Laserfiche WebLink
<br /> <br /> <br />o Photos showing each individual sector after installation of modifications. Each entire <br />sector must be in one photo to show the interconnection of members. <br />▪ These photos shall also certify that the placement and geometry of the <br />equipment on the mount is as depicted in the antenna placement diagram in this <br />form. <br />o Photos that show the model number of each antenna and piece of equipment installed <br />per sector. <br />o Photos of each installed modification per the modification drawings; pictures shall also <br />include connection hardware (U-bolts, bolts, nuts, all-threaded rods, etc.) <br />o Photos showing the distances (relative distance between collars) of the installed <br />modifications from the appropriate reference locations shown in the modification <br />drawings. <br />o Photos showing the installed modifications onto the tower (i.e. ring/collar mounts, tie- <br />backs, V-bracing kits, etc.); if the existing mount elevation needs to be changed <br />according to the modification drawings, an elevation measurement shall be provided <br />before the elevation change. <br /> <br />Material Certification: <br />• Materials utilized must be as per specification on the drawings or the equivalent as validated by <br />the SMART Tool vendor. <br />o If the materials are as specified on the drawings <br />▪ The contractor shall provide the packing list, or the materials certifications for <br />the materials utilized to perform the mount modification <br />▪ Commscope, Metrosite, Perfect Vision, Sabre, and Site Pro have all agreed to <br />support Verizon vendors with the necessary material certifications <br />o If seeking permission to use an equivalent <br />▪ It is required that the SMART Tool engineering vendor approval of such is <br />included in the contractor submission package. There may be an additional <br />charge for approval if the equivalent submission doesn’t meet specifications as <br />prescribed in the drawings. <br /> <br />☐ All hardware has been properly installed, and the existing hardware was inspected. <br /> <br />☐ The material utilized was as specified on the SMART Tool engineering vendor Mount Modification <br />Drawings and included in the material certification folder is a packing list or invoice for these materials. <br /> <br />OR <br /> <br />☐ The material utilized was approved by a SMART Tool engineering vendor as an “equivalent” and this <br />approval is included as part of the contractor submission. <br /> <br />Antenna & Equipment Placement and Geometry Confirmation: <br /> <br />☐ The contractor certifies that the photos support and the equipment on the mount is as depicted on <br />the sketch and table included in this form and with the mount analysis provided. <br /> <br />2210 3%4 S Ritchey St # <br />WCC018/5/2024