My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 S Halladay St - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Halladay St
>
3201 S Halladay St
>
3201 S Halladay St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:33:09 AM
Creation date
6/5/2025 7:32:47 AM
Metadata
Fields
Template:
Plan
Permit Number
20183890
30147713
40139478
101120672
101120687
Full Address
3201 S Halladay St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Planning & Building Agency Building and Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714)-647-5800 www.santa-ana.org <br />COMMERCIAL CANNABIS BUSINESS SUBMITTAL CHECKLIST <br /> <br />PCC-18 <br /> <br />REV: 09/02/2021 Page 1 of 1 <br /> <br />THIS FORM SHALL BE COMPLETED BY A CALIFORNIA REGISTERED ARCHITECT OR CIVIL ENGINEER. <br />Instructions: In order to submit for plan check for Commercial Cannabis Business (CCB) projects, the architect or civil engineer shall complete all sections, check all boxes and sign the certification section below. This checklist shall be completed prior to the time of plan submittal. Unless all answers are checked Yes, plans will not be accepted. <br />Project Address: <br /> Yes No <br />1. ☐ ☐ All CCB plans shall be stamped and signed by a California registered architect or civil engineer. <br />2. ☐ ☐ Provide Architectural, Structural, Mechanical, Electrical, and Plumbing (MEP) plans at time of submittal. Deferred submittal is not acceptable for MEP. <br />3. ☐ ☐ Provide 4 separate submittal packages: 1) Architectural and Structural 2) Mechanical 3) Electrical 4) Plumbing (MEP). <br />4. ☐ ☐ Provide 3 sets of Architectural and Structural plans and 2 sets of MEP plans. <br />5. ☐ ☐ Provide site plan, existing floor plan, proposed floor plan, egress plan. Provide equipment plan and structural plan if applicable. <br />6. ☐ ☐ Note on plan a list of all hazardous materials and quantities. If there are no hazardous materials, note on plan that there are no hazardous materials to be stored on site. <br />7. ☐ ☐ Plans are required to be submitted separately to Orange County Fire Authority (OCFA) for review prior to plan submittal. Indicate Service Route number: SR #:___________ <br />8. ☐ ☐ On the plan, describe in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finished products. <br /> I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name: Signature: <br />Architect/Engineer License Number: Date: <br />Phone Number: Email Address: <br />Refugio Manuel Rochin <br />C 74455 <br />24000482 <br />(314) 941-6618 <br />refugior@dotecengineering.com <br />06/30/2024 <br />3201 S Halladay Santa Ana, CA 92705 <br />3201 S Halladay St <br />5/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.