ABBREVIATIONS
<br />ABOVE FINISHED FLOOR
<br />PLUMBING SYMBOL LEGEND
<br />AFF
<br />AHJ AUTHORITIES HAVING JURISDICTION
<br />APPROX APPROXIMATE
<br />BLDG BUILDING
<br />CLG CEILING
<br />CONST CONSTRUCTION
<br />CW DOMESTIC COLD WATER
<br />CXA COMMISSIONING AGENT
<br />DEG DEGREES
<br />DN
<br />DTL
<br />EC
<br />DOWN
<br />DETAIL
<br />DWG(S) DRAWING(S)
<br />EA EACH
<br />ELECTRICAL CONTRACTOR
<br />ELEC ELECTRICAL
<br />EMER EMERGENCY
<br />EXIST EXISTING
<br />EXT EXTERIOR
<br />FD
<br />FS
<br />F&I
<br />FLOOR DRAIN
<br />FLOOR SINK
<br />FURNISH & INSTALL
<br />FOIC FURNISHED BY OWNER,
<br />INSTALLED BY CONTRACTOR
<br />FOIO FURNISHED BY OWNER,
<br />INSTALLED BY OWNER
<br />FLR
<br />FT
<br />FLOOR
<br />FOOT/FEET
<br />FCO FLOOR CLEANOUT
<br />GC
<br />HR HOUR
<br />HVAC HEATING, VENTILATION, AND AIR
<br />CONDITIONING
<br />HW HOT WATER
<br />HS HANDSINK
<br />HWS HOT WATER SUPPLY
<br />HWR HOT WATER RETURN
<br />LL
<br />LV
<br />LANDLORD
<br />LOW VOLTAGE
<br />MAX MAXIMUM
<br />MC MECHANICAL CONTRACTOR
<br />MDP MAIN DISTRIBUTION PANEL
<br />MECH MECHANICAL
<br />MEP MECHANICAL, ELECTRICAL, AND PLUMBING
<br />MFG MANUFACTURER
<br />MIN MINIMUM
<br />MS MOP SINK
<br />NL
<br />NTS
<br />PC
<br />PS
<br />NIGHTLIGHT
<br />NOT TO SCALE
<br />PLUMBING CONTRACTOR
<br />PREP SINK
<br />POC POINT OF CONNECTION
<br />REF REFERENCE
<br />REQ’D REQUIRED
<br />REV REVISION
<br />SHT
<br />SF
<br />TEL
<br />SHEET
<br />SQUARE FEET
<br />SPECS SPECIFICATION(S)
<br />SST STAINLESS STEEL
<br />TELEPHONE
<br />TEMP TEMPORARY
<br />TMV
<br />TYPICAL
<br />UC
<br />TEMPERATURE MIXING VALVE
<br />TW TEMPERED HOT WATER
<br />TYP
<br />UNDER COUNTER
<br />UNO UNLESS NOTED OTHERWISE
<br />V VENT
<br />W SANITARY WASTE
<br />WCO WALL CLEANOUT
<br />WH WATER HEATER
<br />WP WEATHER PROOF
<br />APPLICABLE CODES
<br />CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STATE CODES
<br />WHETHER INDICATED HEREIN OR NOT.
