Laserfiche WebLink
Dong Engineering Inc. <br />NEW MAIN HOUSE & ADU <br />1834 W.3RD ST, SANTA ANA, CA 92703 <br />Job #: 240051 <br />Date : 01/07/2025 <br />Plan : 1 <br />BEAM : 14 - FL AT JADU KITCHEN <br />Loads(Downward+) <br />Beam Weight 11.9 plf from 0 ft to 9.75 ft <br />Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 2 to 9.75 <br />Exterior Wall: (15)(9) = (DL=135PLF) form 2 to 9.75 <br />Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 2 to 9.75 <br />Floor Primary: (13+40)(1.2) = (DL=16.2PLF; LL=50PLF) form 11.75 to 9.75 <br />Reactions (D+Lr+L/Max. Load comb.) <br />Bearing Down Up <br />1 2599/2211 0 <br />2 3912/3322 0 <br />USE 3 1/2" x 11 7/8" LSL <br />Critcal Shear = -3094 LB @9.75' 1.5xV/(F'v x A)= 0.36 <br />F'v = 310, A = 41.56 <br />Critcal Moment = 7229 LB-FT @5' M/(F'b x S)= 0.45 <br />F'b = 2325, S = 82.26 <br /> Critical Deflection for TL = -0.171 INCH @ 5 L/240 = 0.488" <br /> Critical Deflection for LL = -0.091 INCH @ 5 L/360 = 0.325" <br />1 2 <br />Moment <br />Shear <br />Deflection <br />9.75' <br />BEAM : 15 - FL AT JADU LIVING <br />Loads(Downward+) <br />Beam Weight 11.9 plf from 0 ft to 13.5 ft <br />Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 13.5 <br />Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 2.75 to 13.5 <br />Exterior Wall: (15)(11) = (DL=165PLF) form 0 to 2.75 <br />Point load @ 2.75 : Load from beam 14 at Support 1(P1) <br />Point load from Panel P2(Left) of Line 1 at @ 2.75(P2*) <br />Reactions (D+Lr+L/Max. Load comb.) <br />Bearing Down Up Overstrength <br />1 3373/6049 0 6049 <br />2 1586/2080 0 2080 <br />USE 3 1/2" x 11 7/8" LSL <br /> Design with the seismic load effect with overstrength (Omega = 2.5) <br />Critcal Shear = 6048 LB @0' 1.5xV/(F'v x A)= 0.44 <br />F'v = 496, A = 41.56 <br />Critcal Moment = 15711 LB-FT @2.75' M/(F'b x S)= 0.61 <br />F'b = 3720, S = 82.26 <br /> Critical Deflection for TL = -0.402 INCH @ 6.23 L/240 = 0.675" <br /> Critical Deflection for LL = -0.217 INCH @ 6.23 L/360 = 0.45" <br />1 2 <br />P1P2* <br />Moment <br />Shear <br />Deflection <br />13.5' <br />Page 31 of 57 <br />1834 W Third St & <br />#2,33/21/2025