My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2309 W Laramore Ln and Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
L
>
Laramore Ln
>
2309 W Laramore Ln
>
2309 W Laramore Ln and Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:33:09 AM
Creation date
6/5/2025 7:33:00 AM
Metadata
Fields
Template:
Plan
Permit Number
101120243
101120244
Full Address
2309 W Laramore Ln
2309 W Laramore Ln Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TMC ENGINEERS INC. <br />Geotechnical, Structural and Civil Engineering <br />Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com <br /> <br />Page 18 <br /> <br /> <br />APPENDIX A FIELD INVESTIGATION <br />Subsurface conditions were explored by drilling hand auger boring to a maximum depth of 5 feet at <br />approximate locations shown on the enclosed Site Plan. Upon completion of excavating, the boreholes <br />were backfilled with onsite soils that were removed from the excavations. <br />The drilling of the test boring was supervised by a geotechnical engineer, who continuously logged the <br />borings and visually classified the soils in accordance with the Unified Soil Classification System.
The URL can be used to link to this page
Your browser does not support the video tag.