My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1011 W Second St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Second St
>
1011 W Second St
>
1011 W Second St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:15:26 PM
Creation date
6/5/2025 7:35:36 AM
Metadata
Fields
Template:
Plan
Permit Number
101120893
Full Address
1011 W Second St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project <br />1011 <br />Job Ref. <br />Section <br />LINE-A <br />Sheet no./rev. <br /> 4 <br />Calc. by <br />N.K <br />Date <br />15/11/2024 <br />Chk'd by Date App'd by Date <br />Load combination 2 <br />Shear force for maximum compression;V = 0.7 Eq = 1.535 kips <br />Axial force for maximum compression;P = ((D + Swt h) + 0.7 0.2 SDS (D + Swt h)) s / 2 + -1 0.7 Eq_ch1 <br />= 0.546 kips <br />Maximum compressive force in chord;C = V h / beff + P = 1.268 kips <br />Maximum applied compressive stress;fc = C / Ae = 103 lb/in2 <br />Design compressive stress;Fc' = Fc CD CMc Ctc CFc Ci CP = 552 lb/in2 <br />fc / Fc' = 0.187 <br />PASS - Design compressive stress exceeds maximum applied compressive stress <br />Design bearing compr. stress, bottom plate;Fc_perp' = Fc_perp CMc Ctc Ci Cb = 625 lb/in2 <br />fc / Fc_perp' = 0.166 <br />PASS - Design bearing compressive stress exceeds maximum applied bearing compressive stress <br />Chord capacity for chord 2 <br />Load combination 6 <br />Shear force for maximum tension;V = 0.7 Eq = 1.535 kips <br />Axial force for maximum tension;P = (0.6 (D + Swt h) - 0.7 0.2 SDS (D + Swt h)) b1 / 2 + -1 0.7 <br />Eq_ch2 = 0.305 kips <br />Maximum tensile force in chord;T = V h / beff - P = 0.417 kips <br />Maximum applied tensile stress;ft = T / Aen = 41 lb/in2 <br />Design tensile stress;Ft' = Ft CD CMt Ctt CFt Ci = 1380 lb/in2 <br />ft / Ft' = 0.030 <br />PASS - Design tensile stress exceeds maximum applied tensile stress <br />Load combination 2 <br />Shear force for maximum compression;V = 0.7 Eq = 1.535 kips <br />Axial force for maximum compression;P = ((D + Swt h) + 0.7 0.2 SDS (D + Swt h)) s / 2 + 0.7 Eq_ch2 = <br />0.504 kips <br />Maximum compressive force in chord;C = V h / beff + P = 1.226 kips <br />Maximum applied compressive stress;fc = C / Ae = 100 lb/in2 <br />Design compressive stress;Fc' = Fc CD CMc Ctc CFc Ci CP = 552 lb/in2 <br />fc / Fc' = 0.181 <br />PASS - Design compressive stress exceeds maximum applied compressive stress <br />Design bearing compr. stress, bottom plate;Fc_perp' = Fc_perp CMc Ctc Ci Cb = 625 lb/in2 <br />fc / Fc_perp' = 0.160 <br />PASS - Design bearing compressive stress exceeds maximum applied bearing compressive stress <br />Hold down force <br />Chord 1;T1 = 0.458 kips <br />Chord 2;T2 = 0.417 kips <br />Wind load deflection <br />Design shear force;Vw = fWserv W = 1.2 kips <br />Deflection limit;w_allow= h / 500 = 0.2 in <br />Induced unit shear;vw = Vw / b = 66.08 lb/ft <br />Anchor tension force;T = max(0 kips,vw h b / beff - 0.6 (D + Swt h) b / 2 + 0.6 <br />max(abs(W ch1),abs(W ch2))) = 0.000 kips <br />Page 49 of 108 <br />1011 W Second St <br />5/1/2025
The URL can be used to link to this page
Your browser does not support the video tag.