My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOLD- 420 W 17th St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Seventeenth St
>
420 W Seventeenth St
>
HOLD- 420 W 17th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:37:20 AM
Creation date
6/5/2025 7:36:37 AM
Metadata
Fields
Template:
Plan
Permit Number
20482841
30447261
40339109
Full Address
420 W Seventeenth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BIG SAVER FOODS, INC. <br />4260 Charter St, <br />Vernon, CA 90058 <br />December 21, 2023 <br /> <br />CITY OF SANTA ANA PLANNING DEPARTMENT <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br /> <br />Subject: Pledge to Address Fire Suppression System and OCFA Block for Tenant Improvement <br />Project <br /> <br />Dear Planning Department Official David Chavez, <br /> <br />I am writing on behalf of BIG SAVER FOODS, INC. to express our commitment to ensuring <br />compliance with all fire safety regulations as part of our upcoming tenant improvement project at <br />420 W 17Th Street Santa Ana CA, 92706. As we move forward with the construction, we <br />understand the critical importance of addressing the fire suppression system and the OCFA block <br />requirements, to ensure the safety and well-being of our occupants. <br /> <br />We recognize the importance of these components in meeting the necessary safety standards set <br />forth by the City of Santa Ana and the Orange County Fire Authority (OCFA). Our commitment <br />includes: <br /> <br />1. Engage certified professionals to conduct a comprehensive assessment of the existing fire <br />suppression system and OCFA block. <br />2. Implement all necessary modifications and upgrades as recommended promptly. <br />3. Collaborating with authorities for necessary permits and inspections. <br />4. Ensure the process is completed prior to final inspection. <br /> <br />As we progress with the construction, we will keep the Planning and Building Departments <br />informed of our progress and provide any required documentation promptly. <br /> <br />We appreciate the support and guidance and look forward to contributing to the safety and <br />prosperity of the Santa Ana community. <br /> <br />Thank you for your attention to this matter. Should you require any additional information or <br />clarification, please do not hesitate to contact me at 323-582-7222 ext. 242 or via email <br />jhuerta@bigsaverfoods.com. <br /> <br /> <br />Sincerely, <br /> <br />Jose Huerta <br />Chief Executive Officer <br />323-582-7222 ext. 242 <br />jhuerta@bigsaverfoods.com <br />HOLD- 420 W 17th <br />St3/7/2025
The URL can be used to link to this page
Your browser does not support the video tag.