENTIAL STORMWATER RUNOFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL,
<br />STATE AND FEDERAL REQUIREMENTS.
<br />10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS
<br />VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER
<br />REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE
<br />RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD.
<br />11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE
<br />OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS TO BE DIRECTED
<br />TOWARD DESILTING FACILITIES.
<br />12. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY
<br />PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER
<br />CREATES A HAZARDOUS CONDITION.
<br />13. THE PERMITTEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND
<br />INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS.
<br />14. THE PERMITTEE SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS,
<br />MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF CHEMICALS INTO
<br />THE STORM DRAIN SYSTEM OR THE WATERSHED IS PROHIBITED.
<br />15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL
<br />TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND
<br />STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF
<br />TEMPORARY DEVICES WHEN RAIN IS IMMINENT.
<br />16. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH
<br />WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY FORECAST EXCEEDS 40%.
<br />17. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE
<br />USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE MAXIMUM
<br />EXTENT PRACTICABLE, AND STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO
<br />MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OF
<br />ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TRACKING, OR WIND.
<br />18. APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS OR
<br />RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE TRANSPORT FROM
<br />THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTY BY WIND OR RUNOFF.
<br />INFINITY SOLAR, INC.
<br />749 N MAIN ST.
<br />ORANGE, CA 92868
<br />PHONE: (714) 880-8089
<br />LIC NO.: C10 - 824287
<br />TIM POLUJANCEWICZ
<br />REVISIONS
<br />SHEET LIST TABLE
<br />SCALE: 1/40" = 1'-0"
<br />SITE PLAN
<br />PV.01 COVER SHEET
<br />PV.02 ROOF & FIRE PLAN
<br />PV.03 STRUCTURAL DETAILS
<br />PV.04 THREE LINE DIAGRAM
<br />PV.05 ELECTRICAL CALCULATIONS
<br />PV.06 LABELS
<br />PV.07 PLACARD MAP
<br />PS PANEL SCHEDULE
<br />MM MICROINVERTER MAP
<br />SPEC SPECIFICATION SHEETS
<br />AUTHORITIES HAVING JURISDICTION
<br />AHJ: SANTA ANA CITY
<br />UTILITY: SCE
<br />LOT INFORMATION
<br />APN: 198-261-34
<br />LOT AREA: 0.91 ACRES
<br />LIVING AREA: 952 SQFT
<br />DESIGN SPECIFICATIONS
<br />OCCUPANCY: R-3.1
<br />CONSTRUCTION: V-B
<br />ZONING: RESIDENTIAL
<br />SNOW LOAD: 0
<br />WIND EXPOSURE: C
<br />WIND SPEED: 95 MPH
<br />ROOF SURFACE: 2331
<br />PV COVERAGE: 1154.95
<br />OF STORIES: ONE
<br />FIRE SPRINKLERS: NO
<br />MODULE: (55) HANWHA QCELLS Q.TRON BLK M-G2+ 425
<br />INVERTER: (55) ENPHASE IQ8A-72-2-US
<br />MOUNT: (91) EVERFLASH ECOMP KIT
<br />RAILING: RACKING-48-X RAILS
<br />MSP UPGRADE: NO
<br />SCOPE OF WORK:
<br />PROJECT INFORMATIONSYSTEM COMPONENTS
<br />ALL WORK SHALL COMPLY WITH APPLICABLE, LOCAL,
<br />MUNICIPAL CODES, AND TO MANUFACTURERS'
<br />LISTINGS AND INSTALLATION INSTRUCTIONS.
<br />ADDITIONAL INSTALLATION NOTES
<br />AERIAL IMAGE
<br />SITE PLAN LEGEND KEY
<br />MAIN ELECTRICAL PANEL
<br />PV & ESS EQUIPMENT
<br />PROPERTY LINE
<br />FENCE
<br />FIRE SETBACKS &
<br />PROPOSED PATHWAYS
<br /> INSTALLATION OF NEW BATTERY BACKUP FOR BUILDING H: (2) FRANKLINWH APOWER (13.6 kWH EACH)
<br />BATTERY:(2) FRANKLINWH APOWER
<br />SEE RESPONSE LETTER FOR DETAILS
<br />SEE PV.02 FOR ADDITIONAL DETAILS
<br />N
<br />DRAWN BY:
<br />PAPER: 11X17 (ANSI B) DATE:
<br />DESIGN LEAD:
<br />DESIGNED BY SOLAR DEPLOYED, LLC.
<br />931 10TH ST #114, MODESTO, CA 95354
<br />209-671-2001 | HELLO@SOLARDEPLOYED.COM
<br />SIGNATURE:
<br />CHECKED BY:
<br />6/27/2024
<br />T.M.
<br />E.V. A.B.
<br />SHEET NAME:
<br />NEW PV SYSTEM
<br /> 23.375 kW DC (STC-DC) | 21.287 kW (CEC-AC)
<br />SARAH HAMMARSTROM
<br />403 N SUSAN ST,
<br />SANTA ANA, CA 92703
<br />APN: 198-261-34
<br />SHEET NO.:
<br />ENGINEER OF RECORD(N) PV EQUIPMENT (E) MAIN SERVICE PANEL
<br />FIRE ACCESS PATHWAY
<br />(DRIVEWAY / STREET)
<br />PROPERTY LINE
<br />40
<br />3
<br />
<br />N
<br />
<br />S
<br />U
<br />S
<br />A
<br />N
<br />
<br />S
<br />T
<br />COVER SHEET PV.01
<br />(N) PV SYSTEM FOR HAMMARSTROM RESIDENCE | 403 N SUSAN ST, SANTA ANA, CA 92703
<br />SYSTEM SIZE: 23.375 kW DC (STC-DC) | 21.287 kW (CEC-AC) | 19.195 kW AC (INVERTER)
<br />(N) ESS EQUIPMENT
<br />DRIVEWAY
<br />BLDG. EBLDG. DBLDG. C
<br />BLDG. B
<br />BLDG. GBLDG. H
<br />BLDG. A
<br />BLDG. F
<br />DRIVEWAY
<br />(N) PV & ESS EQUIPMENT
<br />A AHJ CORRECTIONS06.28.24
<br />A
<br />FIRE ACCESS PATHWAY
<br />(DRIVEWAY / STREET)
<br />B AHJ CORRECTIONS08.15.24
<br />B
<br /> INSTALLATION OF NEW PV SYSTEM FOR BUILDING H: 11.475 kW DC (STC-DC) | 10.450 kW (CEC-AC) | 9.423 kW AC (INVERTER)
<br /> INSTALLATION OF NEW PV SYSTEM FOR BUILDING G: 11.900 kW DC (STC-DC) | 10.837 kW (CEC-AC) | 9.772 kW AC (INVERTER)
<br />B
<br />Bldg#'s: 101119906
<br /> 101121231
<br />Elec #'s: 20183291
<br /> 20184283
<br />
<br />Approvals:
<br />Plng: M Kilroy
<br />Bldg: J Lo
<br />Elec: M Smith
<br />403 N Susan St #G
<br />& H10/21/2024
|