Laserfiche WebLink
McPherson Engineering By: J.R.  <br />Date: 5/28/24 <br />Gravity Loads: <br />Main Structure DEMAND DECREASED BY 20.38% = OK! <br />Detached Structure DEMAND DECREASED BY 13.01% = OK! <br />Lateral Loads: <br />Main Structure DEMAND INCREASED BY 3.3% < 10% = OK! <br />Detached Structure DEMAND INCREASED BY 4.21% < 10% = OK! <br />Anchorage: <br />DEMAND OF 455.7LB. < CAPACITY OF 656.LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURES ARE ADEQUATE FOR THE PROPOSED PV ARRAY <br />Summary <br />5/28/2024  10:57 AM <br />9 of 9 <br />©McPherson Engineering <br />403 N Susan St #G <br />& H10/21/2024