<br />2022 CALIFORNIA BUILDING STANDARDS CODE:
<br />• PART 1 - CALIFORNIA ADMINISTRATIVE CODE (CAC)
<br />• PART 2 - CALIFORNIA BUILDING CODE (CBC)
<br />• PART 3 - CALIFORNIA ELECTRICAL CODE (CEC)
<br />• PART 4 - CALIFORNIA MECHANICAL CODE (CMC)
<br />• PART 5 - CALIFORNIA PLUMBING CODE (CPC)
<br />• PART 6 - CALIFORNIA ENERGY CODE (CENC)
<br />• PART 7 - (CURRENTLY VACANT)
<br />• PART 8 - CALIFORNIA HISTORICAL BUILDING CODE (CHBC)
<br />• PART 9 - CALIFORNIA FIRE CODE (CFC)
<br />• PART 10 - CALIFORNIA EXISTING BUILDING CODE (CEBC)
<br />• PART 11 - CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN)
<br />• PART 12 - CALIFORNIA REFERENCE STANDARDS CODE
<br />FS
<br />M WM
<br />POC
<br />FLOOR SINK
<br />WATER METER
<br />CONNECT TO EXISTING
<br />F. ALL DOMESTIC WATER HEATING, RECIRCULATING, FILTER AND
<br />SOFTENING EQUIPMENT SHALL BE TESTED AND/OR ADJUSTED
<br />AND BALANCED BY THE CONTRACTOR'S TESTING, ADJUSTING
<br />AND BALANCE AGENT (SEE TESTING ADJUSTING AND BALANCING)
<br />OR THE MANUFACTURER'S CERTIFIED STARTUP
<br />REPRESENTATIVE AFTER THE SYSTEM IS VERIFIED TO BE
<br />COMPLETE AND CORRECT BY STARBUCKS CXA IN ACCORDANCE
<br />WITH THE REQUIREMENTS OF THESE DOCUMENTS. SEQUENCES
<br />OF OPERATION SHALL BE TESTED TO ENSURE THAT THEY
<br />OPERATE IN ACCORDANCE WITH THE CONTRACT
<br />REQUIREMENTS. DELIVERABLES: PRELIMINARY, WRITTEN
<br />FUNCTIONAL PERFORMANCE REPORT CONFORMING TO THE
<br />REQUIREMENTS SPECIFIED HEREIN, DOCUMENTING THE
<br />INFORMATION SPECIFIED, ETC. TO THE STARBUCKS CXA
<br />IMMEDIATELY UPON COMPLETION OF THE WORK.
<br />G. CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN
<br />EQUIPMENT IS READY FOR FUNCTIONAL PERFORMANCE
<br />TESTING. ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL
<br />PERFORMANCE TESTING PRIOR TO STARTING TESTING.
<br />CONTRACTOR SHALL OPERATE EQUIPMENT FOR STARBUCKS
<br />CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION
<br />OF EQUIPMENT, RESPONSE OF SENSORS, AND PROPER
<br />EXECUTION OF HVAC CONTROL AND LIGHTING SEQUENCES;
<br />INCLUDING BUT NOT LIMITED TO, AIR MOVEMENT, TEMPERATURE,
<br />SOUND, AND CONTROL RESPONSE. PROVIDE ANY SECURITY
<br />ACCESS, HARDWARE, SOFTWARE, OR OTHER SUPPORT AS
<br />NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS
<br />AND DOCUMENT ALL EQUIPMENT TESTING. STARBUCKS CXA
<br />WILL RECORD THE EQUIPMENT OPERATION AND RESPONSE TO
<br />TESTING SEQUENCES AND PREPARE A LIST OF ANY
<br />DEFICIENCIES DISCLOSED BY THE FUNCTIONAL PERFORMANCE
<br />TESTS FOR CORRECTION BY THE CONTRACTOR. EQUIPMENT
<br />INCLUDES, BUT IS NOT LIMITED TO, AIR HANDLING UNITS,
<br />ROOFTOP AND SPLIT TYPE, CONDENSING UNITS, EXHAUST FANS,
<br />LIGHTING CONTROLS, ETC. DELIVERABLES: PROVIDE COMPLETED
<br />COPIES OF ALL START UP REPORTS, FILLED OUT ON THE
<br />MANUFACTURER'S FORMS, TO THE STARBUCKS CXA.
<br />H. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES
<br />OR DEFICIENCIES DISCLOSED DURING THE FUNCTIONAL
<br />PERFORMANCE TESTING PROCESS. CORRECTIONS SHOULD BE
<br />MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE
<br />SYSTEM AND CONSTRUCTION SCHEDULE.
<br />I. CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY RE-
<br />TESTING OF EQUIPMENT DEEMED NECESSARY BY STARBUCKS
<br />CXA DURING INSTALLATION VERIFICATION AND FUNCTIONAL
<br />PERFORMANCE TESTING. CONTRACTOR IS RESPONSIBLE FOR
<br />CORRECTING ANY ISSUES OR DEFICIENCIES FOUND IN THE
<br />SYSTEM DURING ANY AND ALL RE-TESTING. CORRECTIONS
<br />SHOULD BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO
<br />THE SYSTEM AND CONSTRUCTION SCHEDULE. DELIVERABLES:
<br />FINAL BALANCE REPORT, DEFICIENCIES LIST NOTING
<br />CORRECTIVE ACTIONS PERFORMED BY CONTRACTOR IN
<br />RESPONSE TO INSTALLATION VERIFICATION AND FUNCTIONAL
<br />PERFORMANCE TEST RESULTS.
