Laserfiche WebLink
23XX <br />26575 Ruether Ave 2nd floor <br />CH <br />A <br />R <br />C <br />Santa Clarita, CA 91350 <br />661.383.2352 - 818.919.2248 <br />3 <br />11 <br />6 <br />5 <br />7 <br />10 <br />IW <br />10 <br />8 <br />16 <br />12 <br />TYPICAL GAS CONNECTION TO EQUIPMENT <br />1 <br />2 <br />FLOOR SLAB ON GRADE <br />MEMBRANE CLAMP <br />AS REQUIRED <br />FOR DEPTH OF <br />SEWER <br />NO HUB CAST IRON <br />PIPE BELOW FLOOR. <br />SANITARY OR STORM <br />SEWER LINE <br />NOTE: <br />1. PROVIDE ROUND SECURED NICKEL BRONZE ADJUSTABLE TOP WITH "CO" CAST IN COVER. <br />2. PROVIDE CLEANOUT TOP WITH VARIATIONS SUITABLE FOR FLOOR COVERING <br /> (CARPET MARKER, RECESSED FOR TILE, SCORIATED FOR UNFINISHED FLOORS). <br />3. PROVIDE PLASTIC PLUG IN CAST IRON BODY. <br />4. CLEAN THE TOP OF EXPOSED FCO AFTER INSTALLATION. <br />NOTE: <br />TRAP PRIMER VALVE AND DISTRIBUTION <br />UNIT BY PRECISION PLUMBING PRODUCTS <br />INC. OREGON #1 CORROSION RESISTANT <br />BRASS TRAP PRIMER WITH A COPPER <br />RESERVOIR AND A PVC DIAPHRAGM.VALVE <br />TRAP PRIMER VALVE <br />(IN WALL BEHIND <br />ACCESS PANEL) <br />FLOOR DRAIN <br />FINISHED FLOOR <br />SUPPLY TO <br />FREQUENTLY <br />USED FIXTURE <br />CW <br />1/2" <br />UNION <br />MAXIMUM OF 4 <br />1/2" SOFT COPPER <br />CONNECT TO FLOOR DRAIN PROVIDED <br />WITH 1/2" PRIMER TAP <br />TRAP PRIMER PIPING DETAIL <br />FLOOR CLEANOUT <br />1/2" <br />NOT USED <br />GAS PIPE ROOF PENETRATION <br />INDIRECT WASTE EQUIPMENT CONNECTION <br />TYPICAL WATER HAMMER ARRESTOR DETAIL <br />CONDENSATE DRAIN PIPING DETAIL <br />WALL CLEANOUT <br />COLUMN OR <br />PARTITION AS <br />SHOWN ON <br />FLOOR PLANWHERE CLEANOUT IS CONCEALED IN A <br />CHASE OR PARTITION, PROVIDE A ROUND 18 <br />GAUGE STAINLESS STEEL COVER WITH <br />BEVELED EDGES AND FLATHEAD MACHINE <br />SCREW <br />CONCRETE FLOOR SLAB <br />1. PROVIDE WCO WHERE SHOWN ON PLAN. <br />2. CLEANOUT FACE SHALL TERMINATE AT WALL SURFACE. <br />PROVIDE PIPE EXTENSION IF REQUIRED. <br />NOTE: <br />METAL BRAIDED BRONZE <br />FLEXIBLE HOSE WITH <br />WELDED ENDS. (TYP.) <br />ADAPT TO UNIT <br />AS REQUIRED <br />ADAPTER <br />(TYP.) <br />PLATFORM <br />CURB <br />ROOF <br />SCREWED <br />CLEANOUT PLUG <br />PRIMARY DRAIN <br />CAPPED BELOW ROOF <br />RATED ASSEMBLY <br />6" (MAX) <br />3" (MIN.) <br />1" <br />12" DOUBLE BRAIDED FLEXIBLE <br />CONNECTION (FLEXONICS) (RATED <br />FOR EXTERIOR LOCATION) <br />UNION <br />GAS SUPPLY INLET <br />GAS SHUT-OFF VALVE <br />TEE FITTING <br />NIPPLE <br />3" MIN <br />CAP <br />EQUIPMENT <br />AS CLOSE TO THE INLET OF THE <br />EQUIPMENT AS PRACTICAL <br />HOT WATER AND COLD WATER <br />SUPPLY TO FIXTURE <br />PIPING DOWN IN WALL <br />ABOVE CEILING <br />LOCATION <br />ISLAND CABINET <br />LOCATION <br />HOT WATER AND COLD WATER <br />SUPPLY TO FIXTURE <br />HW <br />CW <br />PIPING ABOVE CEILING WHA WHA <br />IN CABINET <br />STAINLESS STEEL <br />ACCESS PANEL <br />ABOVE CEILING <br />BELOW CEILING <br />CW <br />HW <br />PIPING ABOVE CEILING <br />WHA <br />WHA <br />CEILING <br />PROVIDE CLEANOUTS IN <br />TURNS/ENDS OF PIPE DISCHARGE INTO CENTER <br />OF FLOOR SINK WITH MIN. <br />1" AIR GAP <br />MAKE CONNECTION TO <br />EQUIPMENT AS REQUIRED <br />PROVIDE TRAP AND 6" <br />HIGH PIPE VENT OPEN <br />TO ATMOSPHERE <br />WHEN DRAIN LINE IS <br />LONGER THAN 5' <br />SLOPE PIPE AS MUCH <br />AS POSSIBLE TOWARD <br />DISCHARGE <br />NOTE: <br />ROUTE PIPE INCONSPICUOUSLY AND UNOBTRUSIVELY. <br />HANG PIPE AS REQUIRED. REFER TO LOCAL CODES FOR <br />FURTHER INFORMATION. <br />MAKE-UP AIR <br />UNIT <br />(SEE MECH. <br />DWG.) <br />CW <br />HW <br />COVER VALVE BODIES WITH INSULATION, BUT NOT UNIONS. <br />ROOF INSULATION <br />ROOF DECK <br />GALVANIZED STEEL CLAMP. <br />DO NOT CLAMP PIPE TIGHT. <br />ROOFING <br />ERICO RPS50H6 PIPE SUPPORT <br />AND DETAIL INSTALLATION SEE <br />WWW.ERICO.COM <br />PROVIDE 1/2" UNICELLULAR ELASTOMERIC <br />INSULATION OR APPROVED EQUAL ON <br />DOMESTIC HOT AND COLD WATER PIPES <br />AND ALL CEILING SPACES IN WALLS AND <br />CHASES. MITER THE INSULATION AT TEES AND <br />ELBOWS. SEAL ALL JOINTS WITH ADHESIVE <br />NOTE: <br />1.PROVIDE 1/2" FIBERGLASS INSULATION WITH ALL-SERVICE JACKET WITH VAPOR BARRIER OR APPROVED EQUAL ON ALL COLD <br />WATER, CONDENSATE, AND STORM DRAIN PIPE UP TO 4". <br />2.PROVIDE 1" INSULATION OR APPROVED EQUAL ON STORM DRAIN PIPE ABOVE 4" SIZE. <br />3.PROVIDE 1" FIBERGLASS INSULATION WITH ALL-SERVICE JACKET OR APPROVED EQUAL ON DOMESTIC HOT WATER PIPING. <br />4.REFER TO SPECIFICATIONS FOR FURTHER INFORMATION REGARDING INSULATION. INSTALL ALL ITEMS PER SPECIFICATIONS <br /> AND MANUFACTURER'S INSTRUCTIONS. <br />5.MAINTAIN VAPOR BARRIER ON COLD PIPING BY MEANS OF SEALANT AND TAPE. <br />6.FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES SHALL NOT EXCEED 25/50. <br />7.SEAL EXPOSED ENDS OF FIBERGLASS INSULATION WITH ADHESIVE MASTIC. <br />ROOF INSULATION <br />ROOF DECK <br />NOTE: <br />1.LOCATE AT TURNS OF PIPE, AT 4' SPACING FOR PLASTIC PIPE, AND AT THIS SPACING FOR METAL PIPE: 5"=16' 4"=14' 3"=12' <br />2-1/2"=11' 2"=10' 1-1/2"=9' 1-1/4"=8' 1"=7' 3/4"=6'. PLACE BASE SHEETS ON ROOFING BEFORE GRAVEL IF ANY. SET BLOCKS <br />FREE ON BASE SHEETS. STACK BLOCKS AND NAIL THEM TOGETHER WHERE REQUIRED TO ELEVATE PIPING. <br />2.PRIMER COAT AND PAINT EXTERIOR GAS PIPE