Laserfiche WebLink
Structural Letter for PV Installation <br /> Date: 5/10/2023 <br /> Job Address: 2406 West Mark Street, Unit 2, Santa Ana, CA 92703 <br /> Job Name: Paul Dinh <br /> Job Number: 1061 <br /> Scope of Work <br /> This letter is for the existing roof framing which supports the new PV modules as well as the <br /> attachment of the PV system to existing <br /> roof framing. All PV mounting equipment shall be designed and installed per manufacturer’s <br /> approved installation specifications. <br /> Table of Contents <br /> Sheet <br /> 1 Cover <br /> 2 Scope of Work <br /> 3 Roof Framing Check <br /> 4 Wind Load And Seismic Load Check <br /> Sincerely, <br /> Jin Byon <br /> Registered Professional Engineer <br /> Irfan Engineering LLC <br /> design@irfanengineering.com <br /> design@irfanengineering.com Irfan Engineering LLC <br />2406 W Mark St <br />Unit# 29/9/2024