<br />J. CONSTRUCTION AND POST CONSTRUCTION TESTING:
<br />ADDITIONAL TESTING MAY BE REQUIRED BY LEED AND OTHER
<br />PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH
<br />COMMISSIONING SERVICE. CONTRACTOR SHALL CONDUCT,
<br />DOCUMENT, SUPPORT AND SCHEDULE THIS TESTING AS
<br />DIRECTED BY STARBUCKS CXA.
<br />FCO
<br />WCO WALL CLEANOUT
<br />FLOOR CLEANOUT
<br />GENERAL CONTRACTOR
<br />GFCI GROUND FAULT CIRCUIT INTERRUPTER
<br />GW GREASE WASTE
<br />S
<br />SHOCK ABSORBER
<br />STRAINER
<br />HB HOSE BIBB
<br />D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY
<br />STARBUCKS CXA. CONTRACTOR SHALL SUPPORT STARBUCKS
<br />CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY.
<br />PROVIDE ALL ACCESS AND EQUIPMENT NECESSARY FOR
<br />STARBUCKS STAFF TO VERIFY THAT THE EQUIPMENT IS
<br />INSTALLED CORRECTLY.
<br />E. CONTRACTOR SHALL BE READILY AVAILABLE DURING
<br />INSTALLATION VERIFICATION TO CORRECT ANY DEFICIENCIES OR
<br />DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION
<br />PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER
<br />WITHOUT DISRUPTION OF THE CONSTRUCTION SCHEDULE.
<br />CH. V
<br />RV
<br />CHECK VALVE
<br />RELIEF VALVE
<br />BV
<br />GV
<br />BALL VALVE
<br />GATE VALVE
<br />TW
<br />RO
<br />RD
<br />G
<br />RS
<br />TW
<br />RO
<br />G
<br />RD
<br />RS
<br />TEMPERED WATER
<br />REVERSE OSMOSIS WATER
<br />GAS PIPING
<br />REFRIGERANT DISCHARGE PIPING
<br />REFRIGERANT SUCTION PIPING
<br />GW
<br />CD
<br />S OR W
<br />S OR W
<br />V
<br />CD
<br />GW
<br />CW
<br />HW
<br />CWF
<br />CWN
<br />CWS
<br />CWF
<br />CWN
<br />CWS
<br />SANITARY OR WASTE PIPING ABOVE SLAB
<br />SANITARY OR WASTE PIPING BELOW SLAB
<br />CONDENSATE DRAIN
<br />VENT PIPING
<br />HOT WATER PIPING
<br />GREASE WASTE
<br />COLD WATER PIPING
<br />COLD WATER FILTERED
<br />COLD WATER NANO FILTERED
<br />COLD WATER SOFTENED
<br />SYSTEM COMMISSIONING
<br />CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING
<br />CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED,
<br />NEEDED AND REQUIRED TO CONDUCT AND FACILITATE STARBUCKS
<br />STAFF BUILDING COMMISSIONING EFFORTS. THIS WORK WILL BE
<br />COMPRISED OF THREE DISTINCT EFFORTS:
<br />1) SUPPORT STARBUCKS COMMISSIONING AGENT (CXA) DURING
<br />INSTALLATION VERIFICATION AND CORRECT DISCLOSED
<br />DEFICIENCIES;
<br />2) PERFORM TESTING, ADJUSTING, BALANCING AND SYSTEM STARTUP
<br />AND SUPPORT FUNCTIONAL PERFORMANCE TESTING BY STARBUCKS
<br />CXA;
<br />3) CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL PERFORMANCE
<br />TESTING AND SUBMIT REPORTS. CONTRACTOR SHALL PERFORM AND
<br />PROVIDE THE FOLLOWING:
<br />A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE
<br />NOT LIMITED TO, DOMESTIC HOT WATER GENERATION.
<br />B. CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN
<br />PROJECT SCHEDULE AND SHOW INTERVALS FOR PERFORMANCE
<br />OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND
<br />INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA.
<br />CONTRACTOR SHALL SHOW RESOURCES FOR PERFORMING ALL
<br />WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE ITEM
<br />IN THE SCHEDULE OF VALUES.
