My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1834 W Third St & #2,3 - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Third St
>
1834 W Third St
>
1834 W Third St & #2,3 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:34:48 AM
Creation date
6/5/2025 7:34:24 AM
Metadata
Fields
Template:
Plan
Permit Number
101120601
101120602
101120603
Full Address
1834 W Third St
1834 W Third St Unit# 2
1834 W Third St Unit# 3
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dong Engineering Inc. <br />NEW MAIN HOUSE & JADU <br />1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703 <br />Job#: 240051 <br />Date: 7/17/2024 <br />PLAN: 1 <br />CODE: CBC 2022 <br />Shear Wall (X-X Direction) <br />Line Story Section Span Wind Seismic Added V (lb)H L v Type <br />###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) <br />A 2 1X 39 128 129 9 10.5 312 B <br />B 2 1X 39 128 129 9 10.5 312 B <br />C 1 1X 20.5 154 80 1502 1965 9 6.78 454 D <br />D 1 1X 49 154 80 1001 1310 9 11.72 407 C <br />E 1 1X 28.5 154 80 2502 3275 9 15.5 307 B <br />SUMMARY SHEAR WALL <br />V2 = Seismic*Span/2 + Added Vseismic <br />Line shear V = Maximum(V1;V2) <br />V1 = Wind*Span/2 + Added Vwind <br />v(plf) = V/L <br />Page 18 of 57 <br />1834 W Third St & <br />#2,33/21/2025
The URL can be used to link to this page
Your browser does not support the video tag.