Laserfiche WebLink
ABBREVIATIONS <br />ABOVE FINISHED FLOOR <br />PLUMBING SYMBOL LEGEND <br />AFF <br />AHJ AUTHORITIES HAVING JURISDICTION <br />APPROX APPROXIMATE <br />BLDG BUILDING <br />CLG CEILING <br />CONST CONSTRUCTION <br />CW DOMESTIC COLD WATER <br />CXA COMMISSIONING AGENT <br />DEG DEGREES <br />DN <br />DTL <br />EC <br />DOWN <br />DETAIL <br />DWG(S) DRAWING(S) <br />EA EACH <br />ELECTRICAL CONTRACTOR <br />ELEC ELECTRICAL <br />EMER EMERGENCY <br />EXIST EXISTING <br />EXT EXTERIOR <br />FD <br />FS <br />F&I <br />FLOOR DRAIN <br />FLOOR SINK <br />FURNISH & INSTALL <br />FOIC FURNISHED BY OWNER, <br />INSTALLED BY CONTRACTOR <br />FOIO FURNISHED BY OWNER, <br />INSTALLED BY OWNER <br />FLR <br />FT <br />FLOOR <br />FOOT/FEET <br />FCO FLOOR CLEANOUT <br />GC <br />HR HOUR <br />HVAC HEATING, VENTILATION, AND AIR <br />CONDITIONING <br />HW HOT WATER <br />HS HANDSINK <br />HWS HOT WATER SUPPLY <br />HWR HOT WATER RETURN <br />LL <br />LV <br />LANDLORD <br />LOW VOLTAGE <br />MAX MAXIMUM <br />MC MECHANICAL CONTRACTOR <br />MDP MAIN DISTRIBUTION PANEL <br />MECH MECHANICAL <br />MEP MECHANICAL, ELECTRICAL, AND PLUMBING <br />MFG MANUFACTURER <br />MIN MINIMUM <br />MS MOP SINK <br />NL <br />NTS <br />PC <br />PS <br />NIGHTLIGHT <br />NOT TO SCALE <br />PLUMBING CONTRACTOR <br />PREP SINK <br />POC POINT OF CONNECTION <br />REF REFERENCE <br />REQ’D REQUIRED <br />REV REVISION <br />SHT <br />SF <br />TEL <br />SHEET <br />SQUARE FEET <br />SPECS SPECIFICATION(S) <br />SST STAINLESS STEEL <br />TELEPHONE <br />TEMP TEMPORARY <br />TMV <br />TYPICAL <br />UC <br />TEMPERATURE MIXING VALVE <br />TW TEMPERED HOT WATER <br />TYP <br />UNDER COUNTER <br />UNO UNLESS NOTED OTHERWISE <br />V VENT <br />W SANITARY WASTE <br />WCO WALL CLEANOUT <br />WH WATER HEATER <br />WP WEATHER PROOF <br />APPLICABLE CODES <br />CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STATE CODES <br />WHETHER INDICATED HEREIN OR NOT. <br />2022 CALIFORNIA BUILDING STANDARDS CODE: <br />• PART 1 - CALIFORNIA ADMINISTRATIVE CODE (CAC) <br />• PART 2 - CALIFORNIA BUILDING CODE (CBC) <br />• PART 3 - CALIFORNIA ELECTRICAL CODE (CEC) <br />• PART 4 - CALIFORNIA MECHANICAL CODE (CMC) <br />• PART 5 - CALIFORNIA PLUMBING CODE (CPC) <br />• PART 6 - CALIFORNIA ENERGY CODE (CENC) <br />• PART 7 - (CURRENTLY VACANT) <br />• PART 8 - CALIFORNIA HISTORICAL BUILDING CODE (CHBC) <br />• PART 9 - CALIFORNIA FIRE CODE (CFC) <br />• PART 10 - CALIFORNIA EXISTING BUILDING CODE (CEBC) <br />• PART 11 - CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN) <br />• PART 12 - CALIFORNIA REFERENCE STANDARDS CODE <br />FS <br />M WM <br />POC <br />FLOOR SINK <br />WATER METER <br />CONNECT TO EXISTING <br />F. ALL DOMESTIC WATER HEATING, RECIRCULATING, FILTER AND <br />SOFTENING EQUIPMENT SHALL BE TESTED AND/OR ADJUSTED <br />AND BALANCED BY THE CONTRACTOR'S TESTING, ADJUSTING <br />AND BALANCE AGENT (SEE TESTING ADJUSTING AND BALANCING) <br />OR THE MANUFACTURER'S CERTIFIED STARTUP <br />REPRESENTATIVE AFTER THE SYSTEM IS VERIFIED TO BE <br />COMPLETE AND CORRECT BY