My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2406 W Mark St Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Mark St
>
2406 W Mark St Unit# 2
>
2406 W Mark St Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:33:04 AM
Creation date
6/5/2025 7:32:53 AM
Metadata
Fields
Template:
Plan
Permit Number
20183874
101120674
Full Address
2406 W Mark St Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INSTALL A 2.40 KW PV ARRAY THAT INCLUDES 6 ROOF MOUNTED SOLAR PANELS. <br />MODULE MODEL : SILFAB SOLAR SIL-400 HC+ MODULES <br />MODULE MAX POWER (P/MAX): 400W <br />INVERTER MODEL : ENPHASE IQ8PLUS-72-2-US [SI1] 240V <br />INVERTER QTY : [6] <br />ROOF AREA : 980 SQ. FT. <br />ROOF PITCH : 20° <br />PV ARRAY PITCH : 20° <br />PV ARRAY AREA : 128.06 SQ. FT. <br /> AZIMUTH: (6) MODULES @ 180 ° <br />ROOF TYPE: ASPHALT SHINGLE <br />ROOF LAYER(S): 01 <br />RAFTERS: 2x6 [16"] ON CENTER <br />ELECTRIC UTILITY COMPANY: SCE <br />MAIN SERVICE AMPERAGE: 100A <br />2.40kW DC SOLAR ELECTRIC SYSTEM <br />AC :1.74kW <br />ONE STORY HOUSE <br />T1-TITLE PLAN, GENERAL NOTES PV SYSTEM SUMMARY <br />A1-SITE PLAN / A1.1-SYSTEM INFORMATION <br />A2-PANEL AND RACKING LAYOUT / A3-GENERAL DETAIL <br />E1-SINGLE LINE DIAGRAM / E2-LABELS AND PLACARD <br />ES-MANUFACTURER SPEC SHEETS <br />VICINITY MAP <br />SCALE: NTS <br />SHEET INDEX <br />SCOPE OF WORK <br />CODE SUMMARY: <br />1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL <br />COMPLY WITH THE FOLLOWING APPLICABLE CODES: <br />2022 CA BUILDING CODE, PART 2 <br />2022 CA RESIDENTIAL CODE PART, 2.5 <br />2022 CA MECHANICAL CODE, PART 4 <br />2022 CA ELECTRICAL CODE, PART 3 <br />2022 CA PLUMBING CODE, PART 5 <br />2022 CA EXISTING BUILDING CODE, PART 10 <br />2022 CA GREEN BUILDING STANDARDS CODE, PART 11 <br />2022 CA REFERENCE STANDARDS CODE, PART 12 <br />2022 CA FIRE CODE <br />2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS <br />SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. <br />3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING <br />LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S <br />INSTRUCTIONS. [NEC 690.4(D)] <br />4. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION <br />BOXES AND SWITCHES. <br />5. PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. <br />6. CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM <br />1A. ALL ELECTRICAL WORK SHALL BE DESIGNED PER <br />2022 LOS ANGELES COUNTY ELECTRICAL CODE, 2022 <br />CALIFORNIA ELECTRICAL CODE, AND 2020 NATIONAL <br />ELECTRICAL CODE AND 2022 BUILDING ENERGY <br />EFFICIENCY STANDARDS. <br />2B. 110.2 APPROVAL; ALL ELECTRICAL EQUIPMENT <br />SHALL BE LABELED, LISTED, OR CERTIFIED BY A <br />NATIONALLY RECOGNIZED TESTING LABORATORY <br />ACCREDITED BY THE UNITED STATES OCCUPATIONAL <br />SAFETY HEALTH ADMINISTRATION. <br />AERIAL MAP <br />SCALE: NTS <br />HO <br />M <br />E <br />O <br />W <br />N <br />E <br />R <br />: <br />P <br />A <br />U <br />L <br /> <br />D <br />I <br />NH <br />AD <br />D <br />R <br />E <br />S <br />S <br />: <br /> <br />LI <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />: <br /> <br />T <br />o <br />a <br />n <br /> <br />D <br />a <br />o <br />B- <br />1 <br />0 <br />9 <br />1 <br />6 <br />1 <br />7 <br /> <br />24 <br />0 <br />6 <br /> <br />W <br />E <br />S <br />T <br /> <br />M <br />A <br />R <br />K <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />2 <br />SI <br />G <br />N <br />A <br />T <br />U <br />R <br />E <br />: <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br /> <br />S <br />I <br />T <br />E <br /> <br />P <br />L <br />A <br />N <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br /> <br />JOB#: PVD-6075 <br />REVISIONS <br />DATE REV. <br />SOLAR PERMIT PACKAGE <br />DATE: 7/10/2023 <br />AP <br />N <br />: <br />1 <br />0 <br />9 <br />- <br />66 <br />4 <br />- <br />3 <br />2 <br />PAPER SIZE: 11"X17" <br />SCALE: NTS <br />T1 <br />The scope of the plans is for the installation of the solar photovoltaic system only <br />and the approval is subject to compliance with all applicable city and state codes <br />and regulations regarding construction. The approval of the plans does not <br />constitute any certification of the accuracy, completeness, or building permit <br />status of the existing buildings and structures as shown. <br />Bldg#: 101120674 <br />Elec#: 20183874 <br /> <br />2406 W Mark St <br />Unit# 29/9/2024
The URL can be used to link to this page
Your browser does not support the video tag.