My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1834 W Third St & #2,3 - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Third St
>
1834 W Third St
>
1834 W Third St & #2,3 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:34:48 AM
Creation date
6/5/2025 7:34:24 AM
Metadata
Fields
Template:
Plan
Permit Number
101120601
101120602
101120603
Full Address
1834 W Third St
1834 W Third St Unit# 2
1834 W Third St Unit# 3
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E <br />Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 10 of 14) <br />Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x <br />Registration Number:Registration Date/Time: HERS Provider: <br />CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 <br />Schema Version: rev 20220901 <br />Report Generated: 2024-07-02 02:26:25 <br />OPAQUE SURFACE CONSTRUCTIONS <br />01 02 03 04 05 06 07 08 <br />Construction Name Surface Type Construction Type Framing Total Cavity <br />R-value <br />Interior / Exterior <br />Continuous <br />R-value <br />U-factor Assembly Layers <br />Attic RoofJADU Attic Roofs Wood Framed <br />Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078 <br />Roofing: Light Roof (Asphalt Shingle) <br />Roof Deck: Wood <br />Siding/sheathing/decking <br />Cavity / Frame: R-13.0 / 2x4 <br />Around Roof Joists: R-0.0 insul. <br />R-0 Roof Attic Ceilings (below <br />attic) <br />Wood Framed <br />Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4 <br />Inside Finish: Gypsum Board <br />R-30 + R-13 Roof Attic Ceilings (below <br />attic) <br />Wood Framed <br />Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032 <br />Over Ceiling Joists: R-20.9 insul. <br />Cavity / Frame: R-9.1 / 2x4 <br />Inside Finish: Gypsum Board <br />R-19 Floor No <br />Crawlspace Interior Floors Wood Framed Floor 2x10 @ 16 in. O. C.R-19 None / None 0.045 <br />Floor Surface: Carpeted <br />Floor Deck: Wood <br />Siding/sheathing/decking <br />Cavity / Frame: R-19 / 2x10 <br />Ceiling Below Finish: Gypsum Board <br />BUILDING ENVELOPE - HERS VERIFICATION <br />01 02 03 04 05 <br />Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50 <br />Required Not Required N/A n/a n/a <br />WATER HEATING SYSTEMS <br />01 02 03 04 05 06 07 08 09 <br />Name System Type Distribution Type Water Heater Name Number of Units Solar Heating <br />System <br />Compact <br />Distribution HERS Verification Water Heater <br />Name (#) <br />DHW Sys 1 Domestic Hot <br />Water (DHW)Standard DHW Heater 1 1 n/a None n/a DHW Heater 1 (1) <br />1834 W Third St & <br />#2,33/21/2025
The URL can be used to link to this page
Your browser does not support the video tag.