STARBUCKS CXA IN ACCORDANCE <br />WITH THE REQUIREMENTS OF THESE DOCUMENTS. SEQUENCES <br />OF OPERATION SHALL BE TESTED TO ENSURE THAT THEY <br />OPERATE IN ACCORDANCE WITH THE CONTRACT <br />REQUIREMENTS. DELIVERABLES: PRELIMINARY, WRITTEN <br />FUNCTIONAL PERFORMANCE REPORT CONFORMING TO THE <br />REQUIREMENTS SPECIFIED HEREIN, DOCUMENTING THE <br />INFORMATION SPECIFIED, ETC. TO THE STARBUCKS CXA <br />IMMEDIATELY UPON COMPLETION OF THE WORK. <br />G. CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN <br />EQUIPMENT IS READY FOR FUNCTIONAL PERFORMANCE <br />TESTING. ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL <br />PERFORMANCE TESTING PRIOR TO STARTING TESTING. <br />CONTRACTOR SHALL OPERATE EQUIPMENT FOR STARBUCKS <br />CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION <br />OF EQUIPMENT, RESPONSE OF SENSORS, AND PROPER <br />EXECUTION OF HVAC CONTROL AND LIGHTING SEQUENCES; <br />INCLUDING BUT NOT LIMITED TO, AIR MOVEMENT, TEMPERATURE, <br />SOUND, AND CONTROL RESPONSE. PROVIDE ANY SECURITY <br />ACCESS, HARDWARE, SOFTWARE, OR OTHER SUPPORT AS <br />NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS <br />AND DOCUMENT ALL EQUIPMENT TESTING. STARBUCKS CXA <br />WILL RECORD THE EQUIPMENT OPERATION AND RESPONSE TO <br />TESTING SEQUENCES AND PREPARE A LIST OF ANY <br />DEFICIENCIES DISCLOSED BY THE FUNCTIONAL PERFORMANCE <br />TESTS FOR CORRECTION BY THE CONTRACTOR. EQUIPMENT <br />INCLUDES, BUT IS NOT LIMITED TO, AIR HANDLING UNITS, <br />ROOFTOP AND SPLIT TYPE, CONDENSING UNITS, EXHAUST FANS, <br />LIGHTING CONTROLS, ETC. DELIVERABLES: PROVIDE COMPLETED <br />COPIES OF ALL START UP REPORTS, FILLED OUT ON THE <br />MANUFACTURER'S FORMS, TO THE STARBUCKS CXA. <br />H. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES <br />OR DEFICIENCIES DISCLOSED DURING THE FUNCTIONAL <br />PERFORMANCE TESTING PROCESS. CORRECTIONS SHOULD BE <br />MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE <br />SYSTEM AND CONSTRUCTION SCHEDULE. <br />I. CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY RE- <br />TESTING OF EQUIPMENT DEEMED NECESSARY BY STARBUCKS <br />CXA DURING INSTALLATION VERIFICATION AND FUNCTIONAL <br />PERFORMANCE TESTING. CONTRACTOR IS RESPONSIBLE FOR <br />CORRECTING ANY ISSUES OR DEFICIENCIES FOUND IN THE <br />SYSTEM DURING ANY AND ALL RE-TESTING. CORRECTIONS <br />SHOULD BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO <br />THE SYSTEM AND CONSTRUCTION SCHEDULE. DELIVERABLES: <br />FINAL BALANCE REPORT, DEFICIENCIES LIST NOTING <br />CORRECTIVE ACTIONS PERFORMED BY CONTRACTOR IN <br />RESPONSE TO INSTALLATION VERIFICATION AND FUNCTIONAL <br />PERFORMANCE TEST RESULTS. <br />J. CONSTRUCTION AND POST CONSTRUCTION TESTING: <br />ADDITIONAL TESTING MAY BE REQUIRED BY LEED AND OTHER <br />PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH <br />COMMISSIONING SERVICE. CONTRACTOR SHALL CONDUCT, <br />DOCUMENT, SUPPORT AND SCHEDULE THIS TESTING AS <br />DIRECTED BY STARBUCKS CXA. <br />FCO <br />WCO WALL CLEANOUT <br />FLOOR CLEANOUT <br />GENERAL CONTRACTOR <br />GFCI GROUND FAULT CIRCUIT INTERRUPTER <br />GW GREASE WASTE <br />S <br />SHOCK ABSORBER <br />STRAINER <br />HB HOSE BIBB <br />D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY <br />STARBUCKS CXA. CONTRACTOR SHALL SUPPORT STARBUCKS <br />CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY. <br />PROVIDE ALL ACCESS AND EQUIPMENT NECESSARY FOR <br />STARBUCKS STAFF TO VERIFY THAT THE EQUIPMENT IS <br />INSTALLED CORRECTLY. <br />E. CONTRACTOR SHALL BE READILY AVAILABLE DURING <br />INSTALLATION VERIFICATION TO CORRECT ANY DEFICIENCIES OR <br />DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION <br />PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER <br />WITHOUT DISRUPTION OF THE CONSTRUCTION SCHEDULE. <br />CH. V <br />RV <br />CHECK VALVE <br />RELIEF VALVE <br />BV <br />GV <br />BALL VALVE <br />GATE VALVE <br />TW <br />RO <br />RD <br />G <br />RS <br />TW <br />RO <br />G <br />RD <br />RS <br />TEMPERED WATER <br />REVERSE OSMOSIS WATER <br />GAS PIPING <br />REFRIGERANT DISCHARGE PIPING <br />REFRIGERANT SUCTION PIPING <br />GW <br />CD <br />S OR W <br />S OR W <br />V <br />CD <br />GW <br />CW <br />HW <br />CWF <br />CWN <br />CWS <br />CWF <br />CWN <br />CWS <br />SANITARY OR WASTE PIPING ABOVE SLAB <br />SANITARY OR WASTE PIPING BELOW SLAB <br />CONDENSATE DRAIN <br />VENT PIPING <br />HOT WATER PIPING <br />GREASE WASTE <br />COLD WATER PIPING <br />COLD WATER FILTERED <br />COLD WATER NANO FILTERED <br />COLD WATER SOFTENED <br />SYSTEM COMMISSIONING <br />CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING <br />CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED, <br />NEEDED AND REQUIRED TO CONDUCT AND FACILITATE STARBUCKS <br />STAFF BUILDING COMMISSIONING EFFORTS. THIS WORK WILL BE <br />COMPRISED OF THREE DISTINCT EFFORTS: <br />1) SUPPORT STARBUCKS COMMISSIONING AGENT (CXA) DURING <br />INSTALLATION VERIFICATION AND CORRECT DISCLOSED <br />DEFICIENCIES; <br />2) PERFORM TESTING, ADJUSTING, BALANCING AND SYSTEM STARTUP <br />AND SUPPORT FUNCTIONAL PERFORMANCE TESTING BY STARBUCKS <br />CXA; <br />3) CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL PERFORMANCE <br />TESTING AND SUBMIT REPORTS. CONTRACTOR SHALL PERFORM AND <br />PROVIDE THE FOLLOWING: <br />A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE <br />NOT LIMITED TO, DOMESTIC HOT WATER GENERATION. <br />B. CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN <br />PROJECT SCHEDULE AND SHOW INTERVALS FOR PERFORMANCE <br />OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND <br />INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA. <br />CONTRACTOR SHALL SHOW RESOURCES FOR PERFORMING ALL <br />WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE ITEM <br />IN THE SCHEDULE OF VALUES. <br />C. CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH <br />THE MANUFACTURER’S REQUIREMENTS AND ALL CONTRACT <br />DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED <br />TOTALLY COMPLETE, AND ACCESSIBLE TO STARBUCKS CXA FOR <br />INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE <br />TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION <br />VERIFICATION. <br />VALVES <br />GENERAL <br />INSTALL VALVES FOR EACH FIXTURE AND ITEM OF EQUIPMENT. PROVIDE <br />BRAIDED STAINLESS STEEL HOSE (UNLESS OTHERWISE NOTED) BETWEEN <br />VALVE AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S <br />SPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO EQUIPMENT <br />FOR EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUT <br />MOVING EQUIPMENT. SHUT OFF VALVES TO BE BALL TYPE. VALVES SHALL <br />BE LISTED/APPROVED FOR USE PER AUTHORITIES HAVING JURISDICTION <br />(AHJ) AND CODE REQUIREMENTS. PROVIDE VALVE IDENTIFICATION PER <br />THE PROJECT MANUAL FOR MAIN WATER SERVICE SHUT-OFF AND ANY <br />OTHER VALVES WHICH ARE NOT CLEARLY EVIDENT WHAT THEY SERVE. <br />PLUMBING FIXTURES <br />WATER HEATER <br />SIZE WATER HEATER PER STARBUCKS STANDARD AND PER AUTHORITIES <br />HAVING JURISDICTION (AHJ), WHICHEVER IS MORE STRINGENT. PROVIDE <br />INSTALLATION COMPLETE WITH FITTINGS AS SHOWN IN THE DRAWINGS. <br />SET HOT WATER TEMPERATURE AT 140° F OR ADJUST AS REQUIRED BY AHJ. <br />PROVIDE THERMOMETER ON HOT WATER PIPE LEAVING WATER HEATER. <br />WATER FILTRATION <br />STARBUCKS WATER FILTRATION VENDOR WILL PROVIDE FILTRATION <br />SYSTEM. CONTRACTOR SHALL CONFIRM WITH STARBUCKS CONSTRUCTION <br />MANAGER WHETHER VENDOR OR PLUMBING CONTRACTOR IS TO INSTALL <br />FILTRATION SYSTEM. PROVIDE AND COORDINATE INSTALLATION COMPLETE <br />WITH ALL PIPING, FITTINGS, AND EQUIPMENT AS INDICATED ON THE <br />DRAWINGS. <br />CONNECTIONS <br />THE PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO <br />EQUIPMENT INCLUDING REQUIRED MATERIAL SUCH AS PIPING, VALVES, <br />FILTERS, TRAPS, CHECKS VALVES, VACUUM BREAKERS, AND FLEXIBLE AND <br />RIGID TUBING. <br />SCHEDULES <br />REFER TO SCHEDULES ON DRAWINGS FOR A DESCRIPTION OF LISTED ITEMS <br />AND FURNISH ANY AND ALL PLUMBING FIXTURES LISTED AS "GC". ANY <br />DISCREPANCIES ABOUT WHO IS TO PROVIDE PLUMBING FIXTURES IN THE <br />SCHEDULE SHALL BE BROUGHT TO STARBUCKS ATTENTION FOR <br />CLARIFICATION. <br />SUPPLIES. <br />INSTALL ALL FIXTURES LISTED REGARDLESS OF WHO <br />DISHWASHER <br />G.C. TO FURNISH AND INSTALL POWER CORD FOR DISHWASHER PER <br />JURISDICTIONAL REQUIREMENTS.IF EQUIPMENT IS SPECIFIED AS <br />HOBART ADVANSYS, THE UNIT IS TO BE PLUMBED WITH COLD, NON- <br />FILTERED WATER.IF THE WATER FILTRATION SYSTEM IS A PENTAIR <br />CONFIGURATION II OR III, THEN THE COLD, NON-FILTERED WATER MUST <br />ALSO BE SOFTENED. <br />INSULATION <br />WATER PIPING <br />PROVIDE THERMAL INSULATION PER THE SPECIFICATIONS. <br />SAFETY COVERS <br />FURNISH AND INSTALL SPECIFIED NO SCALD SAFETY COVERS WITH <br />INSULATED FOAM LINER AND TAMPER PROOF STRAP AT ALL EXPOSED ADA <br />SINK P-TRAPS AND WATER SUPPLIES AND AS REQUIRED BY JURISDICTION . <br />PIPING <br />CONDENSATE DRAINAGE PIPING <br />THE PLUMBING CONTRACTOR SHALL PROVIDE CONDENSATE DRAINS <br />FOR AIR HANDLING UNITS AND STARBUCKS EQUIPMENT (REFER TO <br />SCHEDULE). CONDENSATE DRAINAGE PIPING SHALL BE TYPE "M" <br />COPPER TUBING WITH WROUGHT COPPER SWEAT FITTINGS JOINED <br />WITH 50/50 