My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2041 E Wilshire Ave- 101118991 & 20182594 - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Wilshire Ave
>
2041 E Wilshire Ave
>
2041 E Wilshire Ave- 101118991 & 20182594 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 9:37:03 AM
Creation date
6/5/2025 7:34:18 AM
Metadata
Fields
Template:
Plan
Permit Number
20182594
101118991
Full Address
2041 E Wilshire Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INSIDE THE BUILDING <br />Inverter <br />SMA <br />(E)MAIN SERVICE SWITCHGEAR <br />Roof Surface Line <br />Dura Block DB5 <br />Part #: 782051 50035 <br />INVERTER MOUNTED ON THE ROOFTOP <br />SCALE: NTS <br />The main component of the Ballast product is a polymeric “basket” that is clamped to PV modules and <br />ballasted to the roof top with concrete pavers. All other components are made of 300 series <br />stainless steel or 6000 series aluminum. The other major components are the pull clamp and <br />end clamp, which are sized to accommodate frame sizes (30 mm to 50 mm). The pull clamp <br />and end clamp are not part of the ground path. <br />Module to Module bonding is achieved with using FR-SBJ Slide on Bonding Jumper (UL2703 Listed) <br />Row to Row Bonding is achieved with UL2703 Listed Ground lugs and min of #6 Bare Copper EGC. <br />See detail Below. <br />END CLAMP <br />NOT A PART OF GROUND PATH <br />PULL CLAMP <br />NOT A PART OF GROUND PATH <br />END CLAMP <br />NOT A PART OF GROUND PATH <br />PULL CLAMP <br />NOT A PART OF <br />GROUND PATH <br />(N)AC <br />(N)PV LOAD CENTER DISCONNECT <br />SCALE: NTS <br />INSIDE THE BUILDING <br />ILSCO FR-SGB-4 <br />UL2703 LISTED <br />GROUND LUG <br />ATTACHED TO <br />MODULE FRAME <br />#6 BARE <br />COPPER EGC <br />FASTRACK 510 <br />POLYMERIC BASKET BALLST BLOCK <br />See Ground Lug Data Sheet and Racking Certification on page PV-8 <br />See Module Compatibility on page PV-8 SCALE: NTS <br />PV MODULE <br />PV MODULE <br />DESIGNER <br />DATE <br />AHJ <br />UTILITY <br />MOUNTING SYSTEM <br />MODULE SCALE <br />CITY OF SANTA ANA <br />SCE <br />SOLLEGA RACKING SYSTEM <br />(388) HANWHA Q.PEAK 490W (Q.PEAK DUO XL-G10.3/BFG 490) <br />RAHUL DISA <br />AS INDICATED <br />03-08-2024 <br />28476 WESTINGHOUSE PLACE, VALENCIA, CA 91355 <br />PHONE: (661) 294-9495 <br />CA LICENSE: #927678 (B, C-10, & C-39) <br />INVERTER <br />MARK FIGEARO <br />(3) STP CORE1-62-US (STP-62-US-41) (480V) STRING INVERTER <br />DESCRIPTION <br />190.12 KW (DC) PHOTOVOLTAIC SYSTEM <br />173.69 KW (CEC-AC) PHOTOVOLTAIC SYSTEM <br />PAGE NAME <br />(/(&75,&$/(48,30(17 <br />PAGE NO. <br />(1 <br />PROJECT ADDRESS <br />FREUDENBERG - NOK <br />2041 E WILSHIRE AVENUE <br />SANTA ANA, CA 92705 <br />2041 E Wilshire Ave- <br />101118991 & 201825946/3/2024
The URL can be used to link to this page
Your browser does not support the video tag.