Laserfiche WebLink
INDEX <br />A1 <br />A2 SITE PLAN <br />S102'8/($1'%$//$67/$<287 <br />E 1a SINGLE LINE DIAGRAM <br />E2 PLACARD <br />E3 LABELS <br />SOLAR PROPERTY PLAN <br />PROJECT INFORMATION <br /> ALL WORK SHALL COMPLY WITH THE: <br /> 2022 CALIFORNIA BUILDING CODE (CBC) <br /> 2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br /> 2022 CALIFORNIA FIRE CODE (CFC) <br /> 2022 CALIFORNIA ELECTRICAL CODE (CEC) <br /> 2022 CALIFORNIA MECHANICAL CODE (CMC) <br /> 2022 CALIFORNIA PLUMBING CODE (CPC) <br /> 2022 CALIFORNIA ENERGY CODE (CEnC) <br /> 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC) <br /> 2023 COUNTY OF LOS ANGELES FIRE CODE <br /> ALL OTHER ORDINANCES ADOPTED BY THE LOCAL GOVERNING AGENCIES <br />SCOPE OF WORK <br />VICINITY MAP <br />AERIAL MAP <br />1. 1.ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NEC (NATIONAL ELECTRIC CODE), NFPA <br />(NATIONAL FIRE PROTECTION ASSOCIATION), AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES, LAWS AND REGULATIONS. <br />2. 2.ALL WORK SHALL CONFIRM TO APPLICABLE STATE AND FEDERAL SAFETY CODES INCLUDING OSHA AND CAL OSHA. NO "HOT" WORK IS AUTHORIZED. ALL "HOT" <br />WORK SHALL BE APPROVED IN WRITING WITH THE GENERAL CONTRACTOR AND OWNER. <br />3. COORDINATE ALL WORK WITH ARCHITECTURAL, MECHANICAL AND STRUCTURAL DRAWINGS, INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND <br />STRUTURAL MEMBERS. NO ITEM SUCH AS A PIPE, DUCT, ETC. SHALL BE IN CONTACT WITH ANY ELECTRICAL EQUIPMENT. <br />4. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, <br />INCLUDING SAFETY OF ALL PERSONS AND PROPERTY AND SECURITY OF THE WORKSITE. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO <br />NORMAL WORKING HOURS. <br />5. NOTIFY THE PRIME CONTRACTOR OR OWNER IMMEDIATELY AFTER DISCOVERING ANY HAZARDOUS MATERIAL. <br />6. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED. VERIFY THE EXACT LOCATIONS AND CONDITIONS OF <br />ALL EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS PRIOR TO ANY WORK. LOCATIONS FOR EQUIPMENT SHALL BE TAKEN FROM THE OTHER SHEETS WHERE THEY <br />OCCUR. EXTEND WIRING FROM ALL JUNCTION BOXES, CONTROL PANELS, PUMPS, RECEPTACLES, SWITCHES, ETC. AND MAKE ALL FINAL CONNECTIONS TO THE <br />EQUIPMENT AS REQUIRED. <br />7. THE INTENT OF THESE DRAWINGS IS FOR A COMPLETE ELECTRICAL SYSTEM. ANY ERRORS OR UNCERTAINTY SHALL BE BROUGHT TO THE ATTENTION OF THE PRIME <br />CONTRACTOR AND ENGINEER AS SOON AS FOUND. <br />8. THE COMPLETE ELECTRICAL INSTALLATION SHALL BE TESTED AS A COMPLETE WORKING SYSTEM. <br />9. RESTORE ALL DAMAGES RESULTING FROM WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN FINISHED WITH <br />10.FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED SURFACES. <br />11.ALL NEW CIRCUIT BREAKERS SHALL BE RATED 10,000 AIC OR HIGHER <br />12.ALL CONDUITS SHALL BE EMT, INTERMEDIATE METAL CONDUIT, OR RIGID