SOLDER. <br />TESTING <br />ALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE THEY <br />ARE <br />BACKFILLED OR CONCEALED. AFTER TESTING IS COMPLETE, THE <br />PLUMBING <br />CONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM AS <br />REQUIRED BY LOCAL AUTHORITY. TEST WATER PURITY ACCORDING TO <br />LOCAL REQUIREMENTS AND SUBMIT CERTIFIED TEST RESULTS TO <br />ENGINEER FOR REVIEW AND APPROVAL. <br />CARBONATION <br />IF APPLICABLE TO PROJECT SCOPE FOR CBE STATION, STARBUCKS <br />CARBONATION VENDOR WILL PROVIDE AND INSTALL EQUIPMENT, CO2 <br />TANKS AND FITTINGS. STARBUCKS SHALL PROVIDE AND CONTRACTOR <br />SHALL INSTALL CO2 TANK MOUNTING BRACKET, PROTECTIVE SHELVING <br />UNIT AND CO2 GAS TUBING AS SHOWN ON DRAWINGS AND PER <br />MANUFACTURER’S INSTRUCTIONS. MAXIMUM TUBING LENGTH <br />INCLUDING COILED ENDS IS 100 FT (30 M) AND MAXIMUM BEND IS TO 3 <br />INCH (75 MM) MINIMUM RADIUS. ROUTE CO2 TUBING PREFERABLY <br />THROUGH WALL AND/OR CEILING CAVITIES, WITHOUT KINKS AND SO AS <br />TO NOT TOUCH ANY HOT SURFACE (BALLAST, STEAM PIPE, ETC.) OR RUB <br />AGAINST A SHARP EDGE THAT MAY ABRADE OR CUT TUBING. ALL HOLES <br />MUST BE SEALED WITH A GROMMET OR ESCUTCHEON. TUBING IS TO BE <br />SECURED TO APPROPRIATE PERMANENT SURFACES TO KEEP IT OFF THE <br />FLOOR OR CABINET BOTTOMS AND AWAY FROM OTHER EQUIPMENT. <br />LABEL BOTH ENDS OF TUBING AND REGULARLY AT TEN (10) FOOT <br />INTERVALS ALONG ROUTE AS “CO2.” <br />NITROGENATION <br />STARBUCKS NITROGENATION VENDOR WILL PROVIDE AND INSTALL <br />EQUIPMENT AND FITTINGS IF APPLICABLE TO PROJECT SCOPE FOR <br />NITRO STATION. GENERAL CONTRACTOR SHALL COORDINATE NITRO <br />SYSTEM INSTALLATION WITH STARBUCKS VENDOR. <br />GENERAL PLUMBING NOTES <br />1. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERAL <br />CONTRACTOR TO PATCH AND REPAIR ALL EXISTING WALLS, FLOORS, <br />CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY <br />BECOME DAMAGED DURING THE COURSE OF WORK. <br />2. EXPOSED/SURFACE MOUNTED PIPING IS ONLY ALLOWED IN THE BAR <br />AREA UNDER COUNTERTOPS, WHERE IT DOES NOT OBSTRUCT <br />CABINETS/DEVICES AND WHERE APPROVED BY STARBUCKS <br />CONSTRUCTION MANAGER. IF ROUTED THROUGH CABINETS, IT <br />SHALL BE ROUTED TO MAXIMIZE STORAGE SPACE AND BE <br />PROTECTED FROM DAMAGE. <br />3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT OR <br />ARRANGEMENT OF SYSTEM(S). FURNISH AND INSTALL ALL <br />COMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE A <br />COMPLETE AND OPERATING SYSTEM. OVERALL CASEWORK <br />COMPONENT DIMENSIONING ON PLUMBING DETAILS ARE SHOWN <br />FOR REFERENCE AND COORDINATION ONLY. <br />4. CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES <br />REQUIRED BY OTHER TRADES, AND NOTIFY STARBUCKS <br />CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO <br />PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE <br />OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALL <br />DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING DIMENSIONS. <br />5. THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORK <br />WITH OTHER