Laserfiche WebLink
Dong Engineering Inc. <br />NEW MAIN HOUSE ADU <br />1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703 <br />Job#: 240051 <br />Date: 7/17/2024 <br />PLAN: 2 <br />CODE: CBC 2022 <br />Shear Wall (X-X Direction) <br />Line Story Section Span Wind Seismic Added V (lb)H L v Type <br />###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) <br />A 1 1X 19 86 113 9 8 175 A <br />B 1 1X 19 86 113 9 8 175 A <br />SUMMARY SHEAR WALL <br />V2 = Seismic*Span/2 + Added Vseismic <br />Line shear V = Maximum(V1;V2) <br />V1 = Wind*Span/2 + Added Vwind <br />v(plf) = V/L <br />Page 51 of 57 <br />1834 W Third St & <br />#2,33/21/2025