My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
209 N Bewley St & Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bewley St
>
209 N Bewley St
>
209 N Bewley St & Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:34:33 AM
Creation date
6/5/2025 7:34:17 AM
Metadata
Fields
Template:
Plan
Permit Number
101119477
101119478
Full Address
209 N Bewley St
209 N Bewley St Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 10 <br /> <br /> <br />Geotechnical Review of Grading and Foundation Plans <br /> <br />Based on the City’s requirements, the project geotechnical consultant should review, <br />“approve” and sign the project grading and foundation plans with details/specifications, if <br />any, indicating conformation to applicable geotechnical recommendations. <br /> <br />We will corporate with the civil/structural design engineers who prepare the plans to <br />ensure our geotechnical recommendations are properly incorporated into the plans. <br /> <br />Geotechnical Observation and Testing During Construction <br /> <br />We recommend that a qualified geotechnical consultant be retained to provide <br />geotechnical engineering services, including geotechnical observation/testing, during the <br />construction phase of the project. This is to verify the compliance with the design, <br />specifications and/or recommendations, and to allow design changes in the event that <br />subsurface conditions differ from those anticipated. <br /> <br />Geotechnical observation/testing can be performed at the following stages: <br /> <br /> During ANY grading operations, including excavation, removal, filling and <br />backfilling, etc. <br /> During and after excavation for footings to verify the adequacy of underlying <br />materials. <br /> After pre-saturation of slab subgrade earth materials, if any, prior to pouring <br />concrete. <br /> After compaction of subgrade soils and/or aggregate base for exterior slabs and or <br />driveway, if any. <br /> During backfill of drainage and utility line trenches, if any, to verify proper <br />compaction. <br /> When/If any unusual geotechnical conditions are encountered. <br /> <br />Note: If Geotechnical International is not provided the opportunity to perform the <br />geotechnical observation/testing during the construction phase, Geotechnical <br />International will take no responsibility for the conclusions and recommendations <br />contained in our report in the event that subsurface conditions differ from those <br />interpreted and anticipated during our preliminary investigation phase prior to the start of <br />construction. <br /> <br />CLOSURE <br /> <br />The conclusion and recommendations contained in this report are presented based on <br />geotechnical data as described herein which are believed representative of the total <br />project area. However, earth materials can vary in characteristics, both laterally and <br />vertically, and those variations could affect the conclusions and recommendations <br />contained herein. As such, observation and testing by a qualified geotechnical consultant <br />209 N Bewley St <br />Unit# 211/13/2024
The URL can be used to link to this page
Your browser does not support the video tag.