=== <br />2#10 AWG <br />THWN-2@3/4" <br />EMT CONDUIT <br />#8 AWG <br />THWN-2 EGC GA <br />T <br />E <br />W <br />A <br />Y <br />JUNCTION <br />BOX <br />6" X 6" X 4" UL <br />LISTED, <br />WATER-TIGHT <br />NEMA TYPE 3 <br />AC NEUTRAL (N) <br />1X20A/2P <br />NEW ENPHASE AC COMBINER <br />BOX WITH IQ+ CONSOLIDATES <br />INTERCONNECTION INTO A <br />SINGLE ENCLOSED STREAMLINE <br />(E) MAIN <br />2#12 AWG LUG <br />PV WIRE <br />@FREE AIR <br />(BRANCH 1) <br />1 STRING OF 6 <br />PV MODULES@SILFAB SOLAR SIL-400 HC+ <br />(N) <br />15A/2P <br />(N) <br />100A/2P <br />"MSB" <br />(N) MAIN SERVICE PANEL <br />100A BUS BAR <br />100AMP MAIN BREAKER TOP FED <br />POINT OF CONNECTION <br />LOAD SIDE <br />705.12(B)(2)(3)(b) <br />Ground Rod <br />GROUNDING <br />ELECTRODE <br />20A/2P <br />(N) <br />30A Utility AC Disconnect , 2 Pole,PV BREAKER <br />Knife-Blade Type, 240V, Lockable, <br />Visible, Rated NEMA 3R <br />"THWN-2"-3-#10 <br />#8,EGC CU <br />"THWN-2"-3-#10 <br />#8,EGC CU <br />PV BREAKER WILL BE INSTALLED <br />ON THE OPPOSITE SIDE OF THE BUS <br />BAR AWAY FROM THE MAIN BREAKER. <br />WIRE TYPE-QTY-SIZE CONDUIT <br />- <br />ABOVE ROOF <br />MIN.7/8" <br />WIRE <br />AMP. <br />30A <br />TEMP. <br />CORRECTION <br />CURRENT <br />0.96 28.8A > 10.9A <br />GRD-SIZE <br />#6,BARE CU <br />"THWN-2"-2-#10 #8,EGC CU 40A <br />TERMINAL <br />RATING <br />90°C <br />90°C 0.96 38.4A >20A <br />AMP.ADJ <br />C.C.C <br />N/A <br />HI TEMP. = 31°C LOW TEMP. = 2°C <br />(1*L1,1*L2) <br />"Q CABLE "-2#12 <br /> (L1,L2) <br />"THWN-2"-3-#10 #8,EGC CU 35A 75°C N/A 32.9A > 20A(L1, L2, N) <br />EMT.3/4"0.94 <br />EMT.3/4"MIN.7/8"N/A <br />MODULE MFR: SILFAB SOLAR <br />MODEL: SIL-400 HC+ <br />VOC = 43.02V <br />VMP = 36.05V <br />ISC = 11.58A <br />IMP = 11.1A <br />MAX DC OUTPUT = 400W * 6 = 2.40kW <br />374W PTC * 6 = 2.24kW <br />2.20* 0.97 INV.= 2.188kW <br />INVERTER MODEL&MFR: <br />ENPHASE IQ8PLUS-72-2-US [SI1] 240V <br />AC MAX OUTPUT POWER @ 240V = 290 VA AC <br />NOMINAL OUTPUT CURRENT@240V = 1.21A <br />STRING = 1.21A * 1.25 * 6[e] = 9.07A <br />MIN (OCPD) = 20A, TERMINALS RATED @ 75°C <br />PV SYSTEM OUTPUT <br />INVERTER <br />MODULE @ STC <br />ALL ELECTRICAL INSTALLATIONS MUST BE <br />CARRIED OUT IN ACCORDANCE WITH THE <br />LOCALLY APPLICABLE ELECTRICAL <br />STANDARDS AND THE NATIONAL <br />ELECTRICAL CODE <br />PV COMBINER BOX RATING <br />NEW COMBINER BOX, SPLIT PHASE 3W 120/240V <br />IQ Combiner 5/5C <br />MAX PV OUTPUT CURRENT = <br />INVERTER IMAX * # OF INVERTERS * 125%NEC <br />STRING = 1.21A * 1.25 * 6 [e] = 9.07A <br />MIN (OCPD) = 20A, TERMINALS RATED @ 75°C <br />TERMINALS RATED @ 75°C <br />IN: 1* 20A PV BACKFEED BREAKERS <br />OUT: MAIN LUG CONNECTED TO 20A BREAKER @ <br />MAIN SERVICE PANEL <br />120%RULE@MAIN SERVICE: <br />705.12(B)(2)(3)(b) <br />NEW & UPGRADED BUS BAR RATING = 100A <br />= 1.2 *100A BUS BAR = 120A <br />TOTAL FEED = 100A "MSB" BREAKER + 20A <br />= (120A = 120A)MAX <br />PER CEC TOP FED MAIN BREAKER <br />705.12(B)(2)(3)(b) <br />MSP BUS BAR = 100A <br />100Ax1.2=120A <br />LARGEST OCPD : 120A-100A= 20A <br />ALL METALLIC RACEWAYS AND EQUIPMENT SHALL BE BONDED AND ELECTRICALLY CONTINUOUS(NEC 250.90,250.96) <br />GROUNDING BUSHINGS ARE REQUIRED AROUND PREPUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM(NEC 250.97) <br />THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXPECT FOR SPLICES OR JOINTS AT BUSBAR WITHIN LISTED EQUIPMENT. (NEC250.64) <br />THE EQUIPMENT GROUNDING CONDUCTOR MAY BE USED AS A GROUNDING ELECTRODE CONDUCTOR.(NEC 250.121 EXCEPTION.INSTALLED PER 250.B(A),II,III,VI) <br />HO <br />M <br />E <br />O <br />W <br />N <br />E <br />R <br />: <br />PA <br />U <br />L <br /> <br />D <br />I <br />N <br />H <br />AD <br />D <br />R <br />E <br />S <br />S <br />: <br />LI <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />: <br /> <br />T <br />o <br />a <br />n <br /> <br />D <br />a <br />o <br />B- <br />1 <br />0 <br />9 <br />1 <br />6 <br />1 <br />7 <br />24 <br />0 <br />6 <br /> <br />W <br />E <br />S <br />T <br /> <br />M <br />A <br />R <br />K <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />2 <br />SI <br />G <br />N <br />A <br />T <br />U <br />R <br />E <br />: <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br /> <br />S <br />I <br />T <br />E <br /> <br />P <br />L <br />A <br />N <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br />JOB#: PVD-6075 <br />REVISIONS <br />DATE REV. <br />SOLAR PERMIT PACKAGE <br />DATE: 7/10/2023 <br />AP <br />N <br />: <br />10 <br />9 <br />- <br />6 <br />6 <br />4 <br />- <br />3 <br />2 <br />PAPER SIZE: 11"X17" <br />SCALE: NTS <br />E1 <br />ALONG THE WALL <br />(N) <br />100A/2P <br />"MSB" <br />INCOMING UTILITY <br />SERVICE SCE <br />120/240V <br />1-PH, 3W <br />M <br />NEW 100A SUB PANEL <br />2406 W Mark St <br />Unit# 29/9/2024