<br />C. CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH
<br />THE MANUFACTURER’S REQUIREMENTS AND ALL CONTRACT
<br />DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED
<br />TOTALLY COMPLETE, AND ACCESSIBLE TO STARBUCKS CXA FOR
<br />INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE
<br />TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION
<br />VERIFICATION.
<br />VALVES
<br />GENERAL
<br />INSTALL VALVES FOR EACH FIXTURE AND ITEM OF EQUIPMENT. PROVIDE
<br />BRAIDED STAINLESS STEEL HOSE (UNLESS OTHERWISE NOTED) BETWEEN
<br />VALVE AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S
<br />SPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO EQUIPMENT
<br />FOR EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUT
<br />MOVING EQUIPMENT. SHUT OFF VALVES TO BE BALL TYPE. VALVES SHALL
<br />BE LISTED/APPROVED FOR USE PER AUTHORITIES HAVING JURISDICTION
<br />(AHJ) AND CODE REQUIREMENTS. PROVIDE VALVE IDENTIFICATION PER
<br />THE PROJECT MANUAL FOR MAIN WATER SERVICE SHUT-OFF AND ANY
<br />OTHER VALVES WHICH ARE NOT CLEARLY EVIDENT WHAT THEY SERVE.
<br />PLUMBING FIXTURES
<br />WATER HEATER
<br />SIZE WATER HEATER PER STARBUCKS STANDARD AND PER AUTHORITIES
<br />HAVING JURISDICTION (AHJ), WHICHEVER IS MORE STRINGENT. PROVIDE
<br />INSTALLATION COMPLETE WITH FITTINGS AS SHOWN IN THE DRAWINGS.
<br />SET HOT WATER TEMPERATURE AT 140° F OR ADJUST AS REQUIRED BY AHJ.
<br />PROVIDE THERMOMETER ON HOT WATER PIPE LEAVING WATER HEATER.
<br />WATER FILTRATION
<br />STARBUCKS WATER FILTRATION VENDOR WILL PROVIDE FILTRATION
<br />SYSTEM. CONTRACTOR SHALL CONFIRM WITH STARBUCKS CONSTRUCTION
<br />MANAGER WHETHER VENDOR OR PLUMBING CONTRACTOR IS TO INSTALL
<br />FILTRATION SYSTEM. PROVIDE AND COORDINATE INSTALLATION COMPLETE
<br />WITH ALL PIPING, FITTINGS, AND EQUIPMENT AS INDICATED ON THE
<br />DRAWINGS.
<br />CONNECTIONS
<br />THE PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO
<br />EQUIPMENT INCLUDING REQUIRED MATERIAL SUCH AS PIPING, VALVES,
<br />FILTERS, TRAPS, CHECKS VALVES, VACUUM BREAKERS, AND FLEXIBLE AND
<br />RIGID TUBING.
<br />SCHEDULES
<br />REFER TO SCHEDULES ON DRAWINGS FOR A DESCRIPTION OF LISTED ITEMS
<br />AND FURNISH ANY AND ALL PLUMBING FIXTURES LISTED AS "GC". ANY
<br />DISCREPANCIES ABOUT WHO IS TO PROVIDE PLUMBING FIXTURES IN THE
<br />SCHEDULE SHALL BE BROUGHT TO STARBUCKS ATTENTION FOR
<br />CLARIFICATION.
<br />SUPPLIES.
<br />INSTALL ALL FIXTURES LISTED REGARDLESS OF WHO
<br />DISHWASHER
<br />G.C. TO FURNISH AND INSTALL POWER CORD FOR DISHWASHER PER
<br />JURISDICTIONAL REQUIREMENTS.IF EQUIPMENT IS SPECIFIED AS
<br />HOBART ADVANSYS, THE UNIT IS TO BE PLUMBED WITH COLD, NON-
<br />FILTERED WATER.IF THE WATER FILTRATION SYSTEM IS A PENTAIR
<br />CONFIGURATION II OR III, THEN THE COLD, NON-FILTERED WATER MUST
<br />ALSO BE SOFTENED.
<br />INSULATION
<br />WATER PIPING
<br />PROVIDE THERMAL INSULATION PER THE SPECIFICATIONS.
<br />SAFETY COVERS
<br />FURNISH AND INSTALL SPECIFIED NO SCALD SAFETY COVERS WITH
<br />INSULATED FOAM LINER AND TAMPER PROOF STRAP AT ALL EXPOSED ADA
<br />SINK P-TRAPS AND WATER SUPPLIES AND AS REQUIRED BY JURISDICTION .
