Laserfiche WebLink
Mount Modification Report <br />November 20, 2024 <br />Page | 4 <br />5. RESULTS <br />Components Capacity Pass/Fail <br />Mount Pipe 8.9% Pass <br />Mount Standoff 12.8% Pass <br />Mount Brace 1.3% Pass <br />Wall Angle 5.4% Pass <br />Connections 48.4% Pass <br />RATING = 48.4% Pass <br />Notes: <br />1. See additional documentation in Appendix for calculations supporting the capacity consumed and detailed mount <br />connection calculations. <br />2. Results table usages reflect worst case sector mount. <br /> <br />6. RECOMMENDATIONS <br /> <br />Infinigy recommends installing AT&T’s proposed equipment loading configuration on the Pipe Mount and <br />Unistrut Mount at 24.5 & 24.0 ft once the proposed modifications have been installed. The installation shall <br />be performed in accordance with the construction documents issued for this site. <br /> <br />If you have any questions, require additional information, or believe the actual conditions differ from those <br />detailed in this report, please contact us immediately. <br /> <br /> <br /> <br />Christopher H. Lee, MS, PE <br />Engineering Manager | INFINIGY <br /> <br />3925 3%4 S Bristol St <br />Unit# WCC015/8/2025