STEEL. MINIMUM SIZE SHALL BE 1/2". ALL CONDUIT, BOXES, AND ELECTRICAL FITTINGS SHALL BE <br />STEEL. <br />13.DO NOT USE THE WORKING SPACE WITHIN ANY EXIT SIGN OR ASSOCIATED JUNCTION BOX FOR ANY OTHER CIRCUIT. <br />14.PROVIDE EXPANSION AND DEFLECTION FITTINGS IN CONDUITS CROSSING BUILDING EXPANSION AND SEISMIC JOINTS. <br />15.PROVIDE JUNCTION AND/OR PULL BOXES WHEN NECESSARY OR REQUIRED BY NEC. <br />16.ALL CONDUCTORS SHALL BE COPPER, THHN, #12 AWG MINIMUM. UNLESS IN A WET LOCATION IN WHICH CASE THEN SHALL BE USED. <br />17.INSTALL GREEN INSULATED GROUND WIRE IN ALL CIRCUITS. SIZE PER NEC REQUIREMENTS OR THE SAME AS PHASE CONDUCTORS, WHICHEVER IS LARGER. UNLESS <br />INDICATED OTHERWISE. <br />18.ALL NEW WIRING, CONDUIT, AND JUNCTION BOXES SHALL BE CONCEALED WITHIN NEW WALLS, CEILINGS OR FLOOR SPACES. SURFACE MOUNT CONDUIT ON OLD <br />WALLS AND CEILINGS. RUN ALL SURFACE RACEWAY TIGHT TO THE STRUCTURE, PARALLEL TO BUILDING LINES. <br />19.NO FOREIGN EQUIPMENT SHALL BE LOCATED WITHIN THE SPACE ABOVE OR BELOW THE ELECTRIC PANELS. <br />20.PROVIDE SIGNAGE ON ALL ELECTRIC PANELS TO KEEP THE SPACE 36" IN FRONT OF THE PANELS FREE OF OBSTRUCTIONS. <br />21.PROVIDE WARNING LABEL ON ALL PANELS "WARNING, ELECTRICAL ARC FLASH HAZARD, PERSONAL PROTECTION EQUIPMENT REQUIRED, FAILURE TO COMPLY CAN <br />RESULY IN INJURY OR DEATH, REFER TO NFPA 70E." WHERE THE TERMINAL OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A WARNING <br />SIGN SHALL BE MOUNTED ON OR ADJACENT TO THE DISCONNECTING MEANS. THE SIGN SHALL BE CLEARLY LEGIBLE AND HAVE THE FOLLOWING WORDS OR <br />EQUIVALENT: "WARNING - ELECTRIC SHOCK HAZARD, DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND THE LOAD SIDES MAY BE ENERGIZED IN THE OPEN <br />POSITION." <br />22.UPDATE PANEL BOARD DIRECTORY AS CIRCUITS ARE INSTALLED. PREPARE NEW TYPE WRITTEN PANEL SCHEDULES. <br />23.ALL EXTERIOR EQUIPMENT SHALL BE IN WEATHERPROOF (NEMA 3R) ENCLOSURES. ALL NEW WIRING SHALL BE IN CONDUIT, SUITABLE FOR SUN EXPOSURE AND WET <br />LOCATIONS. FIELD APPLIED COATINGS ARE NOT ACCEPTABLE. <br />24.DC SOLAR POWER SHALL BE NEGATIVELY GROUNDED. <br />25.ALL MARKING SHALL BE PER CODE REQUIREMENTS. <br />26.INVERTERS MUST COMPLY WITH UL 1741 TO PREVENT ISLANDING ON POWER FAILURE. THE INVERTERS SHALL NOT PUT POWER ON TO THE GRID IF THE GRID IS OFF-LINE. <br />INVERTERS ARE FULLY COMPLIANT WITH NEC 690.61 <br />27.NOTHING IN THESE PLANS SHALL BE CONSTUED TO CONTRADICT NEC, UL OR LOCAL CODES. <br />28.ALL SYSTEM COMPONENTS (MODULES AND INVERTERS ETC.) SHALL BE UL LISTED, UL2703 AND UL1703. <br />29.MOUNT TO ROOF USING UL APPROVED MOUNTING HARDWARE. FOLLOW MANUFACTURERS INSTALLATION MANUALS. <br />30.MARK THE NEC REQUIRED CLEAR SPACE ON THE FLOOR IN FRONT OF ALL DEVICES BEING INSTALLED. <br />31.SUPPORT ALL ROOF MOUNTED CONDUIT WITH FOAM "SLEEPERS" IN UL APPROVED SYSTEM. <br />32.PV MODULES