<br />PIPING
<br />CONDENSATE DRAINAGE PIPING
<br />THE PLUMBING CONTRACTOR SHALL PROVIDE CONDENSATE DRAINS
<br />FOR AIR HANDLING UNITS AND STARBUCKS EQUIPMENT (REFER TO
<br />SCHEDULE). CONDENSATE DRAINAGE PIPING SHALL BE TYPE "M"
<br />COPPER TUBING WITH WROUGHT COPPER SWEAT FITTINGS JOINED
<br />WITH 50/50 SOLDER.
<br />TESTING
<br />ALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE THEY
<br />ARE
<br />BACKFILLED OR CONCEALED. AFTER TESTING IS COMPLETE, THE
<br />PLUMBING
<br />CONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM AS
<br />REQUIRED BY LOCAL AUTHORITY. TEST WATER PURITY ACCORDING TO
<br />LOCAL REQUIREMENTS AND SUBMIT CERTIFIED TEST RESULTS TO
<br />ENGINEER FOR REVIEW AND APPROVAL.
<br />CARBONATION
<br />IF APPLICABLE TO PROJECT SCOPE FOR CBE STATION, STARBUCKS
<br />CARBONATION VENDOR WILL PROVIDE AND INSTALL EQUIPMENT, CO2
<br />TANKS AND FITTINGS. STARBUCKS SHALL PROVIDE AND CONTRACTOR
<br />SHALL INSTALL CO2 TANK MOUNTING BRACKET, PROTECTIVE SHELVING
<br />UNIT AND CO2 GAS TUBING AS SHOWN ON DRAWINGS AND PER
<br />MANUFACTURER’S INSTRUCTIONS. MAXIMUM TUBING LENGTH
<br />INCLUDING COILED ENDS IS 100 FT (30 M) AND MAXIMUM BEND IS TO 3
<br />INCH (75 MM) MINIMUM RADIUS. ROUTE CO2 TUBING PREFERABLY
<br />THROUGH WALL AND/OR CEILING CAVITIES, WITHOUT KINKS AND SO AS
<br />TO NOT TOUCH ANY HOT SURFACE (BALLAST, STEAM PIPE, ETC.) OR RUB
<br />AGAINST A SHARP EDGE THAT MAY ABRADE OR CUT TUBING. ALL HOLES
<br />MUST BE SEALED WITH A GROMMET OR ESCUTCHEON. TUBING IS TO BE
<br />SECURED TO APPROPRIATE PERMANENT SURFACES TO KEEP IT OFF THE
<br />FLOOR OR CABINET BOTTOMS AND AWAY FROM OTHER EQUIPMENT.
<br />LABEL BOTH ENDS OF TUBING AND REGULARLY AT TEN (10) FOOT
<br />INTERVALS ALONG ROUTE AS “CO2.”
<br />NITROGENATION
<br />STARBUCKS NITROGENATION VENDOR WILL PROVIDE AND INSTALL
<br />EQUIPMENT AND FITTINGS IF APPLICABLE TO PROJECT SCOPE FOR
<br />NITRO STATION. GENERAL CONTRACTOR SHALL COORDINATE NITRO
<br />SYSTEM INSTALLATION WITH STARBUCKS VENDOR.
<br />GENERAL PLUMBING NOTES
<br />1. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERAL
<br />CONTRACTOR TO PATCH AND REPAIR ALL EXISTING WALLS, FLOORS,
<br />CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY
<br />BECOME DAMAGED DURING THE COURSE OF WORK.
<br />2. EXPOSED/SURFACE MOUNTED PIPING IS ONLY ALLOWED IN THE BAR
<br />AREA UNDER COUNTERTOPS, WHERE IT DOES NOT OBSTRUCT
<br />CABINETS/DEVICES AND WHERE APPROVED BY STARBUCKS
<br />CONSTRUCTION MANAGER. IF ROUTED THROUGH CABINETS, IT
<br />SHALL BE ROUTED TO MAXIMIZE STORAGE SPACE AND BE
<br />PROTECTED FROM DAMAGE.
<br />3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT OR
<br />ARRANGEMENT OF SYSTEM(S). FURNISH AND INSTALL ALL
<br />COMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE A
<br />COMPLETE AND OPERATING SYSTEM. OVERALL CASEWORK
<br />COMPONENT DIMENSIONING ON PLUMBING DETAILS ARE SHOWN
<br />FOR REFERENCE AND COORDINATION ONLY.
