Laserfiche WebLink
BY: <br />TABLE 2304.10.1 <br />- NAILING SCHEDULE <br />CONNECTION <br />NAILING <br />1. <br />Joist to sill or girder, toe nail <br />3-8d <br />2. <br />Bridging to joist, toenail each end <br />2-8d <br />3. <br />1" x 6" (25mm x 152mm) subfloor or less to each joist, face nail <br />2-8d <br />4. <br />Wider than 1" x 6" (25mm x 152mm) subfloor or less to each joist, fa <br />nail <br />3-8d <br />5. <br />2" (51 mm) subfloor to joist or girder, blind and face nail <br />2-16d <br />6. <br />Sole plate to joist or blocking, typical face nail <br />16d at 16" (406mm) OC. <br />Sole plate to joist or blocking, at braced wall panels <br />3-16d per 16" (406mm) <br />7. <br />Top plate to stud, end nail <br />2-16d <br />8. <br />Stud to sole plate <br />4-8d, toenail or 2-16d, end nail <br />16 m) <br />9. <br />Double studs, face nail <br />10. <br />Doubled top plates, typical face nail <br />1 a0 ) <br />Double top plates, lap splice <br />8- <br />Zat-9-7(152mm,) <br />11. <br />Blocking between joists or rafters to top plate, toenail <br />3 <br />12. <br />Rim joist to top plate, toenail <br />8d <br />13. <br />Top plates, laps and intersections face nail <br />2-16d <br />14. <br />Continuous header, two pieces <br />16d at 16" (406mm) OC. along each edge <br />15. <br />Ceiling joists to plate, toenail <br />3-8d <br />16. <br />Continuous header to stud, toenail <br />4-8d <br />17. <br />Ceiling joists, laps over partitions, face nail <br />3-16d <br />18. <br />Ceiling joists to parallel rafters, face nail <br />3-16d <br />19. <br />Rafter to plate, toenail <br />3-8d <br />20. <br />1" (25mm) brace to each stud and plate, face nail <br />2-8d <br />21. <br />1" x 8" (25mm x 203mm) sheathing or less to each bearing, face nail <br />2-8d <br />22. <br />Wider than 1 x 8 25mm x 203mm) sheathing to each bearing, face <br />it <br />3-8d <br />23. <br />Built-up corner studs <br />16d at 24" (610mm) OC. <br />24. <br />Built-up girder and beams <br />20d at 32" (813mm) OC. at top and bottom <br />and staggered 2-20d at ends and at each splice <br />25. <br />2" (51mm) planks <br />2-16d t ea bearin <br />26. <br />Wood structural panels and particleboard2 <br />Subfloor and wall sheathing (to fr <br />ming <br />1/2" (12.7mm) and less <br />6d3 <br />19/32" - 3/4" (15mm - 19mm) <br />8d 4 or6d 3 <br />7/8" - 1" (22mm - 25mm) <br />03 <br />1 1 /8" - 1 1 /4" (29mm - 32mm) <br />1 Od or8d 5 <br />Combination subfloor-underlaymen <br />(to framing): <br />3/4" (19mm) and less <br />6d 5 <br />7/8" - 1" (22mm - 25mm) <br />8d5 <br />1 1 /8" - 1 1 /4" (29mm - 32mm) <br />1 Od 4 or8d 5 <br />27. <br />Panel siding (to framing)? <br />1/2" (12.7mm) or less <br />6 <br />5/8" (16mm) <br />8d6 <br />28. <br />Fiberboard sheathing:7 <br />1/2" (12.7mm) <br />No. 11 ga.8 <br />1/2" (12.7mm) <br />6d4 <br />1/2" (12.7mm) <br />No. 16 ga9 <br />25/32" (20mm) <br />No. 11 ga.8 <br />25/32" (20mm) <br />8d 4 <br />25/32" (20mm) <br />No. 16 ga9 <br />29. <br />Interior paneling: <br />1/4" (6.4mm) <br />4d10 <br />3/8" (9.5mm) <br />6d 11 <br />(SEE CBC TABLE 2304.10.1 FOR NOTES) <br />N OTES: <br />1. All nailing shall be COMMON NAILS <br />2. Maximum stud spacing shall be 16". <br />3. All panel edges shall be blocked. <br />4. Framing member shall include sill plates and all framing <br />members receiving edge nailing <br />from abutting panels. <br />5. Nailing on 3x members shall be staggered. <br />6. 