SHALL NOT BE INSTALLED OVER ANY PLUMBING OR MECHANICAL VENTS, EXHAUSTS OR CHIMNEYS. <br />33.REMOVAL OF INVERTER, METER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUTCTOR <br />AND THE PHOTOVOTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. <br />34.ALL PV MODULES AND ASSOCIATED EQUIPMENT SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE AND ACCESS BY UNQUALIFIED PERSONS <br />35.UTILITY IS 480Y/277V 3 PHASE 4W. PV SYSTEM IS UTILITY INTERACTIVE. <br />36.SYSTEM CARRIES A "CLASS A" FIRE RATING. <br />37.ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2020 LOS ANGELES COUNTY ELECTRICAL CODE, 2019 CALIFORNIA ELECTRICAL CODE, 2017 NATIONAL ELECTRICAL <br />CODE, AND 2019 BUILDING ENERGY EFFICIENCY STANDARDS.”110.2 APPROVAL: ADD NOTE ON THE PLANS STATING “ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, <br />LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION <br />38.THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORS TO THE FARTHEST CONNECTED LOAD <br />OR OUTLET SHALL NOT EXCEED 5 PERCENT(ART. 130.5(c) ) <br />ELECTRICAL CONSTRUCTION GENERAL NOTES <br />6$55$</$<287 <br />CODE INFORMATION <br />PV PERMIT PACKAGE <br />2041 E WILSHIRE AVENUE, SANTA ANA, CA 92705 <br />190.12KW GRID TIED SOLAR PHOTOVOLTAIC SYSTEM <br />PROJECT NAME: FREUDENBERG-NOK <br />AIN: 402-111-39 <br />NUMBER OF STORIES: 2 <br />COMMERCIAL PROPERTY <br />CONSTRUCTION TYPE: V-N WITH AUTOMATIC FIRE SPRINKLERS <br />OCCUPANCY: TYPE B-2 MFG / WAREHOUSE <br />ROOF TYPE: 60MIL PVC <br />BUILDING CLEAR HEIGHT: 27FT <br />FIRE SPRINKLERS: YES <br />OCCUPANCY CLASSIFICATION: B, S-2, U <br />PROPERTY TYPE: COMMERCIAL/ INDUSTRIAL <br />SITE AREA: 68,999 SQ.FT <br />BUILDING AREA: 27,819 SQ.FT <br />EXISTING SERVICE - 3-PHASE, 4-WIRE, 480Y/277, 65KAIC <br />MAIN SERVICE BUS SIZE: 3000A <br />MAIN CIRCUIT BREAKER SIZE: 3000A <br />SECTION A: 2000A, SECTION B: 1000A, SECTION C: 1000A, SECTION D: 800A <br />MAIN SERVICE PANEL BRAND: CUTLER HAMMER <br />SUBMITTAL FOR CITY BUILDING AND ELECTRICAL REVIEW <br />SOLAR PHOTOVOLTAIC SYSTEM: THIS PROJECT ENTAILS THE INSTALLATION OF A PHOTOVOLTAIC <br />SYSTEM AT )5(8'(1%(5*. <br />WILL BE A NET ENERGY METERING. <br />THIS SYSTEM WILL BE INTERCONNECTED TO AND WILL BE OPERATED IN PARALLEL WITH THE <br />ELECTRIC GRID PER THE REQUIREMENTS OF <br />THE NATIONAL ELECTRICAL CODE AND UTILITY INTERCONNECT AGREEMENT. <br />CONDITIONS OF APPROVAL: <br />ALL CONSTRUCTION SHALL OCCUR BETWEEN THE HOURS OF 7AM & 6PM, EXCEPT FOR THE <br />PURPOSE OF EMERGENCIES <br />SOLAR (ROOF MOUNT): <br />(388) HANWHA Q CELLS Q.PEAK 490W MODULES <br />(3) STP CORE1-62-US (240V) STRING INVERTER <br />(132) AP SYSTEMS RAPID SHUTDOWN <br />SYSTEM SIZE (DC STC): 190.12KW <br />SYSTEM SIZE (AC CEC): 173.69KW <br />STORM WATER PREVENTION NOTES <br />STORM WATER POLLUTION PREVENTION DEVICES AND PRACTICES SHALL BE INSTALLED