Laserfiche WebLink
<br /> <br />Mount Post-Modification Analysis Report <br />(3) 15.83-Ft T-Arm <br />January 6, 2022 <br />Site ID: 123963-VZW / CRAZY HORSE <br />Page | 5 <br /> <br /> <br />Requirements: <br /> <br />The existing mounts will be SUFFICIENT for the final loading configuration (attachment 2) after the modifications <br />detailed in attachment 3 are successfully completed. <br /> <br />ANSI/ASSP rigging plan review services compliant with the requirements of ANSI/TIA 322 are available for a <br />Construction Class IV site or other, if required. Separate review fees will apply . <br /> <br /> <br />Attachments: <br /> <br />1. Contractor Required PMI Report Deliverables <br />2. Antenna Placement Diagrams <br />3. Mount Modification Drawings <br />4. Mount Photos <br />5. Mount Mapping Report (for reference only) <br />6. Analysis Calculations <br />2210 3%4 S Ritchey St # <br />WCC018/5/2024