3"x3"0.229" plate washers shall be used with all anchor <br />bolts. CBC 2308.12.8. <br />7. At existing footing use 5/8" AB. Redheads OR Epoxy <br />to meet required anchor bolt spacing. <br />8. Second figure indicates where shear wall sheathing is <br />to be applied to BOTH sides of wall. <br />MATERIALS <br />( concrete <br />C. FOR STEM <br />24" OC. <br />STRUCTURE <br />15 <br />f°c>2,500 psi <br />LONGER THAN <br />p!sTRErFLE <br />AR <br />SPECTION) <br />PROVIDE #4 VERTICAL BARS <br />G E B. <br />A. FRAMING MEMBERS: DOUGLAS FIR LARCH <br />B. COLUMNS, BEAMS, HEADERS, AND PLATES: NO. 1 <br />C. STUDS, JOISTS, RAFTERS, BLOCKINGS: NO. 2 <br />D. WALL SILLS, NAILERS, AND LEDGERS IN CONTACT WITH CONCRETE: <br />PRESERVATIVE TREATED DOUGLAS FIR <br />E. FRAMING CONNECTION HARDWARE: AS MANUFACTURED BY SIMPSON <br />STRONGTIE CO. OR APPROVED EQUIVALENTS. SIMPSON DESIGNATIONS <br />USED. USE NAILS PER ICBO APPROVAL AND AS RECOMMENDED BY <br />SIMPSON FOR EACH DEVICE. <br />F. COMMON NAILS, UNLESS OTHERWISE NOTED. ALL NAILING TO BE PER <br />CBC TABLE 2304.10.1, UNLESS OTHERWISE NOTED. <br />G. WOOD STRUCTURE PANELS SHALL COMPLY WITH (PS1-95) OR (PS2-92) <br />EXPOSED TO WEATHER <br />A. ALL EXPOSED STEEL MEMBERS SHALL BE COATED WITH A ZINC RICH <br />PRIMER. <br />B. ALL EXTERIOR HANGERS AND OTHER SIMPSON TYPE PRODUCTS <br />SHALL BE GALVANIZED. <br />C. ALL PLYWOOD SHALL BE OF AN EXP. 1 GRADE. <br />F MI • <br />. DOU FL R JOISTS REQUIRED UNDER PARALLEL BEARING <br />TIONS. <br />2. APPLY CONT. LINE OF GLUE TO FLOOR PANELS AT ALL JOISTS. <br />3. BLOCKINGS ARE REQUIRED AT ALL SHEARWALL PANEL EDGES. <br />4. CONSTRUCT OF PLYWOOD SHEARWALL SHALL BE WITH COMMON <br />NAILS ONLY. <br />5. HOLDDOWN BOLT HOLES AT EACH END OF THE PLYWOOD <br />SHEARWALLS SHALL HAVE TOLERANCE OF NO MORE THAN 1/16". <br />6. ALL POSTS WITH HOLDDOWNS OR UPLIFT STRAPS SHALL HAVE <br />CONTINUOUS EDGE NAILING. <br />7. ANCHOR BOLTS SHALL BE MIN. 5/8" DIA., 7" EMB. INTO CONCRETE, @ 4' <br />OC U.O.N. ON SHEARWALL SCHEDULE, 12" FROM ENDS, 2 MINIMUM PER <br />PLATE, AND WITH 3"x3"xO.229" STEEL PLATE WASHERS. BOLTS SHALL <br />EXTEND 5" INTO FOOTING ON TWO POUR SYSTEM (EXTRA LONG BOLTS). <br />PROVIDE MINIMUM EDGE DISTANCE OF 1 7/8" FOR THE 5/8" DIA. ANCHOR <br />BOLTS. <br />8. POWER DRIVEN PINS ARE NOT PERMITTED AT FOUNDATIONS. <br />HORIZONTAL PLYWOOD SHEATHING: <br />1. ROOF DIAPHRAGM: 1/2" C-D EXTERIOR APA RATED 32/16, 8d ® 6" <br />PANEL EDGES & 12" @ INTERMEDIATE. <br />ALL EDGES, 10d @ 6" @ PANEL EDGES & 12" @ INTERMEDIATE. <br />3. VERTICAL PLYWOOD SHEATHING: SEE SCHEDULE. <br />EXTERIOR STUCCO NOTES: <br />1. STUCCO LATH AND DRYWALL SHALL BE NAILED TO ALL STUDS AND TO <br />TOP AND BOTTOM PLATES. <br />2. USE 2 LAYERS OF GRADE D FELT BACKING WHEN STUCCO IS APPLIED OVER PLYWOOD. <br />CONCRETE <br />1. The minimum compressive strength of concrete shall be f'c 3000 psi 28 days <br />unless otherwise noted, water -cement ratio of 0.45, type V c <br />2• Aggregates shall conform to A.S.T.M. C33 <br />3. Ready -mixed concrete shall be in accordance with requirements of ASTM C94. <br />4. Maximum slump shall be 5" unless noted otherwise. <br />5. Concrete