Laserfiche WebLink
THE KIANFARD ADU <br />PHOTOVOLTAIC SOLAR SYSTEM <br />SHEET INDEX <br />0-TITLE - TITLE SHEET <br />ARCHITECTURAL <br />PV0.0 - SITE PLAN <br />ELECTRICAL <br />E1.0 - ELECTRICAL PLOT PLAN <br />E1.1 - SINGLE LINE DIAGRAM <br />SIGNAGE <br />E1.2 - SIGNAGE <br />STRUCTURAL <br />S1.0 - TYP. CONNECTION DETAILS <br />1. EQUIPMENT USED SHALL BE NEW, UNLESS OTHERWISE <br />NOTED. <br />2. EQUIPMENT USED SHALL BE UL LISTED, UNLESS OTHERWISE <br />NOTED. <br />3. EQUIPMENT SHALL BE INSTALLED PROVIDING ADEQUATE <br />PHYSICAL WORKING SPACE AROUND THE EQUIPMENT AND <br />SHALL COMPLY WITH NEC. <br />4. COPPER CONDUCTORS SHALL BE USED AND SHALL HAVE <br />,168/$7,215$7,1*9ƒ&81/(6627+(5:,6(127(' <br />5. CONDUCTORS SHALL BE SIZED IN ACCORDANCE TO NEC. <br />CONDUCTORS AMPACITY SHALL BE DE-RATED FOR <br />TEMPERATURE INCREASE, CONDUIT FILL AND VOLTAGE <br />DROP. <br />6. EXPOSED NON-CURRENT CARRYING METAL PARTS SHALL BE <br />GROUNDED AS PER NEC. <br />7. LOAD SIDE INTER-CONNECTION SHALL COMPLY WITH NEC <br />8. ALL ELECTRICAL CONDUIT TO BE METAL CONDUIT <br />9. Panels Tested UL 1703 CLASS A TYPE 1 FIRE RATING <br />10. INVERTER UL 1741/ IEEE 1547 & CSA C-22.2 N.107.1-01 <br />"ALL CONDUIT SHALL BE PAINTED TO MATCH EXISTING <br />ROOF,TRIM AND/OR SIDING" <br />All shall be installed per manufacturer's installation instructions. <br />Ladders shall be OSHA approved and secured to the structure for inspection <br />purposes. <br />No part of this system encroaches above the Maximum Allowable Height of <br />the lot. <br />Per Zoning Code Section 3-31-3.B.1 all solar energy system <br />appurtenances such as, but not limited to, water tanks, supports, <br />and plumbing shall be screened to the maximum extent possible <br />without compromising the effectiveness of the solar collectors, <br />and shall be painted a color similar to the color of the surface <br />upon which they are mounted. Solar collectors are exempt from <br />the screening and color provisions of this subsection. <br />Per Zoning Code Section 3-31-3.B.2 the maximum height of a solar <br />collector shall not be no more than 2 feet, measured <br />perpendicular to the roof surface, and may not exceed the <br />maximum overall building height. <br />GENERAL ELECTRICAL NOTES CODE INFORMATION <br />HOME <br />OCCUPANCY GROUP <br />TYPE OF CONSTRUCTION <br />STORIES <br />SQ. FT. <br />x R-3 <br />x VB <br />x 1 <br />x )7ð <br />/27)7ð <br />ROOFING INFORMATION <br />EXISTING ROOF <br />RAFTER SIZE <br />RAFTER SPACING O.C. <br />RAFTER SPAN <br />WIND SPEED <br />EXPOSURE CATEGORY <br />x Concrete Tile <br />x 2"X4" <br />x 24" <br />x 8' <br />x 110 <br />x C <br />ARRAY INFORMATION <br />MODULE WEIGHT <br />MICRO-INVERTER WEIGHT <br />MODULE LENGTH <br />MODULE WIDTH <br />MODULE DEPTH <br />TOTAL MODULES/MICRO-INVERTERS <br />SUM: MODULE WEIGHT+OPTIMIZERs <br />SUM: MOUNTS AND RAIL WEIGHT <br />TOTAL INSTALLATION WEIGHT <br />TOTAL INSTALLATION AREA <br />DISTRIBUTED LOAD <br />x 49.61 LBS. <br />x 4 LBS. <br />x 77.01" <br />x 39.06" <br />x 1.38" <br />x 6/6 <br />x 321.66 LBS. <br />x 30 LBS. <br />x 351.66 LBS. <br />x 125.33 )7ð <br />x /%6)7ð <br />5*''607/$'4 <br />5/12/2024 <br />PHOTOVOLTAIC <br />SOLAR SYSTEM <br />1338 1/2 N CUSTER ST <br />SANTA ANA,CA,92701 <br />6+6.'5*''6 <br />Ä6KVNG <br />CONSTRUCTION SHALL COMPLY WITH 2022 CBC, CMC, CPC, CRC AND CEC and 2022 <br />California Energy Code, 2022 Fire Code-CFC and CEES and THE CITY OF SANTA ANA Ordinance <br /> NASER KIANFARD <br />APN#39818117 <br />1338 1/2 N CUSTER ST <br />SANTA ANA,CA,92701 <br />TEL(714)-719-0708 <br />-+#0(#4& <br />Scope of Work: <br />6 PANELS + 6 MICRO-INVERTERS INSTALLED ON EXISTING ROOF OF ADU. <br />(1) COMBINER SUBPANEL (1) AC DISCONNECT <br />TENCO <br />SOLAR <br />18340 YORBA LINDA BLVD#107-497 <br />YORBA LINDA,CA, 92886 <br />PH. (949) 795-3472 <br />MATTHEW MITERA <br />CONTRACTOR C10 C46 <br />DC:2.370kW AC:2.138kW <br />Matthew Mitera <br />www. Loyd W Martin .com <br />Solar Structures Engineering <br />#2024-1290 Structural Only <br />May 8, 2024 <br />Bldg# 101119361 <br />Elec# 20182860 <br />The scope of the plans is for the installation of <br />the solar photovoltaic system only and the <br />approval is subject to compliance with all <br />applicable city and state codes and regulations <br />regarding construction. The approval of the plans <br />does not constitute any certification of the <br />accuracy, completeness, or building permit status <br />of the existing buildings and structures as shown. <br />1338 1%2 N Custer <br />St5/31/2024