AND/OR INSTITUTED AS NECESSARY TO ENSURE COMPLIANCE WITH THE CITY WATER <br />QUALITY STANDARDS CONTAINED IN LOCAL REGULATIONS, FEDERAL REGULATIONS AND ANY EROSION CONTROL PLAN ASSOCIATED WITH THIS PROJECT. ALL SUCH DEVICES <br />AND PRACTICES SHALL BE MAINTAINED, INSPECTED AND/OR MONITORED TO ENSURE ADEQUACY AND PROPER FUNCTION THROUGHOUT THE DURATION <br />OF THE CONSTRUCTION PROJECT. <br />COMPLIANCE WITH THE WATER QUALITY STANDARDS AND ANY EROSION CONTROL PLAN ASSOCIATED WITH THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: <br />1.ALL POLLUTANTS SHALL BE RETAINED ON SITE UNTIL PROPERLY DISPOSED OF, AND MAY NOT BE TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, <br />NATURAL DRAINAGE COURSES OR WIND. <br />2.STOCKPILES OF CONSTRUCTION-RELATED MATERIALS SHALL BE PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY FORCES OF WIND OR WATER FLOW. <br />3.TRASH AND CONSTRUCTION SOLID WASTES SHALL BE DEPOSITED INTO COVERED RECEPTACLES TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND. <br />NOTE:ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2023 LOS ANGELES COUNTY ELECTRICAL CODE, 2022 CALIFORNIA ELECTRICAL CODE, 2022 CALIFORNIA ELECTRICAL <br />CODE, AND 2020 NATIONAL ELECTRICAL CODE. <br />NOTE: (110.2) ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFICATE BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED <br />STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION. <br />NOTE: 130.5(C) VOLTAGE DROP NOTE: THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORS TO THE <br />FARTHEST CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5 PERCENT. <br />T1 TITLE PAGE <br />SPACE FOR STAMP <br />S6758&785$/'(7$,/6 <br />DESIGNER <br />DATE <br />AHJ <br />UTILITY <br />MOUNTING SYSTEM <br />MODULE SCALE <br />CITY OF SANTA ANA <br />SCE <br />SOLLEGA RACKING SYSTEM <br />(388) HANWHA Q.PEAK 490W (Q.PEAK DUO XL-G10.3/BFG 490) <br />PROJECT ADDRESS <br />FREUDENBERG - NOK <br />2041 E WILSHIRE AVENUE <br />SANTA ANA, CA 92705 <br />RAHUL DISA <br />AS INDICATED <br />03-08-2024 <br />28476 WESTINGHOUSE PLACE, VALENCIA, CA 91355 <br />PHONE: (661) 294-9495 <br />CA LICENSE: #927678 (B, C-10, & C-39) <br />INVERTER <br />MARK FIGEARO <br />(3) STP CORE1-62-US (STP-62-US-41) (480V) STRING INVERTER <br />D(/&75,&$/DATASHEET <br />E 1b SINGLE LINE DIAGRAM <br />DESCRIPTION <br />190.12 KW (DC) PHOTOVOLTAIC SYSTEM <br />173.69 KW (CEC-AC) PHOTOVOLTAIC SYSTEM <br />PAGE NAME <br />7,7/(3$*( <br />PAGE NO. <br />7 <br />D6758&785$/DATASHEET <br />D6758&785$/DATASHEET <br />D6758&785$/DATASHEET <br />D6758&785$/DATASHEET <br />((/(&75,&$/(48,30(17 <br />S2STRUCTURAL DETAILS <br />S%8,/',1*(/(9$7,216 <br />Bldg# 101118991 <br />Elec# 20182594 <br /> <br />APPROVALS: <br />PLNG - ASevilla <br />BLDG - WLee <br />ELEC - MSmith <br />2041 E Wilshire Ave- <br />101118991 & 201825946/3/2024