Laserfiche WebLink
<br /> <br /> <br /> <br />MOUNT MODIFICATION REPORT <br /> <br />November 20, 2024 <br /> <br />Site Name South Coast Plaza II <br />Site Number CLU3416 (CLL03416) <br />Infinigy Job Number 4106-A0004-B <br />Client Smartlink <br />Carrier AT&T <br />Site Location <br />3925 3/4 S Bristol Street, Unit# WCC01 <br />Santa Ana, CA 92701 <br />Orange County <br />33.6950556° N NAD83 <br />117.8851944° W NAD83 <br />Structure Type Building <br />Structure Height 27.0 ft <br />Mount Type Pipe Mount and Unistrut Mount <br />Mount Elevation 24.5 & 24.0 ft AGL <br />Structural Usage Ratio 48.4% <br />Overall Result Pass <br /> <br />The enclosed structural analysis has been performed in accordance with the 2022 CBC / 2021 IBC based on <br />an ultimate 3-second gust wind speed of 95 mph. The evaluation criteria and applicable standards are <br />presented in the next section of this report. <br /> <br /> <br /> <br />structural@infinigy.com <br />Exp. 6/30/26 <br />11/20/24 <br />3925 3%4 S Bristol St <br />Unit# WCC015/8/2025