shall be maintained moist a minimum of 10 days after placement. <br />6. Prior to placing concrete, reinforcing steel and embedded items shall well secured <br />in proper positions. <br />7. Use type II or V cement as required against sulfate attack. <br />8. All bolt holes shall be drilled 1/32" to 1/16" oversized. <br />9. Hold-downs shall be re -tightened just prior to cover the wall framing. <br />STRUCT= MOT77 &s <br />GENERAL NOTES <br />1. All work shall comply with the r ents of the 2022 California Building Codes arc' aii amendment <br />and local, county, state and fed gulations. <br />2. The contractor is responsible for inating the work of all trades and shall check all dimensions and <br />isti s prior Wing of contract. All discrepancies shall be called to the attention <br />FGe <br />e En ' olved in writing before procceding with the work. <br />t etails apply to all parts of the job except where tlh�y are in conflict wi..i <br />n docur ;the more strict condition applies subject to engine r. <br />l tion shown pla tive to existing condition were corefull, taken in ti aut withe, l <br />guar racy. onditions are in conflict with the plan, thay sl eported to tie <br />engineer proper s be made. <br />5. Required shop drawings shall be submitted to the eingineer and the Building Departirr i for review. <br />6. Modification of structural plans and material substitutions shall not be done without written approval of tha <br />en ineer. <br />7. approv lans and specifications r resent the finish structureR <br />e the mothods of <br />10 he forIrc <br />u nance <br />e�w2�jc a <br />n c eth nc- i► cedu but nohoring, <br />c fe ng, ctpy cc Obs athe en shall not be <br />ns s sp on s a t he e.fer h oIs, t <br />1 All structural lumber shall comply with DOC PS20, be Douglas Fir Larch of the following miniumum grades: <br />x framing incl g plates and studs No. 2 <br />b. b nd rs 4x1 No. 1 <br />C. rger th 4x and s No. 1 <br />d. x er ms No. 1 <br />e. 00 oist ov ara to be D.F No. 1 <br />2, re paall be gl nfding to U.S. Product Standard DOC PSi or DOC PS2, <br />with exterior grade and shall bear the stamp of an approved fabricator."' <br />3. Installation of vertical and horizontal sheathing shall first be approved by the inspector prior to cev <br />4. No structural member shall be cut or notched unless specifically shown on approved plans. <br />5. Maximum moisture content of all mumber shall be 19%. <br />6. Bolt holes to be nominal diameter of blot plus 1/16 inch unless noted otherwise. Provide washers �r <br />head an nuts of bolts and lag screws. <br />7. Framing connections shall be "Simpson Strong -Tie". <br />8. The number of nails connecting lumber shall not be less than the minimum required on CBC Table 2304.10.1. <br />9. All nails used on structural panels shall be common nails. <br />10. Provide continuous edge support along top and bottom of 2x14 joists. <br />11. Built-up framing members shall be connected as follows: <br />a. 2-2x 16d at 12" o.c. staggered top and bottom. <br />c. 4-2x 5/8" dia. M.B. at 18" o.c. staggered top and bottom. <br />12. Provide double joists under parallel partitions. <br />13, Provide solid blocking under all non -parallel partitions. <br />14. Install lag bolts by drilling lead hole 65% to 75% of shank diameter and full