Laserfiche WebLink
2401027 <br />AJK <br />SN <br />I <br />P <br />S <br /> <br />C <br />U <br />L <br />T <br />I <br />V <br />A <br />T <br />I <br />O <br />N <br />, <br /> <br />3 <br />2 <br />0 <br />1 <br />HA <br />L <br />L <br />A <br />D <br />A <br />Y <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />92 <br />7 <br />0 <br />5 <br />SN <br />I <br />P <br />S <br /> <br />C <br />U <br />L <br />T <br />I <br />V <br />A <br />T <br />I <br />O <br />N <br /> <br />L <br />L <br />C <br />, <br />32 <br />0 <br />1 <br /> <br />S <br /> <br />H <br />A <br />L <br />L <br />A <br />D <br />A <br />Y <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br />AN <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />03-19-2024 <br />-- <br />- <br />- <br />-- <br />- <br />- <br />-- <br />- <br />- <br />PROFESSIONAL SEAL <br />Dr. Al Gonzalez P.E. <br />DOTec Engineering <br />424 Jefferson Street <br />St. Charles, MO 63301 <br />Ph 636-724-9872 <br />Fx 636-724-9032 <br />WWW.DOTECENGINEERING.COM <br />ALG@DOTECENGINEERING.COM <br />SHEET NUMBER: <br />M0.0 <br />PROJECT NUMBER: <br />DRAWN BY: <br />CHECKED BY: <br />FOR CONSTRUCTION <br />ALG <br />PR <br />O <br />J <br />E <br />C <br />T <br />: <br />CL <br />I <br />E <br />N <br />T <br />: <br />DATE: <br />SHEET NAME: <br />MECHANICAL NOTES <br />THIS DRAWING IS PRELIMINARY <br />UNTIL SIGNED AND SEALED BY <br />THE LICENSED PROFESSIONAL <br />NOTED BELOW. <br />THE PROFESSIONAL ENGINEER WAIVES ANY AND ALL RESPONSIBILITY <br />AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO <br />FOLLOW THESE PLANS, SPECIFICATIONS AND DESIGN INTENT THEY <br />CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHER'S FAILURE <br />TO OBTAIN AND OR/ FOLLOW THE PROFESSIONAL ENGINEER <br />GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, <br />INCONSISTENCIES, AMBIGUITIES, OR CONFLICTS WHICH ARE <br />ALLEGED. BUILDINGS TO BE CONSTRUCTED IN FULL CONFORMANCE <br />WITH ALL APPLICABLE CODES AND RESTRICTIONS. PROFESSIONAL <br />ENGINEER TO BE NOTIFIED PRIOR TO CONSTRUCTION IN THE EVENT <br />OF CODE REVISION OR CHANGES. <br /># <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />D <br />A <br />T <br />E <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />GENERAL <br />1.MECHANICAL SYSTEMS SHALL BE INSTALLED IN <br />ACCORDANCE WITH ALL APPLICABLE BUILDING CODES. <br />2.DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC, <br />SHOWING THE GENERAL LOCATION, TYPE, LAYOUT AND <br />EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE <br />SCALED FOR EXACT MEASUREMENTS. REFER TO <br />MANUFACTURERS STANDARD INSTALLATION DRAWINGS <br />FOR EQUIPMENT CONNECTIONS AND INSTALLATION <br />REQUIREMENTS AS REQUIRED. FURNISH AND INSTALL <br />DUCTWORK, CONNECTIONS, ACCESSORIES, OFFSETS