Laserfiche WebLink
COVER SHEET <br />PHOTOVOLTAIC ROOF MOUNT SYSTEM <br />SHEET NAME <br />SHEET NUMBER <br />PROJECT NAME <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />DEL MAR, CA 92014, USA <br />REVDATEDESCRIPTION <br />VERSION <br />URINITIAL RELEASE <br />DESIGN SUPPORT DAY OF INSTALL: <br />CHAT.POWUR.COM <br />PV-0 <br />03-30-2024 <br />IM <br />E <br />L <br />D <br />A <br /> <br />V <br />I <br />L <br />L <br />E <br />G <br />A <br />S <br />22 <br />1 <br />8 <br /> <br />S <br /> <br />A <br />R <br />T <br />E <br />S <br />I <br />A <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />, <br /> <br />U <br />S <br />A <br />UT <br />I <br />L <br />I <br />T <br />Y <br />: <br /> <br />S <br />O <br />U <br />T <br />H <br />E <br />R <br />N <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />E <br />D <br />I <br />S <br />O <br />N <br />(S <br />C <br />E <br />) <br />AP <br />N <br />: <br /> <br />4 <br />0 <br />8 <br />4 <br />3 <br />3 <br />1 <br />1 <br />AH <br />J <br />: <br /> <br />C <br />I <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />2 VICINITY MAP <br />SCALE: NTSPV-0 <br />1 AERIAL PHOTO <br />SCALE: NTSPV-0 <br />GENERAL NOTES <br />· THE CONTRACTOR/INSTALLER OF THE SOLAR PV SYSTEM OVER EXISTING <br />ROOF SHALL CONFORM TO OSHA REQUIREMENTS DURING THE <br />CONSTRUCTION PHASE. JOB SAFETY AND CONSTRUCTION PROCEDURES <br />ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR/INSTALLER. <br />· REFER TO ELECTRICAL DRAWING PV-4 FOR PANEL DETAILED <br />INFORMATION. <br />· IN CASE OF CONFLICT BETWEEN STRUCTURAL DRAWINGS AND <br />ELECTRICAL DRAWINGS, THE MOST RIGID REQUIREMENTS SHALL <br />GOVERN. <br />· THE CONTRACTOR/INSTALLER SHALL VERIFY ALL EXISTING BUILDING <br />INFORMATION SHOWN (DIMENSIONS, ROOF TOP PROJECTIONS, ETC.) AND <br />NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO INSTALLATIONS <br />OF PV SYSTEM. <br />· THE CONTRACTOR/INSTALLER SHALL VERIFY AND COORDINATE EXISTING <br />OPENINGS, ROOF TOP UNITS, VENT PIPES, ETC. SHOWN ON DRAWINGS. IF <br />THERE IS A DISCREPANCY BETWEEN DRAWINGS, IT IS THE <br />CONTRACTORS/INSTALLER'S RESPONSIBILITY TO NOTIFY ENGINEER <br />PRIOR TO PERFORMING THE WORK. <br />· ALL CONSTRUCTION IS TO BE PERFORMED IN STRICT CONFORMANCE <br />WITH ALL APPLICABLE TOWN, COUNTY & STATE REGULATIONS AND/OR <br />ANY OTHER GOVERNING BODIES. <br />· DO NOT SCALE THESE DRAWINGS, USE DIMENSIONS. CONTRACTOR MUST <br />CONDUCT ROOF SURVEY TO VERIFY DIMENSIONS SHOWN ON PLAN PRIOR <br />TO INSTALLATION. IF THERE IS A DISCREPANCY IT IS <br />CONTRACTOR/INSTALLER'S RESPONSIBILITY TO NOTIFY THE ENGINEER <br />IMMEDIATELY. <br />· LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS <br />OVER OPENINGS SUCH AS DOORS OR WINDOWS. <br />· LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN <br />LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH <br />OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES, OR SIGNS. <br />· DISCONNECT MEANS MUST HAVE DEDICATED CLEAR UNOBSTRUCTED <br />WORKING SPACE NOT LESS THAN 3' DEEP BY 2.5' WIDE TO NOT LESS <br />THAN 6.5' ABOVE WALKABLE SURFACES IN FRONT OF DISTRIBUTION <br />PANEL. <br />· ALL SOLAR MODULES, EQUIPMENT, AND METALLIC COMPONENTS TO BE <br />BONDED. <br />· PV ARRAY NOT TO EXCEED HIGHEST POINT OF THE ROOF. <br />· RAPID SHUTDOWN IS ACTIVED AT THE INVERTER BY THE AC DISCONNECT. <br />.ELECTRICAL