My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4011 W Carriage Dr - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Carriage Dr
>
4011 W Carriage Dr
>
4011 W Carriage Dr - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 3:01:33 PM
Creation date
6/5/2025 7:32:46 AM
Metadata
Fields
Template:
Plan
Permit Number
101119091
Full Address
4011 W Carriage Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OVERTURNING ANALYSIS Configuration1 4ft Wide Bay <br />Per RMI Sec 2.6.9 and ASCE7-16. Sec 15.5.3.6. Weight of rack with all levels loaded to 67% capacity, & with only top level loaded <br />FULLY LOADED <br />Wpl = 13,500 lbs Wdl = 300 lbs <br />Wpl <br /> . 67% = 13,500 . 0.67 = 9,045 lbs <br />VTrans = (1 . 0.265 . 1 . ((0.67 . 9,045) + 300)) = 1,685 lbs <br />Movt = VTrans <br /> . Ht = 1,685 . 168 = 283,080 in-lbs <br />Mst = ((Wpl <br /> . 0.67) + Wdl) . d . Factor <br />= ((13,500 . 0.67) + 300) . 42 . 0.5 = 196,245 in-lbs <br />Puplift = 1 . (Movt - Mst)/d = (283,080 - 196,245) / 42 = 2,067 lbs <br />PMaxDown = 1 . (Movt + Mst) / d = (283,080 + 196,245) / 42 = 11,412 lbs <br />TOP SHELF LOADED <br />Shear = 1,272 lbs <br />Movt = VTop <br /> . Ht = 1,272 . (180 + ((60 - 10) / 2)) = 260,760 in-lbs <br />Mst = (l + Wdl) . d = (4,500 + 300) . (42 . 0.5) = 100,800 in-lbs <br />Puplift = 1 . (Movt - Mst)/d = (260,760 - 100,800) / 42 = 3,808 lbs <br />ANCHORS <br />No. of Anchors (#Anchors): 4 <br />Pull Out Capacity per Anchor (TAnchor): 1,404 lbs <br />Shear Capacity per Anchor: 3,024 lbs <br />COMBINED STRESS <br />Fully Loaded = ((2,067 / 4) / 1,404) + ((1,685 / 8) / 3,024)= 0.438 <br />Top Shelf Loaded = ((3,808 / 4) / 1,404) + ((1,272 / 8) / 3,024)= 0.731 <br />Seismic UpLift <br />Critical (LC#7B)= (3,506 / 4) / 1,404 = 0.624 <br />PROJECT: <br />FOR: <br />ADDRESS: <br />SHEET#: <br />CALCULATED BY: <br />DATE: <br />Power Distribution Inc <br />Aztec_steve peterson <br />4011 W. CARRAIGE D <br />SANTA ANA, CA <br />37 <br />kelvira <br />6/19/2024 <br /> TEL:(909)869-0989 <br /> 1130 E. CYPRESS ST, COVINA, CA 91724 <br />PN:20240103_2 <br />4011 W Carriage Dr <br />9/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.