AND <br />MATERIALS NECESSARY TO FACILITATE THE SYSTEMS <br />FUNCTIONING AS INDICATED BY THE DESIGN AND THE <br />EQUIPMENT INDICATED. THE WORK SHALL BE IN <br />ACCORDANCE WITH LOCAL CODES AND ORDINANCES AND <br />SUBJECT TO INSPECTION. <br />3.THE MECHANICAL SYSTEMS SHALL BE COMPLETE WITH <br />ALL NECESSARY APPURTENANCES FOR A COMPLETE <br />OPERATING SYSTEM. <br />4.THE CONTRACTOR SHALL WARRANTEE ALL MATERIALS <br />AND GUARANTEE ALL WORKMANSHIP FOR ONE YEAR <br />FROM SUBSTANTIAL COMPLETION. <br />BASIC MATERIALS AND METHODS <br />1.MATERIALS SHALL BEAR UNDERWRITERS LABEL WHERE <br />SUCH STANDARDS HAVE BEEN ESTABLISHED AND LISTED <br />BY UNDERWRITER'S LABORATORIES, INC. MATERIALS, <br />EQUIPMENT AND APPLIANCES SHALL CONFORM TO THE <br />LATEST STANDARDS OF: <br />AMCA - AIR MOVING AND CONDITIONING ASSOCIATIONS, <br />INC. <br />SMACNA - SHEET METAL AND AIR CONDITIONING <br />CONTRACTOR NATIONAL ASSOCIATION, INC. <br />ASHRAE - AMERICAN SOCIETY OF HEATING, <br />REFRIGERATION AND AIR CONDITIONING ENGINEERS <br />ASME - AMERICAN SOCIETY OF MECHANICAL ENGINEERS <br />ASTM - AMERICAN SOCIETY FOR TESTING MATERIALS <br />NEMA - NATIONAL ELECTRICAL MANUFACTURER'S <br />ASSOCIATION <br />ARI - AIR CONDITIONING AND REFRIGERATION INSTITUTE <br />ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE <br />COORDINATION <br />1.COORDINATE WITH GENERAL CONTRACTOR FOR <br />ALLOWABLE DAYS OF THE WEEK AND TIMES OF DAY FOR <br />SYSTEMS SHUT DOWNS AS REQUIRED FOR THE <br />CONSTRUCTION WORK. <br />2.THE MECHANICAL CONTRACTOR SHALL COORDINATE <br />DUCTWORK INSTALLATION WITH ARCHITECTS, OWNERS <br />REPRESENTATIVE IN FIELD AND OTHER TRADES. <br />3.THE MECHANICAL CONTRACTOR SHALL COORDINATE <br />VOLTAGE OF ALL EQUIPMENT WITH ELECTRICAL PRIOR TO <br />ORDERING EQUIPMENT. <br />INSTALLATION <br />1.CORE-DRILL OR SAW-CUT FLOOR, WALL, ROOF, ETC. AS <br />REQUIRED FOR PIPING OR DUCTWORK AND FIRE-STOP <br />OPENING AROUND PIPE OR DUCTWORK. VERIFY LOCATION <br />OF STRUCTURAL BEAMS, JOISTS, ETC. BEFORE DRILLING <br />OR CUTTING. NOTIFY ARCHITECT OF ANY DISCREPANCIES. <br />2.WHEREVER FOUNDATION WALLS, OUTSIDE WALLS, ROOFS, <br />ETC. ARE CUT FOR INSTALLATION OF SYSTEMS, THEY <br />SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION <br />AND SEALED WEATHER-TIGHT. WORK SHALL BE <br />PERFORMED BY CRAFTSMEN SKILLED IN THEIR <br />RESPECTIVE TRADES. <br />3.ALL DUCTWORK AND PIPING SHALL BE ROUTED ABOVE <br />THE SUSPENDED CEILING SPACE, UNLESS OTHERWISE <br />NOTED ON PLANS. <br />4.ALL DUCTWORK AND PIPING THAT IS EXPOSED TO VIEW <br />SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO <br />THE UNDERSIDE OF THE STRUCTURAL STEEL ABOVE. <br />5.ALL ROOF PENETRATIONS EXCEEDING 12" X 12" IN SIZE <br />SHALL BE FURNISHED WITH BURGLAR BARS. <br />6.ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10'-0" <br />AWAY FROM EXHAUST DISCHARGE OPENINGS AND <br />PLUMBING VENT STACKS OR AS REQUIRED BY LOCAL <br />CODES. <br />7.NO FLEXIBLE DUCTWORK SHALL BE USED WITH THE <br />EXCEPTION OF DETAIL ON SHEET M4. MAXIMUM FLEXIBLE <br />DUCT LENGTH OF 5 FEET. <br />INSULATION <br />1.ALL SUPPLY, RETURN AND OUTSIDE AIR <br />RECTANGULAR/ROUND DUCTWORK SHALL BE INSULATED <br />WITH DUCT WRAP INSULATION <br />EQUIPMENT <br />1.THE MECHANICAL CONTRACTOR SHALL INSTALL <br />MECHANICAL SYSTEMS AS SHOWN, NOTED AND <br />SPECIFIED. EQUIPMENT MAY NOT BE SUBSTITUTED <br />UNLESS WRITTEN APPROVAL BY THE ARCHITECT, <br />ENGINEER OR OWNER'S REPRESENTATIVE IS OBTAINED. <br />ANY CHANGES TO THE DUCTWORK LAYOUT WILL <br />NECESSITATE SUBMISSION OF SHEET METAL SHOP <br />DRAWINGS FOR ENGINEER'S REVIEW. ANY UNAUTHORIZED <br />CHANGES WILL BE REMOVED AT CONTRACTOR'S <br />EXPENSE, IF DEEMED NECESSARY BY ARCHITECT, <br />ENGINEER, OR OWNER'S REPRESENTATIVE. <br />2.UPON SELECTION OF THE MECHANICAL APPLIANCES, <br />SUBMIT THE MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS TO THE BUILDING DEPARTMENT, <br />INCLUDING LISTING FOR OUTSIDE INSTALLATION WHERE <br />APPLICABLE. <br />AIR DISTRIBUTION <br />1.ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED <br />IRON SHEET METAL AND FABRICATED ACCORDING TO THE <br />SMACNA LOW VELOCITY DUCT MANUAL, ASHRAE <br />HANDBOOK VOLUME "HVAC SYSTEMS AND EQUIPMENT", <br />AND TYPICAL DUCTWORK DETAILS SHOWN IN THESE <br />DRAWINGS. ALL ELBOWS SHALL HAVE PROPER RADIUS, <br />OR MECHANICAL CONTRACTOR SHALL PROVIDE DOUBLE <br />THICKNESS AIRFOIL TURNING VANES REQUIRED BY <br />SMACNA. NO SQUARE THROAT ELBOWS SHALL BE <br />INSTALLED WITHOUT DOUBLE THICKNESS TURNING <br />VANES. SIZES SHOWN ON PLAN ARE INSIDE FREE AREA. <br />2.ALL FLEXIBLE DUCTWORK SHALL BE FACTORY <br />ASSEMBLED CLASS 1 AIR DUCT (UL 181) WITH FIBERGLASS <br />INSULATION AND REINFORCED OUTER PROTECTIVE <br />COVER/VAPOR BARRIER. FLEX DUCT SHALL MEET NFPA <br />90A WITH FLAME SPREAD UNDER 25, SMOKE DEVELOPED <br />UNDER 50, AND SHALL BE RATED FOR 2" W.C. PRESSURE <br />AND 0 TO 250 DEGREE TEMPERATURE. MAXIMUM <br />STRETCHED OUT LENGTH SHALL BE AS PER CODES. <br />3.PROVIDE UL APPROVED FIRE DAMPERS FOR ALL <br />PENETRATIONS THROUGH FIRE RATED WALLS, <br />PARTITIONS, CEILINGS, AND FLOORS. INSTALL FIRE <br />DAMPERS AS PER MANUFACTURER'S DIRECTIONS AND <br />PER UL GUIDELINES. PROVIDE ACCESS DOORS IN <br />DUCTWORK AND ACCESS PANELS IN BUILDING <br />CONSTRUCTION AS REQUIRED FOR SERVICING OF FIRE <br />DAMPERS. <br />4.ALL DUCT CONNECTIONS TO EQUIPMENT SHALL BE MADE <br />WITH NEOPRENE, DOUBLE COATED, HEAVY GLASS FABRIC, <br />VIBRATION ELIMINATION CONNECTIONS, (F.C.) FLEXIBLE <br />CONNECTIONS, EQUAL TO VENTFABRICS, INC. TYPE <br />VENTGLAS, UNLESS NOTED OTHERWISE. <br />5.ALL DUCTWORK AND PLENUMS WITH PRESSURE CLASS <br />RATINGS SHALL BE CONSTRUCTED TO SEAL CLASS A. <br />JOINTS AND SEAMS OF DUCT SYSTEMS AND THEIR <br />COMPONENTS SHALL NOT BE SEALED WITH CLOTH-BACK <br />RUBBER ADHESIVE DUCT TAPES UNLESS SUCH TAPE IS <br />USED IN COMBINATION WITH MASTIC AND DRAWBANDS. <br />6.THE DUCT SYSTEM SHALL MEET THE DUCT LEAKAGE <br />TESTING REQUIREMENTS OF CMC SECTION 603.9.2 <br />7.ALL BRANCH SUPPLY DUCTS SHALL HAVE (VD) MANUAL <br />VOLUME DAMPERS INSTALLED FOR BALANCING. <br />8.PROVIDE A VOLUME DAMPER FOR EVERY INLET AND <br />OUTLET (DIFFUSERS, REGISTERS, GRILLES, ETC.) OF THE <br />DUCTWORK DISTRIBUTION SYSTEMS WHETHER SHOWN <br />OR NOT ON THE PLANS. PROVIDE ADDITIONAL VOLUME <br />DAMPERS OR EXTRACTORS AT BRANCH TAKE-OFFS FROM <br />DUCTWORK MAINS AS REQUIRED TO ACHIEVE AIR VOLUME <br />DISTRIBUTION AND BALANCING. <br />9.ALL DUCTWORK TRANSITIONS SHALL BE (FOT) "FLAT ON <br />TOP", UNLESS OTHERWISE SPECIFIED ON PLAN. <br />10.ALL CONTRACTOR FABRICATED AND MANUFACTURER <br />FABRICATED COMPONENTS OF THE OUTSIDE AIR, SUPPLY <br />AIR, RETURN AIR AND EXHAUST SYSTEMS SHALL BE <br />CONSTRUCTED AND INSTALLED AIR-TIGHT. THE INSTALLED <br />SYSTEMS SHALL BE PRESSURE TESTED AS SPECIFIED. <br />PIPE OPENINGS IN SYSTEM COMPONENTS SHALL HAVE <br />SHEET METAL BAFFLES, SET IN SEALANT, TO PREVENT <br />LEAKAGE. <br />AUTOMATIC TEMPERATURE CONTROLS <br />1.CONTRACTOR SHALL FURNISH AND INSTALL ALL CONTROL <br />WIRING AS REQUIRED. THERMOSTATS SHALL BE AS <br />SPECIFIED OR AS FURNISHED WITH THE EQUIPMENT. <br />PROVIDE TRANSFORMERS AS REQUIRED. <br />SMOKE DETECTORS <br />1.PROVIDE RETURN AIR SMOKE DETECTORS IN ALL AIR <br />DISTRIBUTION SYSTEMS WITH A DESIGN CAPACITY <br />GREATER THAN 2000 CFM. SMOKE DETECTOR SHALL BE <br />INSTALLED UPSTREAM OF ANY FILTERS, EXHAUST AIR <br />CONNECTIONS, OR OUTSIDE AIR CONNECTIONS. <br />TESTING AND BALANCING <br />1.BALANCING CONTRACTOR SHALL BALANCE SYSTEMS TO <br />AIR QUANTITIES SHOWN ON PLAN. BALANCING <br />CONTRACTOR SHALL USE DUCT MOUNTED MANUAL <br />DAMPERS FOR AIR SYSTEM BALANCING. USE OF A <br />TERMINAL DAMPER IS NOT ACCEPTABLE. <br />2.TESTING AND BALANCING CONTRACTOR SHALL TEST ALL <br />HVAC EQUIPMENT TO ENSURE PROPER OPERATION, TEST <br />ALL CONTROLS TO ENSURE PROPER OPERATION, <br />CALIBRATION AND ADJUSTMENT OF CONTROLS, AND TEST <br />ECONOMIZERS TO ENSURE PROPER OPERATION. <br />3.THE ARCHITECT AND/OR OWNER'S REPRESENTATIVE <br />SHALL BE NOTIFIED 48 HOURS OR MORE PRIOR TO FINAL <br />TESTING AND BALANCING WORK SO THAT THEY AND/OR <br />THE ENGINEER MAY BE PRESENT TO OBSERVE THIS <br />WORK. THE BALANCING CONTRACTOR SHALL SUBMIT <br />WRITTEN REPORTS OF ALL AIR READINGS, STATIC <br />PRESSURES, GPM RATES, PRESSURE READINGS, <br />TEMPERATURE