<br />4. CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES
<br />REQUIRED BY OTHER TRADES, AND NOTIFY STARBUCKS
<br />CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO
<br />PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE
<br />OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALL
<br />DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING DIMENSIONS.
<br />5. THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORK
<br />WITH OTHER TRADES. THE ARCHITECTURAL DRAWINGS AND
<br />SPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER
<br />DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR FIXTURES IN
<br />CASEWORK AND PLUMBING DETAILS. SEE THE PROJECT MANUAL
<br />FOR PLUMBING SPECIFICATION SECTIONS.
<br />6. ALL PIPING AND/OR PLUMBING DEVICES SHALL BE SUPPORTED FROM
<br />STRUCTURE (NOT FROM HVAC DUCTS OR OTHER PIPES/CONDUITS).
<br />7. WHEN BUNDLING SEVERAL INDIRECT WASTE LINES TO DRAIN INTO
<br />FLOOR SINK, A UNISTRUT IS REQUIRED FOR SECURING AND BRACING
<br />ALL LINES ABOVE THE DRAIN.
<br />8. FURNISH AND INSTALL ALL NEEDED DRAIN LINES PER CODE (NOT ALL
<br />SHOWN).INSTALL DRAINS AT 2% SLOPE WHERE POSSIBLE WITHOUT
<br />DIPS OR SAGS. ALL INDIRECT DRAINS SHALL RUN SEPARATELY
<br />FROM EACH OTHER TO INDIRECT DRAIN RECEPTOR AND SHALL
<br />TERMINATE WITH AN AIR GAP PER CODE.
<br />9. FURNISH AND INSTALL WALL CLEANOUTS AT ALL SINKS AND AS
<br />NEEDED PER CODE (NOT ALL SHOWN).
<br />10. INSULATE ICE BIN DRAINAGE PIPES PER THE REQUIREMENTS IN THE
<br />PROJECT MANUAL.
<br />GENERAL NOTES
<br />SCOPE
<br />THE INTENT OF THE PROJECT MANUAL AND THE DRAWINGS IS TO
<br />PROVIDE A COMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM.
<br />THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND
<br />EQUIPMENT RELATED TO THE INSTALLATION OF THE PLUMBING WORK.
<br />SITE EXAMINATION
<br />THE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE
<br />FIXTURES, EQUIPMENT, AND PIPING WILL BE INSTALLED AND WILL
<br />REPORT ANY CONDITION THAT PREVENTS THE PROPER INSTALLATION
<br />OF THE PLUMBING WORK.
<br />STANDARDS
<br />EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE
<br />PROVISIONS OF LISTING STANDARD IN EFFECT AS APPLICABLE TO EACH
<br />INDIVIDUAL UNIT OR ASSEMBLY.
<br />CODES
<br />ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL
<br />APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE
<br />OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE
<br />CODES AND ORDINANCES, THE HIGHEST STANDARD SHALL APPLY. THE
<br />CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM
<br />STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS.
<br />PERMITS AND FEES
<br />THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES,
<br />AND INSPECTIONS NECESSARY TO COMPLETE THE PLUMBING WORK.
<br />WARRANTY
<br />THE CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO
<br />BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD
<br />OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY
<br />STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK
<br />PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING
<br />WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS
<br />AND WORKMANSHIP.
<br />LANDLORD REQUIREMENTS
<br />PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD /
<br />BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS.
<br />CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH
<br />REQUIREMENTS AND ADHERE TO THEM. WHERE LANDLORD / BUILDING
<br />OWNER REQUIREMENTS ARE MORE STRINGENT THAN SHOWN IN THESE
<br />PLANS. LANDLORD / BUILDING OWNER REQUIREMENTS SHALL GOVERN.
