Laserfiche WebLink
G <br />NOTES TO SUBCONTRACTOR: <br />1. THE GENERAL SUBCONTRACTOR MUST VERIFY ALL DIMENSIONS, CONDITIONS AND ELEVATIONS <br />BEFORE PROCEEDING WITH THE WORK. ALL DISCREPANCIES SHALL BE RESOLVED BEFORE <br />PROCEEDING WITH THE WORK. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER IN <br />ACCORDANCE WITH ACCEPTED CONSTRUCTION PRACTICES. <br />2. IT IS THE INTENTION OF THESE DRAWINGS TO SHOW THE COMPLETED INSTALLATION. THE <br />SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING, SHORING, TIES, FORM <br />WORK, ETC. IN ACCORDANCE WITH ALL NATIONAL, STATE, AND LOCAL ORDINANCES, TO SAFELY <br />EXECUTE ALL WORK AND SHALL BE RESPONSIBLE FOR SAME. ALL WORK SHALL BE IN <br />ACCORDANCE WITH LOCAL CODES. <br />3. THE SUBCONTRACTOR SHALL USE ADEQUATE NUMBER OF SKILLED WORKMAN WHO ARE <br />THOROUGHLY TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND WHO ARE COMPLETELY <br />FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND METHOD NEEDED FOR PROPER PERFORMANCE <br />OF THE WORK. <br />4. SUBCONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION <br />PRACTICES, CONSTRUCTION SUBCONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE <br />PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL <br />BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND <br />SUBCONTRACTOR FURTHER AGREES TO INDEMNIFY AND HOLD DESIGN ENGINEER HARMLESS FROM <br />ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH PERFORMANCE OF WORK ON THIS <br />PROJECT. <br />5. SITE GROUNDING SHALL COMPLY WITH AT&T WIRELESS SERVICES TECHNICAL SPECIFICATIONS <br />FOR FACILITY GROUNDING FOR CELL SITE STANDARDS, LATEST EDITION, AND COMPLY WITH AT&T <br />TOWERS GROUNDING CHECKLIST, LATEST VERSION. WHEN NATIONAL AND LOCAL GROUNDING <br />CODES ARE MORE STRINGENT THEY SHALL GOVERN. <br />6. ALL WORK SHALL COMPLY WITH OSHA AND STATE SAFETY REQUIREMENTS. PROCEDURES FOR <br />THE PROTECTION OF EXCAVATIONS, EXISTING CONSTRUCTION AND UTILITIES SHALL BE <br />ESTABLISHED PRIOR TO FOUNDATION INSTALLATION. <br />7. ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL <br />CODES OR ORDINANCES. THE MOST STRINGENT CODE WILL APPLY IN THE CASE OF <br />DISCREPANCIES OR DIFFERENCES IN THE CODE REQUIREMENTS. <br />8. ANY DAMAGE TO THE ADJACENT PROPERTIES WILL BE CORRECTED AT THE SUBCONTRACTOR'S <br />EXPENSE TO THE SATISFACTION OF THE LANDOWNER AND THE CONSTRUCTION MANAGER. <br />9. THE COMPLETE BID PACKAGE INCLUDES THESE CONSTRUCTION DRAWINGS ALONG WITH THE <br />SPECIFICATIONS. SUBCONTRACTOR IS RESPONSIBLE FOR REVIEW OF TOTAL BID PACKAGE PRIOR <br />TO BID SUBMITTAL. <br />10. SUBCONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES WITHIN CONSTRUCTION <br />LIMITS PRIOR TO CONSTRUCTION. <br />11. THE SUBCONTRACTOR IS RESPONSIBLE FOR MAINTAINING POSITIVE DRAINAGE ON THE SITE <br />AT ALL TIMES. SILT AND EROSION CONTROL SHALL BE MAINTAINED ON THE DOWNSTREAM SIDE <br />OF THE SITE AT ALL TIMES. ANY DAMAGE TO ADJACENT PROPERTIES WILL BE CORRECTED AT THE <br />SUBCONTRACTOR'S EXPENSE. <br />12. CLEARING OF TREES AND VEGETATION ON THE SITE SHOULD BE HELD TO A MINIMUM. ONLY <br />THE TREES NECESSARY FOR CONSTRUCTION OF THE FACILITIES SHALL BE REMOVED. ANY <br />DAMAGE TO THE PROPERTY OUTSIDE THE LEASED PROPERTY SHALL BE REPAIRED BY THE <br />SUBCONTRACTOR. <br />13. ALL SUITABLE BORROW MATERIAL FOR BACK FILL OF THE SITE SHALL BE INCLUDED IN THE BID. <br />EXCESS TOPSOIL AND UNSUITABLE MATERIAL SHALL BE DISPOSED OF OFF SITE AT LOCATIONS <br />APPROVED BY GOVERNING AGENCIES PRIOR TO DISPOSAL. <br />14. PERMITS: THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING <br />THE COST OF ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, ETC. <br />15. RECORD DRAWINGS: MAINTAIN A RECORD OF ALL CHANGES, SUBSTITUTIONS BETWEEN <br />WORK AS SPECIFIED AND INSTALLED. RECORD CHANGES ON A CLEAN SET OF CONTRACT <br />DRAWINGS WHICH SHALL BE TURNED OVER TO THE CONSTRUCTION MANAGER UPON COMPLETION <br />OF THE PROJECT. <br />16. THE PLANS SHOW SOME KNOWN SUBSURFACE STRUCTURES, ABOVE GROUND STRUCTURES <br />AND/OR EXISTING UTILITIES BELIEVED TO BE IN THE WORKING AREA. IT IS THE RESPONSIBILITY OF <br />THE SUBCONTRACTOR TO VERIFY ALL UTILITIES, PIPELINES AND OTHER STRUCTURES SHOWN OR <br />NOT SHOWN ON THESE PLANS. THE SUBCONTRACTOR SHALL CONTACT THE LOCAL <br />LOCATE SERVICE BEFORE DIGGING OR DRILLING. ANY DAMAGE TO EXISTING <br />UTILITIES SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER AND ENGINEER AT THE <br />SUBCONTRACTOR'S EXPENSE. <br />GENERAL PROJECT NOTES: <br />1. THIS PROPOSAL IS FOR THE ADDITION OF A NEW GENERATOR ON A NEW CONCRETE PAD TO AN <br />EXISTING UNMANNED TELECOMMUNICATIONS FACILITY CONSISTING OF AN EQUIPMENT <br />SHELTER/PLATFORM AND TOWER. <br />2. THE PROPOSED FACILITY WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR <br />SEWER SERVICE. <br />3. THE PROPOSED FACILITY IS UNMANNED AND IS NOT FOR HUMAN HABITAT. (NO HANDICAP <br />ACCESS IS REQUIRED) <br />4. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION, APPROXIMATELY 2 <br />TIMES PER MONTH BY AT&T TECHNICIANS. <br />5. OUTDOOR STORAGE AND SOLID WASTE CONTAINERS ARE NOT PROPOSED. <br />6. ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH <br />THE PROJECT SPECIFICATIONS. <br />7. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE CAUSED BY THE <br />CONSTRUCTION OPERATION. <br />8. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTION <br />REQUIRED FOR CONSTRUCTION. <br />9. SUBCONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS. <br />ELECTRICAL NOTES: <br />A. GENERAL <br />1. COORDINATE LOCATION AND POWER REQUIREMENTS OF ALL EQUIPMENT WITH AT&T AND <br />EQUIPMENT SUPPLIER PRIOR TO INSTALLATION. <br />2. COORDINATE LOCATION AND REQUIREMENTS FOR ELECTRICAL AND TELEPHONE SERVICES <br />WITH THE PROPERTY REPRESENTATIVE, AT&T AND UTILITY COMPANIES. ROUTING OF <br />CONDUITS MAY BE MODIFIED TO MEET SITE REQUIREMENTS. EXACT CONDUIT ROUTING TO <br />BE DETERMINED IN THE FIELD. <br />3. ALL WIRING AND EQUIPMENT SHOWN ON ELECTRICAL SHEETS SHALL BE FURNISHED AND <br />INSTALLED UNDER ELECTRICAL PORTION OF CONTRACT UNLESS OTHERWISE NOTED <br />4. UNINTERRUPTED ELECTRICAL SERVICE FOR EXISTING EQUIPMENT SHALL BE MAINTAINED <br />DURING THE INSTALLATION OF THE WORK DESCRIBED UNDER THESE DOCUMENTS. <br />TEMPORARY EQUIPMENT, CABLES AND WHATEVER ELSE IS NECESSARY SHALL BE PROVIDED <br />AS REQUIRED TO MAINTAIN ELECTRICAL SERVICE. TEMPORARY SERVICE FACILITIES, IF <br />REQUIRED AT ANY TIME, SHALL NOT BE DISCONNECTED OR REMOVED UNTIL NEW SERVICE <br />EQUIPMENT IS IN PROPER OPERATION. IF ANY SERVICE OR SYSTEM MUST BE INTERRUPTED, <br />THE CONTRACTOR SHALL REQUEST PERMISSION IN WRITING STATING THE DATE, TIME, ETC. <br />THE SERVICE WILL BE INTERRUPTED AND THE AREAS AFFECTED. THIS REQUEST SHALL BE <br />MADE IN SUFFICIENT TIME FOR PROPER ARRANGEMENTS TO BE MADE. WRITTEN <br />PERMISSION SHALL BE OBTAINED FROM THE OWNER BEFORE INTERRUPTING ELECTRICAL <br />SERVICE. <br />5. COORDINATE NEW WORK WITH OTHER TRADES AND VERIFY EXISTING CONDITIONS TO AVOID <br />INTERFERENCE. IN CASE OF INTERFERENCE, AT&T'S REPRESENTATIVE WILL DECIDE WHICH <br />WORK IS TO BE RELOCATED, REGARDLESS OF WHICH WAS FIRST INSTALLED. <br />6. THE INSTALLATION MUST COMPLY WITH NEC AND ALL FEDERAL, STATE AND LOCAL RULES <br />AND REGULATIONS. <br />7. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF <br />SYSTEMS AND EQUIPMENT UNLESS OTHERWISE DEFINED BY DIMENSIONS OR DETAILS. <br />EXACT EQUIPMENT LOCATIONS AND RACEWAY ROUTING SHALL BE GOVERNED BY ACTUAL <br />FIELD CONDITIONS AND/OR DIRECTIONS FROM AT&T'S REPRESENTATIVE. <br />8. CONTRACTOR SHALL PAY ALL PERMITS AND FEES REQUIRED. <br />9. ALL MATERIALS SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE <br />WITH THE APPLICABLE SECTIONS OF THE STANDARDS REFERENCED BELOW: <br /> a. ANSI (AMERICAN NATIONAL STANDARDS INSTITUTE) <br /> b. ASTIM (AMERICAN SOCIETY FOR TESTING MATERIALS) <br /> c. ETL (ELECTRICAL TESTING LABORATORY) <br /> d. ICEA (INSULATED CABLE ENGINEERS ASSOCIATION) <br /> e. IEEE (INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS) <br /> f. MBFU (NATIONAL BOARD OF FIRE UNDERWRITERS) <br /> g. NESC (NATIONAL ELECTRICAL SAFETY