NOTES <br />· ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR <br />ITS APPLICATION. <br />· ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE <br />C WET ENVIRONMENT. <br />·WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE <br />ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE <br />NEAREST RIDGE, HIP, OR VALLEY. <br />· WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL <br />EQUIPMENT SHALL COMPLY WITH CEC 110.26. <br />·DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. <br />CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, <br />FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND <br />STANDARDS. <br />·WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT <br />SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. <br />·ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND <br />READILY VISIBLE. <br />·MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME <br />AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP <br />MANUFACTURER'S INSTRUCTION. <br />·MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER E.G.C. <br />VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. <br />·THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE <br />SHEET INDEX <br />PV-0 COVER SHEET <br />PV-1 SITE PLAN WITH ROOF PLAN <br />PV-2 ROOF PLAN WITH MODULES <br />PV-3 ATTACHMENT DETAILS <br />PV-4 ELECTRICAL LINE DIAGRAM WITH <br />WIRE CALCULATION <br />PV-5 WARNING LABELS & PLACARD <br />PV-6+ EQUIPMENT SPEC SHEETS <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br />2022 CALIFORNIA EXISTING BUILDING CODE (CEBC) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />2022 CALIFORNIA GREEN BUILDING CODE (CGBC) <br />2022 CALIFORNIA ENERGY CODE (CEC) <br />2022 CALIFORNIA FIRE CODE TITLE 24 SUPPLEMENT <br />ANY OTHER LOCAL AMENDMENTS <br />GOVERNING CODES: <br />INTERCONNECTION METHOD : BACK FEED <br />NOTE: INSTALLER TO DETERMINE OPTIMAL <br />CONDUIT RUN ON SITE. ATTIC RUN IS <br />OPTIONAL UNLESS REQUIRED BELOW. <br />ATTIC RUN: OPTIONAL <br />SYSTEM SUMMARY <br />(N)18 - HANWHA Q-CELLS Q.PEAK DUO ML-G10+ (405W) MODULES <br />(N)18 - ENPHASE ENERGY IQ8PLUS-72-2-US MICRO-INVERTERS <br />(N)JUNCTION BOX <br />(N)ENPHASE IQ COMBINER BOX 5 (X-IQ-AM1-240-5) <br />(E)125A MAIN SERVICE PANEL WITH (E) 100A MAIN BREAKER <br />DESIGN CRITERIA <br />ROOF TYPE:- ASPHALT SHINGLE <br />NUMBER OF LAYERS:- 01 <br />ROOF FRAME:- 2"X4" TRUSSES @ 24" O.C <br />STORY:- ONE STORY <br />SNOW LOAD:- 0 PSF <br />WIND SPEED:- 95 MPH <br />WIND EXPOSURE:- C <br />RISK CATEGORY:- II <br />COORDINATE:- 33.716960, -117.895880 <br />18 MODULES-ROOF MOUNTED - 7.290 kWDC, 6.658 CEC kWAC <br />2218 S ARTESIA ST, SANTA ANA, CA 92704, USA <br />6/30/2024 <br />Stamped 04/05/2024 <br />The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the <br />existing buildings and structures as shown. <br />The scope of the plans is for the installation of the solar photovoltaic <br />system only and the approval is subject to compliance with all applicable <br />city and state codes and regulations regarding construction. The <br />approval of the plans does not constitute any certification of the <br />accuracy, completeness, or building permit status of the existing <br />buildings and structures as shown. <br />Bldg#: 101118868 <br />Elec: 20182517 <br />2218 S Artesia St- 101118868 & <br />20182517 <br />4/11/2024