SAFETY YELLOW COLOR. <br />3.18"x18"x1/2" THICK ROOF WALKWAY MATERIAL FOR BASE SHEET. ("CAREY-TRED" OR PER ARCHITECTURAL SPECIFICATIONS.) <br />FOODSERVICE <br />EQUIPMENT <br />UTILITY INLET <br />HOSE & FITTING <br />QUICK DISCONNECT <br />UL LISTED SHUT-OFF <br />VALVE <br />WALL FACE OF <br />BUILDING <br />COORDINATE WALL <br />REINFORCING WITH <br />GENERAL CONTRACTOR <br />RESTRAINING CABLE <br />NOTE: <br />1.IF UTILITY IS NOT AT FULL HEIGHT SHOWN, PROVIDE PIPING WITH ELBOWS TO RAISE INLET <br />FINISHED <br />FLOOR <br />PROVIDE <br />ROOFING BOOT <br />COORDINATE <br />WITH ROOFER <br />NOTE: MITER THE INSULATION AT TEES <br />AND ELBOWS SO THAT THERE ARE NO <br />GAPS AT JOINTS IF POSSIBLE, THEN TAPE <br />THEM. OTHERWISE FILL THE GAPS WITH <br />BLANKET FIBERGLASS MOULDED PVC <br />FITTING COVERS <br />TAPE JOINTS OF <br />FIBERGLASS INSULATION <br />PROVIDE A ONE FOOT LENGTH OF <br />NONCOMPRESSIBLE INSULATION <br />AT HANGERS FOR ALL PIPE 2" AND <br />LARGER <br />REFER TO OTHER DETAILS FOR <br />TREATMENT OF INSULATION AT <br />PENETRATION OF WALLS, <br />FIREFLOORS, FLOORS, AND <br />FIREWALLS <br />STEPPED FLEXIBLE PVC OR NEOPRENE COUPLING CLAMPED TO <br />FLASHING AND PIPE WITH STAINLESS STEEL SCREW CLAMPS. <br />RIGHT AND LEFT NIPPLE & <br />COUPLINGS 1998 CPC SEE #1211.10 <br />ROOFING OVER <br />METAL FLASHING <br />BY ROOFING <br />CONTRACTOR ROOF SUPPORT <br />REFER TO DETAIL <br />ELBOWS TO <br />COMPENSATE <br />FOR PIPE <br />EXPANSION <br />NOTE: <br />1.REFER TO PLANS FOR PIPE SIZE(S) AND LOCATION(S). <br />2.WELDED OR SCREWED FITTINGS AS SPECIFIED FOR PIPE SIZE. <br />3.LOCATE PENETRATION MINIMUM 18" FROM ADJACENT WALLS. <br />SLEEVE ROOF <br />IF REQUIRED <br />ANCHOR PIPE TO ROOF DECK OR JOISTS <br />14PIPE INSULATION DETAIL <br />15GAS QUICK DISCONNECT <br />ROOF PIPE PENETRATION <br />SEE FLOOR PLAN FOR RECEPTACLE LOCATION. <br />3/4" <br />CO <br />NOTE: <br />1.INSTALL PIPE A MINIMUM OF 76" ABOVE FINISH FLOOR , ANCHORED TO WALL OF BOX WITH SUPPORTS AT MAXIMUM SIX FOOT <br /> CENTERS. <br />2.USE TYPE "M" HARD COPPER TUBE AND FITTINGS WITH LEAD-FREE SOLDER JOINTS. <br />3.SLOPE HORIZONTAL PIPE AT MINIMUM TWO PERCENT. <br />4.KEEP DRAIN LINE FROM EVAPORATOR AS HIGH AS POSSIBLE UNDER THE EVAPORATOR BACK TO THE WALL TO MAXIMIZE SHELF <br /> SPACE UNDER THE COIL. <br />5.REFER TO LOCAL CODE FOR INDIRECT DRAIN REQUIREMENTS. <br />DISCHARGE TO <br />FLOOR DRAIN <br />OR FLOOR SINK <br />WITH AIR GAP <br />OF TWICE PIPE <br />DIAMETER. <br />MAKE CONNECTION <br />TO COIL AS REQUIRED <br />PROVIDE CLEANOUT <br />IN TURNS AND ENDS <br />OF PIPE <br />WALK-IN COOLER OR FREEZER BOX. <br />COORDINATE <br />ROUTING OF <br />DRAIN WITH <br />SHELVING IN <br />WALK-IN BOX <br />DX COIL <br />PROVIDE 1" ELASTOMERIC INSULATION <br />OVER HEAT TRACING ON CONDENSATE <br />LINE (FOR FREEZER BOX ONLY) BY WALK <br />IN BOX INSTALLER, (ELECTRIC HEATING <br />CABLE IS BY CONTRACTOR). <br />DRILL HOLE IN <br />SIDE OF BOX <br />AND PROVIDE <br />SILICONE SEAL <br />AROUND PIPE <br />PENETRATION. <br />FLOOR SINK <br />WALK-IN BOX CONDENSATE DRAIN <br />43-COMP SINK - WATER CONNECTION <br />93-COMP SINK - INDIRECT DRAIN13ICE MACHINE WATER FILTER <br />ICE MAKER DETAIL <br />SPRAY ATTACHMENT <br />SWING <br />FAUCET <br />INSULATED POTABLE <br />WATER SUPPLY PIPING. <br />SHUT OFF <br />VALVES TYP. <br />FLOOR LINE <br />UNIONS TYP. <br />CHECK VALVES TYP. <br />3/4" SYMMONS 7-200 <br />TEMP CONTROL <br />VALVE IN ACCESS <br />PANEL <br />CEILING TO HOT WATER <br />RETURN LINE <br />SEE PLBG. PLAN <br />FOR PIPE SIZES <br />S.O.V. (TYP.) <br />UNIONS (TYP.) <br />3/4" BALANCING <br />VALVE (TYP.) <br />INSTALL ABV. CLG. <br />WALL BRACKET <br />3/4" TO HOT <br />WATER SUPPLY <br />FROM HOT <br />WATER SUPPLY <br />140°F HOT <br />WATER LOOP <br />FROM COLD <br />WATER SUPPLY <br />3/4"3/4"3/4" <br />3/4" <br />FILTER HOUSING EQUIPMENT <br />(SUPPLIED BY OWNER INSTALLED <br />BY PC) <br />1" SHUTOFF <br />VALVES <br />SUPPORT PIPE <br />AS REQ'D. <br />1" FW TO <br />OVENS <br />CONNECT TO EXISTING <br />1" CW STUBBED UP ON <br />PIPING CURB DURING <br />PREVIOUS PHASE <br />1" CW SUPPLY AS SHOWN <br />ON PLANS. CONNECT TO <br />EXISTING 1" CW STUBBED <br />UP DURING PREVIOUS <br />PHASE. SEE DETAIL 14/P301 <br />1" BYPASS TYPICAL <br />HANDSINK <br />FLOOR SINK <br />WITH 1/2 GRATE <br />CLEANOUT <br />PLUG (TYP) <br />LEVER DRAIN (TYP) <br />3 COMPARTMENT PREP <br />SINK <br />2" AIR GAP <br />3" <br />PROVIDE FITTINGS AS <br />EQUIRED <br />3/4" CW. <br />STRAINER <br />3/4"UNION(TYP.) <br />3/4"DRAIN <br />TO F.S. <br />ROW <br />RCW <br />NOTE: <br />PROVIDE POWER AS REQUIRED <br />PRESS <br />GAUGE <br />NOTE: <br />SECURE UNIT TO WALL WITH UNISTRUT <br />P-1000 CHANNELS AND PIPE CLAMPS-2LOCATIONS <br />3/4" TO MISTING SYSTEM UNDER <br />PRODUCE CASE WORK, CONNECT <br />THRU GATE VALVE AND PRESSURE <br />REGULATOR SET AT 45 PSI <br />3/4"RED.PRESS.TYPE <br />BACKFLOW PREVENTOR <br />WITH FUNNEL DRAIN. ABV. <br />CASE WORK <br />REVERSE OSMOSIS <br />SYSTEM ABV. <br />CASE WORK <br />3/4" RCW, 3/4" TO HDR AT 6" AFF <br />BEHIND PRODUCE CASES, & 1/2" <br />TO QUICK DISCONNECT LOCATED <br />AT BULK FLORAL CASE <br />3/4" PRESS. REG. <br />SET @ 15PSI ABV. <br />CASE WORK <br />17PRODUCE PREP. RP/PRV ASSEMBLY FOR <br />MISTING SYSTEM <br />HOLD- 420 W 17th <br />St3/7/2025