diameter for shank portion. <br />14. Use soap or other approved lubricant on threads. Installation shall be by tightening of screw not by <br />hammering. <br />16. Truss Joists shop drawings shall be provided by the supplier and submitted to the Buliding Department for <br />approval prior to fabrication. Shop drawings shall be stamped and wet signed by a licensed engineer. <br />GLULAM ,PARALLAM,MICROLAM BEAMS <br />1. Glue laminated beam s shall be per American Institute of Timber <br />construction 117. conbination symbols shall be as follows: <br />a) 24F-V4 DF/DF for simple beams <br />b) 24F-V8 DF/DF for cantilevered beams <br />2. Parallom beams shall be 2.0E PSL, ICC # ESR-1387 <br />3. Microlam beams shall be 2.OE LVL <br />4. Laminated beams shall be fabricated by a licensed fabricator and shall be accompanied to th job <br />site with certificate of fabrication. <br />5. Shop drawings shall be submitted to the architect or engineer for review prior to fabrication. <br />STRUCTURAL AND MISCELLANEOUS STEEL <br />1. All structural and miscellaneous steel shall conform to A.S.T.M. A-36 and shall be fabricated and <br />erected in accordance with the A.I.S.C. specifications for the design, fabrication and Erection of <br />structural Steel for building, latest edition. <br />2. Pipe collumns shall conform to A.S.T.M. A-53 grade B. <br />3. Tubular steel shall conform to A.S.T.M. A500 grade B. <br />4. Bolts shall conform to A.S.T.M. A-307 unless noted otherwise. <br />5. Shop drawing shall be submitted to the architect and engineer and building department for <br />6. Fabrication shall be done in the shop of licensed fabricators. <br />7. Used electric arc process welding with E70XX electrodes. <br />8. All welding shall be done in the shop of licensed fabricator or provide continuous special <br />inspection by a resgistered Deputy inpector. <br />9. Where a fillet weld sysbol is used in the plans without indication of size, the minimum weld size <br />as specified in the A.I.S.C. Manual of steel Construction shall be used. <br />FOUNDATION <br />1. Foun 'o av be d sig d in Ilo ble soil ear' g a a 't 1 00 si, using <br />Soil Report per ormed by C ENGIN ERS INC. <br />Proj. No. GE0250124SANG, dated Se tmber 23rd, 2024 <br />2. Foundation design is based on non -expansive soil. If found that soil expansive so that footings are <br />redesigned prior to pouring of concrete foundations. <br />3. Existing foundations are assumed to be in good condition. Contractor shall notify the engineer of <br />any foundation with significant settlement, severe cracking or any indication of <br />structural failure or distress or defect. <br />4. The contractor shall be be responsible for shoring, fence enclosures and protection life and property <br />until the project is complete. <br />5. A diligent search shall be conducted by the soil engineer and grading or general contractor to <br />locate cesspools, septic tank etc, if found, proper abandonment procedure shall be conduct as <br />directed by the soils engineer. Abandonment and/or compaction report shall be submitted to the <br />City building Department and engineer report. <br />REINFORCING STEEL <br />1. Reinforcing steel shall be deformed bars conforming to the requirements of A.S.T.M. A-615 <br />grade 60 for bars larger than #4, gr.40 for #4 or smaller. <br />Welded wire fabric shall conform to A.S.T.M. A-82 and A-185 . Lap 12 inches minimum. <br />2. Deltailing,fabrication and erection of reinforcing bars shall conform to the latest edition of A.C.I. <br />3. Manual of Standard Practice for Detailing and Reinforced Concrete Structures. <br />4. Minimum cover forcast in place concrete shall be as follows: <br />a. Poured again earth 3 inches <br />b. Poured again form below grade 2 inches <br />c. Formed slabs 3/4 inch <br />d. Slab on grade, top cover 1 inch <br />e. Column and Beam main bars 1-1/2 inches <br />f. Walls exposed to weather # 6 and larger 2 inches <br /># 5 and smaller 1-1/2 inches <br />5. Bars shall be clean of rust, grease and other deleterious material that may affect bond. <br />6. All bend shall be made cold. <br />7. Lap splice length shall be 40 bars diameters minimum and shall be staggered. <br />8. All reinforcing bars, embeds, anchor bolts, holdowns etc. shall be secured in place prior to placement of <br />concrete. <br />9. Code required inspections by juristdiction authority shall be made an signed off prior to placement of <br />concrete. <br />FICRTION <br />S-1 <br />STRUCTURAL GENERAL NOTES <br />S-2 <br />FOUNDA11ON & ROOF FRAMING PLANS (ADU) <br />SD-1 <br />STRUCTURAL DETAILS <br />DESIGN CRITERIA: <br />1. Floor Live Load = 40PSF <br />2. Roof Live Load = 20PSF <br />3. Soil Classification = D <br />4. Allowable Foundation Pressure = 1,500 PSF <br />5. Wind Design Data: <br />a) Basic Wind Speed = 110MPH <br />Occupancy Category = II <br />c) Wind Exposure = C <br />d) Internal Pressure Coefficient = 1.29 <br />6. Earthquake Design Data: <br />a) Seismic Important Factor, 1 = 1.0 <br />Occupancy Category = 11 <br />b) Mapped Ss = 1.346 <br />S1 = 0.478 <br />c) Site Class = D <br />d) Sds = 0.897 <br />Sd1 = Null <br />e) Seismic Design Category = D <br />f) Basic Seismic -force -resisting System = <br />Light -framed Wood Shearwalls <br />g) Design Base Shear: <br />Cs = 0.21 <br />R = 6.5 <br />h) Analysis Procedure: Simplified Design <br />SPECIAL INSPECTION IS REQUIRED FOR: <br />1. SHEARWALL NAILING FOR TYPE 2 AND ABOVE (<= 4" O.C.) <br />(Note: Deputy inspectors shall register with Building Department, <br />City of Santa Ana) <br />DEAD LOAD <br />LIVE LOAD <br />ROOF <br />12 PSF <br />20 PSF <br />FLOOR <br />S <br />4 S <br />FLAT CEILING <br />5 PSF <br />10 PSF <br />EXT. WALL <br />16 PSF <br />INT. WALL <br />8 PSF <br />M <br />Westin <br />Development Co. <br />License# 578613 <br />6091 E. Nugget Ct. <br />Anaheim Hills, CA 92807 <br />weatindevelopment®yahoo.com <br />Michael Qu <br />714-878-7430 <br />ENGINEERED BY: <br />Hiep T. Tran P.E. <br />2907 Ebbtide Rd. <br />Corona Del Mar, CA 92625 <br />Tel. (949) 353-7486 <br />w N0. 35 81 m <br />Oft Exp. 09/30/2025 <br />V 11. <br />OF CAL F <br />WW <br />A <br />W <br />O <br />x <br />� <br />A <br />i <br />z <br />W <br />� <br />�N <br />W <br />~ <br />elk <br />W <br />a <br />a <br />a, <br />O <br />O <br />� <br />� <br />Cd <br />0 <br />CC) <br />1-4 <br />t-4 <br />co <br />+- <br />� <br />M+1 <br />E-I <br />CO <br />C� <br />CO <br />� <br />CO <br />U� <br />Job: <br />Drawn By: <br />SH <br />Scale: <br />Date: <br />2/27/24 <br />Rev. <br />Date: <br />GENERAL NOTES <br />