<br />WATER HAMMER ARRESTORWHA
<br />3 PETERS CANYON RD. STE 110
<br />IRVINE, CA 92606
<br />D
<br />G
<br />ESI
<br />N
<br />|
<br />ARCHITECTURE
<br />H E S T I A A T E L I E R
<br />SHEET NUMBER:
<br />SHEET TITLE:
<br />SCALE: AS SHOWN
<br />STORE #:
<br />PROJECT #:
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />N
<br />A
<br />M
<br />E
<br />:
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />A
<br />D
<br />D
<br />R
<br />E
<br />S
<br />S
<br />:
<br />C 2020 STARBUCKS COFFEE COMPANY
<br />R
<br />ISSUE DATE:
<br />2401 UTAH AVENUE SOUTH
<br />SEATTLE, WASHINGTON 98134
<br />(206) 318-1575
<br />THESE DRAWINGS AND THE PROJECT MANUAL
<br />ARE CONFIDENTIAL AND SHALL REMAIN THE
<br />SOLE PROPERTY OF STARBUCKS
<br />CORPORATION, WHICH IS THE OWNER OF THE
<br />COPYRIGHT IN THIS WORK. THEY SHALL NOT
<br />BE REPRODUCED (IN WHOLE OR IN PART),
<br />SHARED WITH THIRD PARTIES OR USED IN ANY
<br />MANNER ON OTHER PROJECTS OR
<br />EXTENSIONS TO THIS PROJECT WITHOUT THE
<br />PRIOR WRITTEN CONSENT OF STARBUCKS
<br />CORPORATION. THESE DRAWINGS AND
<br />SPECIFICATIONS ARE INTENDED TO EXPRESS
<br />DESIGN INTENT FOR A PROTOTYPICAL
<br />STARBUCKS STORE (WHICH IS SUBJECT TO
<br />CHANGE AT ANYTIME) AND DO NOT REFLECT
<br />ACTUAL SITE CONDITIONS. NEITHER PARTY
<br />SHALL HAVE ANY OBLIGATION NOR LIABILITY TO
<br />THE OTHER (EXCEPT STATED ABOVE) UNTIL A
<br />WRITTEN AGREEMENT IS FULLY EXECUTED BY
<br />BOTH PARTIES.
<br />STARBUCKS R
<br />DESIGN MANAGER:
<br />PRODUCTION DESIGNER:
<br />CHECKED BY:
<br />STARBUCKS TEMPLATE VERSION: i2021.04.23
<br />Revision Schedule
<br />Rev Date By Description
<br />March 24
<br />CH
<br />E
<br />C
<br />K
<br />
<br />S
<br />E
<br />T
<br />
<br />-
<br />
<br />0
<br />3
<br />/
<br />2
<br />2
<br />/
<br />2
<br />0
<br />2
<br />4
<br />23
<br />0
<br />1
<br />
<br />N
<br />
<br />T
<br />U
<br />S
<br />T
<br />I
<br />N
<br />
<br />A
<br />V
<br />E
<br />,
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />AN
<br />A
<br />,
<br />
<br />C
<br />A
<br />,
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />TU
<br />S
<br />T
<br />I
<br />N
<br />
<br />&
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />CL
<br />A
<br />R
<br />A
<br />76085-018
<br />51969
<br />CHARLIE CHANG
<br />AMY YANG
<br />MAGED GERGES
<br />PLUMBING GENERAL
<br />NOTES & LEGENDS
<br />P-001
<br />1S
<br />T
<br />
<br />P
<br />E
<br />R
<br />M
<br />I
<br />T
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />S
<br />E
<br />T
<br />
<br />-
<br />
<br />0
<br />4
<br />/
<br />1
<br />6
<br />/
<br />2
<br />0
<br />2
<br />4
<br />5
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />N
<br />A
<br />M
<br />E
<br />:
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />A
<br />D
<br />D
<br />R
<br />E
<br />S
<br />S
<br />:
<br />TU
<br />S
<br />T
<br />I
<br />N
<br />
<br />&
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />CL
<br />A
<br />R
<br />A
<br />23
<br />0
<br />1
<br />
<br />N
<br />
<br />T
<br />U
<br />S
<br />T
<br />I
<br />N
<br />
<br />A
<br />V
<br />E
<br />,
<br />
<br />S
<br />U
<br />I
<br />T
<br />E
<br />
<br />A
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />,
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />STORE #:
<br />PROJECT #:
<br />ISSUE DATE:
<br />DESIGN MANAGER:
<br />PRODUCTION DESIGNER:
<br />CHECKED BY:
<br />76085-018
<br />04-15-2024
<br />51969
<br />CHARLIE CHANG
<br />SEPIDEH SHARIFI
<br />MAGED GERGES
<br />2301 N Tustin Ave
<br />#A8/22/2024
|