My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2130 N Grand Ave - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
2130 N Grand Ave
>
2130 N Grand Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:34:34 AM
Creation date
6/5/2025 7:34:17 AM
Metadata
Fields
Template:
Plan
Permit Number
20182937
101119452
Full Address
2130 N Grand Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MLPE +- <br />MLPE <br />MLPE +- <br />MLPE <br />MLPE +- <br />MLPE <br />MLPE +- <br />MLPE <br />REVISION <br />REV DATE DESCRIPTION <br />A 9/11/2024 PERMIT PLANS <br />DATE: 9/11/2024 <br />DRAFTED BY: PRIYANGA <br />CHECKED BY: JOHN <br />NAME: VIETNAMESE ALLIANCE CHURCH OF ORANGE <br />PROJECT NO: 2308-02 <br />ADDRESS: 2130 N GRAND AVE, SANTA ANA, CA 92705. <br />COORDINATES: 33.764726, -117.852604 <br />APN: 396-191-44 <br />AHJ: CITY OF SANTA ANA <br />UTILITY: SCE <br />58.85kW DC (STC) SYSTEM, 55.16kW DC (PTC) VALUE, <br />50.00kW AC (NAMEPLATE) SYSTEM, 54.34 kW AC (CEC) VALUE <br />MODULES: (107) ZNSHINE SOLAR ZXM7-SHLD144-550W <br />INVERTER(S): (1) CHINT CPS SCA50KTL-DO/US-480 <br />MLPE: (56) AP SMART RSD-D-20 <br />PAGE NO: E-1.2 <br />PROJECT INFORMATIONSYSTEM INFORMATIONCONTRACTOR INFORMATION <br />THE INFORMATION CONTAINED IN THIS DRAWING IS PROPRIETARY AND <br />CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSES OF THIS <br />PROJECT. <br />ELECTRICAL <br />MOUNTING DETAILS <br />SCALE: NTS <br />GROUND LUG DETAILS CONDUIT BODY GROUNDING DETAILS CONDUIT WALL ANCHORING TYPICAL DURA-BLOCK CONDUIT SUPPORT DETAIL <br />LAYS IN LUGS ATTACHED USING <br />THE FOLLOWING STAINLESS <br />STEEL HARDWARE <br />BOLT:1"L, #10-32,5/16" HEX <br />HEAD <br />NUT: #10,5/16" HEX HEAD <br />WASHERS: STAR WASHER ON <br />EACH SIDE <br />BOLT WITH SERRATED <br />NUT OR STAR LOCK <br />WASHER <br />PV MODULE OR <br />RACKING <br />BARE TINNED COPPER <br />WIRE CONNECTION <br />SIZED PER NEC TABLE <br />250.122 <br />TIN PLATED COPPER LUG , <br />LAY IN TYPE RATED FOR <br />DIRECT BURIAL ILSCO <br />CBL-4DBT OR EQUIV LOCK NUT <br />CONDUIT <br />COMPRESSION <br />STRING <br />ENCLOSURE WALL <br />REPRESENTIVE <br />CONDUCTORS <br />CONTINUOUS <br />GROUND STRIP <br />INSULATION AT <br />LUG <br />GROUND BUSHING WITH <br />LAY IN LUG <br />ELECTRICAL CONDUIT <br /> CONDUIT STRAP <br />ELECTRICAL CONDUIT ROUTED <br />HORIZONTALLY OR VERTICALLY ON <br />1-5/18" UNISTRUT CHANNEL <br />ANCHORED TO STRUCTURE USING <br />FASTENER SPECIFICALLY INTENDED <br />FOR THE WALL <br />BUILDING WALL <br />ROOF <br />ELECTRICAL <br />CONDUIT <br />DURA <br />BLOCK <br />ROOF TOP <br />SUPPORT AT <br />EVERY 10'-0' <br />OF CODUIT <br />SLIP SHEET <br />GROUNDING - SEE ELECTRICAL DIAGRAM AND ELECTRICAL DETAILS <br />FOR MORE GROUNDING INFORMATION: <br />1.ONLY ONE CONNECTION TO DC CIRCUITS AND AC CIRCUITS WILL BE <br />USED FOR SYSTEM GROUNDING (REFERENCED TO THE SAME POINT). <br />2.EQUIPMENT GROUNDING CONDUCTORS AND SYSTEM GROUNDING <br />ELECTRODE CONDUCTORS WILL HAVE AS SHORT A DISTANCE TO THE <br />GROUNDING CONNECTION POINT AS PRACTICABLE AND A MINIMUM <br />NUMBER OF TURNS. <br />3.TO ENSURE PROPER GROUNDING, NON-CURRENT CARRYING METAL <br />PARTS SHALL BE INSTALLED, NOTING THAT PAINT AND FINISH SHALL BE <br />PROPERLY REMOVED WHERE IT MAY INSULATE AN ENCLOSURES BONDING <br />CONNECTION.APPLY NO-LOX OR OTHER SIMILAR ANTI-OXIDANT <br />COMPOUND TO EXPOSED SURFACES. <br />4.THE CONNECTION TO THE MODULE OF THE PROPOSED SOLAR ELECTRIC <br />SYSTEM SHALL BE SO ARRANGED THAT REMOVAL OF A MODULE FROM THE <br />PHOTOVOLTAIC SOURCE CIRCUIT DOES NOT INTERRUPT A GROUND TO <br />ANOTHER PHOTOVOLTAIC SOURCE CIRCUIT. <br />5.GROUNDING SYSTEM COMPONENTS SHALL BE APPROVED FOR THEIR <br />PURPOSE, INCLUDING BUT NOT LIMITED TO GROUND RODS, GROUNDING <br />LUGS, GROUNDING CLAMPS, ETC. GROUNDING DEVICES EXPOSED TO THE <br />ENVIRONMENT SHALL BE RATED FOR DIRECT BURIAL. <br />6.UNDERGROUND OR INACCESSIBLE CONNECTIONS OF GROUNDING <br />CONDUCTORS SHALL ONLY BE MADE VIA EXO-THERMIC WELDS. THE USE <br />OF MECHANICAL CONNECTIONS ARE ACCEPTABLE FOR ACCESSIBLE ABOVE <br />GROUND LOCATIONS. <br />7.ALL METALLIC CONDUITS SHALL BE INSTALLED AND TERMINATED WITH <br />INSULATED GROUND BUSHINGS. <br />NOTE: DETAIL DRAWINGS ARE FOR REFERENCE ONLY <br />ELECTRICAL MOUNTING DETAILS: <br />STRINGING WIRING <br />PV MODULE <br />2-TO-1 MLPE WITH MODULES WIRED IN <br />SERIES. MOUNT CENTERED BETWEEN <br />MODULE J-BOXES. REFER TO <br />INSTALLATION MANUAL FOR BONDING <br />INTER-ROW WIRING <br />ROUTED THROUGH 1.25" <br />EMT OR FLEX CONDUIT <br />WITH CONDUIT <br />BUSHINGS, SECURE <br />CONDUIT TO RACKING <br />LOOP WIRES AS <br />NECESSARY. LOOP <br />DIAMETER TO BE <br />3" OR LARGER <br />CONNECTOR <br />PV MODULE LEADS MLPE LEADS <br />WIRES CLIPS MOUNTED ON THE MODULE <br />FRAME OR RACKING RAIL. POSITION CLIPS <br />TO REMOVE SLACK FROM THE WIRE AND <br />KEEP CONNECTOR AND WIRING UP AGAINST <br />THE MODULE. DO NOT OVERSTRESS THE <br />WIRING AND CONNECTORS BY PULLING TOO <br />TIGHT. <br />2130 N Grand Ave <br />10/1/2024
The URL can be used to link to this page
Your browser does not support the video tag.