TRADES. THE ARCHITECTURAL DRAWINGS AND <br />SPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER <br />DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR FIXTURES IN <br />CASEWORK AND PLUMBING DETAILS. SEE THE PROJECT MANUAL <br />FOR PLUMBING SPECIFICATION SECTIONS. <br />6. ALL PIPING AND/OR PLUMBING DEVICES SHALL BE SUPPORTED FROM <br />STRUCTURE (NOT FROM HVAC DUCTS OR OTHER PIPES/CONDUITS). <br />7. WHEN BUNDLING SEVERAL INDIRECT WASTE LINES TO DRAIN INTO <br />FLOOR SINK, A UNISTRUT IS REQUIRED FOR SECURING AND BRACING <br />ALL LINES ABOVE THE DRAIN. <br />8. FURNISH AND INSTALL ALL NEEDED DRAIN LINES PER CODE (NOT ALL <br />SHOWN).INSTALL DRAINS AT 2% SLOPE WHERE POSSIBLE WITHOUT <br />DIPS OR SAGS. ALL INDIRECT DRAINS SHALL RUN SEPARATELY <br />FROM EACH OTHER TO INDIRECT DRAIN RECEPTOR AND SHALL <br />TERMINATE WITH AN AIR GAP PER CODE. <br />9. FURNISH AND INSTALL WALL CLEANOUTS AT ALL SINKS AND AS <br />NEEDED PER CODE (NOT ALL SHOWN). <br />10. INSULATE ICE BIN DRAINAGE PIPES PER THE REQUIREMENTS IN THE <br />PROJECT MANUAL. <br />GENERAL NOTES <br />SCOPE <br />THE INTENT OF THE PROJECT MANUAL AND THE DRAWINGS IS TO <br />PROVIDE A COMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM. <br />THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND <br />EQUIPMENT RELATED TO THE INSTALLATION OF THE PLUMBING WORK. <br />SITE EXAMINATION <br />THE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE <br />FIXTURES, EQUIPMENT, AND PIPING WILL BE INSTALLED AND WILL <br />REPORT ANY CONDITION THAT PREVENTS THE PROPER INSTALLATION <br />OF THE PLUMBING WORK. <br />STANDARDS <br />EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE <br />PROVISIONS OF LISTING STANDARD IN EFFECT AS APPLICABLE TO EACH <br />INDIVIDUAL UNIT OR ASSEMBLY. <br />CODES <br />ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL <br />APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE <br />OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE <br />CODES AND ORDINANCES, THE HIGHEST STANDARD SHALL APPLY. THE <br />CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM <br />STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. <br />PERMITS AND FEES <br />THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES, <br />AND INSPECTIONS NECESSARY TO COMPLETE THE PLUMBING WORK. <br />WARRANTY <br />THE CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO <br />BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD <br />OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY <br />STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK <br />PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING <br />WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS <br />AND WORKMANSHIP. <br />LANDLORD REQUIREMENTS <br />PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD / <br />BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS. <br />CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH <br />REQUIREMENTS AND ADHERE TO THEM. WHERE LANDLORD / BUILDING <br />OWNER REQUIREMENTS ARE MORE STRINGENT THAN SHOWN IN THESE <br />PLANS. LANDLORD / BUILDING OWNER REQUIREMENTS SHALL GOVERN. <br />WATER HAMMER ARRESTORWHA <br />3 PETERS CANYON RD. STE 110 <br />IRVINE, CA 92606 <br />D <br />G <br />ESI <br />N <br />| <br />ARCHITECTURE <br />H E S T I A A T E L I E R <br />SHEET NUMBER: <br />SHEET TITLE: <br />SCALE: AS SHOWN <br />STORE #: <br />PROJECT #: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />C 2020 STARBUCKS COFFEE COMPANY <br />R <br />ISSUE DATE: <br />2401 UTAH AVENUE SOUTH <br />SEATTLE, WASHINGTON 98134 <br />(206) 318-1575 <br />THESE DRAWINGS AND THE PROJECT MANUAL <br />ARE CONFIDENTIAL AND SHALL REMAIN THE <br />SOLE PROPERTY OF STARBUCKS <br />CORPORATION, WHICH IS THE OWNER OF THE <br />COPYRIGHT IN THIS WORK. THEY SHALL NOT <br />BE REPRODUCED (IN WHOLE OR IN PART), <br />SHARED WITH THIRD PARTIES OR USED IN ANY <br />MANNER ON OTHER PROJECTS OR <br />EXTENSIONS TO THIS PROJECT WITHOUT THE <br />PRIOR WRITTEN CONSENT OF STARBUCKS <br />CORPORATION. THESE DRAWINGS AND <br />SPECIFICATIONS ARE INTENDED TO EXPRESS <br />DESIGN INTENT FOR A PROTOTYPICAL <br />STARBUCKS STORE (WHICH IS SUBJECT TO <br />CHANGE AT ANYTIME) AND DO NOT REFLECT <br />ACTUAL SITE CONDITIONS. NEITHER PARTY <br />SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br />THE OTHER (EXCEPT STATED ABOVE) UNTIL A <br />WRITTEN AGREEMENT IS FULLY EXECUTED BY <br />BOTH PARTIES. <br />STARBUCKS R <br />DESIGN MANAGER: <br />PRODUCTION DESIGNER: <br />CHECKED BY: <br />STARBUCKS TEMPLATE VERSION: i2021.04.23 <br />Revision Schedule <br />Rev Date By Description <br />March 24 <br />CH <br />E <br />C <br />K <br /> <br />S <br />E <br />T <br /> <br />- <br /> <br />0 <br />3 <br />/ <br />2 <br />2 <br />/ <br />2 <br />0 <br />2 <br />4 <br />23 <br />0 <br />1 <br /> <br />N <br /> <br />T <br />U <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br />AN <br />A <br />, <br /> <br />C <br />A <br />, <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />TU <br />S <br />T <br />I <br />N <br /> <br />& <br /> <br />S <br />A <br />N <br />T <br />A <br />CL <br />A <br />R <br />A <br />76085-018 <br />51969 <br />CHARLIE CHANG <br />AMY YANG <br />MAGED GERGES <br />PLUMBING GENERAL <br />NOTES & LEGENDS <br />P-001 <br />1S <br />T <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />S <br />E <br />T <br /> <br />- <br /> <br />0 <br />4 <br />/ <br />1 <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br />5 <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />TU <br />S <br />T <br />I <br />N <br /> <br />& <br /> <br />S <br />A <br />N <br />T <br />A <br />CL <br />A <br />R <br />A <br />23 <br />0 <br />1 <br /> <br />N <br /> <br />T <br />U <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />A <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />, <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />STORE #: <br />PROJECT #: <br />ISSUE DATE: <br />DESIGN MANAGER: <br />PRODUCTION DESIGNER: <br />CHECKED BY: <br />76085-018 <br />04-15-2024 <br />51969 <br />CHARLIE CHANG <br />SEPIDEH SHARIFI <br />MAGED GERGES <br />2301 N Tustin Ave <br />#A8/22/2024