READINGS, MOTOR AMPERAGE, ETC., TO <br />DOCUMENT PROPERLY OPERATING AND BALANCED <br />MECHANICAL SYSTEMS IN ALL AREAS. A COPY OF THE <br />TEST AND BALANCE REPORT SHALL BE SUBMITTED TO THE <br />AUTHORITIES HAVING JURISDICTION PRIOR TO FINAL <br />INSPECTION AND REQUESTING OCCUPANCY. <br />CLOSEOUT DOCUMENTATION <br />1.THE CONTRACTOR SHALL FURNISH TO THE BUILDING <br />OWNER WITHIN 90 DAYS OF DATE OF RECEIPT OF THE <br />CERTIFICATE OF OCCUPANCY THE FOLLOWING: <br />A. OPERATING AND MAINTENANCE MANUAL. MANUAL <br />SHALL CONSIST OF MANUFACTURER'S <br />RECOMMENDATIONS, PROGRAMMING PROCEDURES <br />AND DATA POINTS, NARRATIVE AND OTHER MEANS OF <br />ILLUSTRATING TO THE OWNER HOW THE BUILDING, <br />EQUIPMENT AND SYSTEMS ARE INTENDED TO BE <br />INSTALLED, MAINTAINED AND OPERATED. <br />B. AS-BUILT HVAC DRAWINGS. <br />C. BALANCE REPORT OF HVAC SYSTEMS. <br />MECHANICAL ABBREVIATIONS <br />AFF ABOVE FINISHED FLOOR <br />BLD'G BUILDING <br />COL COLUMN <br />DEG F DEGREES FAHRENHEIT <br />DWG DRAWING <br />EA EXHAUST AIR <br />ETR EXISTING TO REMAIN <br />FC FLEXIBLE CONNECTION <br />FD FIRE DAMPER <br />GC GENERAL CONTRACTOR <br />MA MAKE-UP AIR <br />MOD MOTOR OPERATED DAMPER <br />MT'D MOUNTED <br />MVD MANUAL VOLUME DAMPER <br />NC NEW CONNECTION TO EXISTING <br />NTS NOT TO SCALE <br />OA OUTSIDE AIR <br />OC ON CENTER <br />RA RETURN AIR <br />REF REFER OR REFERENCE <br />REQ'D REQUIRED <br />SA SUPPLY AIR <br />TA TRANSFER AIR <br />UCD UNDER CUT DOOR <br />UNO UNLESS NOTED OTHERWISE <br />W/ WITH <br />Ø DIAMETER/ROUND <br />SCOPE OF THE WORK <br />MECHANICAL PLANS TO BE GENERATED FROM <br />MECHANICAL DRAWINGS AND INFORMATION PROVIDED BY <br />AES & CLIENTS REQUIREMENTS ALONG WITH SPECS OF <br />EQUIPMENT. <br />INCORPORATE THE INFORMATION REQUESTED ABOVE INTO <br />MECHANICAL DRAWINGS AND PROVIDE SEALED DRAWINGS <br />AND CALCULATIONS FOR PERMITTING. <br />THE CONTRACTORS ARE REQUIRED TO VISIT THE SITE AND <br />FULLY AQUAINT THEMSELVES WITH THE EXISTING CONDITIONS <br />AND THE DIFFICULTIES INVOLVED IN ACCOMPLISHING THE NEW <br />WORK. PROBLEMS, DISCREPANCIES OR INFORMATION NEEDED <br />SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER IN <br />WRITING PRIOR TO SUBMITTING A PROPOSAL. THE SUBMISSION <br />OF PROPOSAL WILL INDICATE THAT THE CONTRACTOR HAS <br />FULLY UNDERSTOOD AND HAS INCLUDED ALL COSTS FOR THIS <br />PROJECT. <br />MECHANICAL SYMBOLS <br />MANUAL VOLUME DAMPER (MVD) <br />T THERMOSTATIC CONTROL DEVICE <br />SUPPLY AIR DIFFUSERS <br />RETURN AND TRANSFER AIR GRILLES <br />MODULE SIZE <br />TAG NO. <br />EXHAUST AIR GRILLE <br />NECK SIZE <br />TAG NO. <br />CFM <br />NECK SIZE <br />TAG NO. <br />CFM <br />C CARBON DIOXIDE DETECTOR (SYSTEM BY OTHERS) <br />09/30/2026 <br />01/20/2025 <br />3201 S Halladay St <br />5/5/2025