CODE) <br /> h. NEMA (NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION) <br /> i. NFPA (NATIONAL FIRE PROTECTION ASSOCIATION) <br /> j. UL (UNDERWRITER'S LABORATORY) <br /> k. NEC (NATIONAL ELECTRICAL CODE) <br />10. CONTRACTOR SHALL REVIEW PLANS, DETAILS AND SPECIFICATIONS IN DETAIL AND ADJUST <br />WORK TO CONFORM WITH ACTUAL SITE CONDITIONS SO THAT ELECTRICAL DEVICES AND <br />EQUIPMENT WILL BE LOCATED AND READILY ACCESSIBLE. QUANTITIES LISTED IN MATERIAL <br />LISTS ON THE DRAWINGS ARE FOR INFORMATION ONLY. THE CONTRACTOR SHALL PROVIDE <br />HIS OWN TAKEOFF FOR MATERIAL QUANTITY AND TYPES BASED ON ACTUAL SITE <br />CONDITIONS, IN ADDITION, CONTRACTOR SHALL PROVIDE ALL NECESSARY MATERIALS TO <br />INSTALL EQUIPMENT FURNISHED BY AT&T OR ITS SUPPLIERS. ALL ITEMS NOT SPECIFICALLY <br />MENTIONED HEREIN OR SHOWN ON THE DRAWINGS, BUT WHICH ARE OBVIOUSLY <br />NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION, SHALL BE INCLUDED. <br />11. THE CONTRACTOR OR BIDDER SHALL BEAR THE RESPONSIBILITY OF NOTIFYING (IN WRITING) <br />AT&T'S REPRESENTATIVE OF ANY CONFLICTS PRIOR TO THE SUBMISSION OF CONTRACTOR'S <br />PROPOSAL OR PERFORMANCE OF WORK, IN THE EVENT OF DISCREPANCIES THE <br />CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK, UNLESS DIRECTED IN <br />WRITING OTHERWISE. <br />ELECTRICAL NOTES: <br />12. ALL FLOORS WHERE PENETRATIONS ARE REQUIRED IN BUILDING ARE TO BE CORE DRILLED <br />AND THEN FIREPROOFED. <br />B. WIRING/CONDUIT <br />1. PROVIDE PULL BOXES AND JUNCTION BOXES WHERE SHOWN OR AS REQUIRED BY CODE <br />SUCH THAT NO MORE THAN THE EQUIVALENT OF FOUR QUARTER BENDS (360 DEGREES <br />TOTAL) EXIST IN A CONDUIT RUN. <br />2. ALL POWER AND CONTROL/INDICATION WIRING SHALL BE TYPE THHN/THWN 600V RATED 75 <br />DEGREES CELSIUS, UNLESS NOTED OTHERWISE. <br />3. CONDUIT BENDS SHALL BE MADE IN ACCORDANCE WITH NEC TABLE 346-10. NO RIGHT <br />ANGLE DEVICE OTHER THAN STANDARD CONDUIT ELBOWS WITH 12" MINIMUM INSIDE <br />SWEEPS FOR ALL CONDUITS 2" OR LARGER. <br />4. POWER WIRING SIZE SHALL NOT BE SMALLER THAN #12 AWG. <br />5. ALL WIRING SHALL BE COPPER. ALUMINUM WILL NOT BE ACCEPTABLE ALL POWER CIRCUITS <br />SHALL CONTAIN A GROUND WIRE. <br />6. PHASE MARKINGS TO BE USED AT POWER CONDUCTOR TERMINATIONS. <br />7. CONTRACTOR SHALL ENSURE INTEGRITY IS MAINTAINED WHEN INSTALLING CONDUIT AND <br />WIRING. <br />8. INSTALL PULL STRING IN ALL CONDUIT. <br />9. FOR ROOFTOP INSTALLS AND BUILD-OUTS, CONDUITS INSIDE BUILDING AND ON ROOF <br />SHALL BE RGS, UNLESS OTHERWISE NOTED. FOR RAW LAND SITES AND CO-LOCATES, PVC <br />SCHEDULE 80 SHALL BE UTILIZED UNLESS NOTED OTHERWISE. <br />10. MAINTAIN MINIMUM 1'-0" VERTICAL AND 1'-0" HORIZONTAL SEPARATIONS FROM ANY <br />MECHANICAL GAS PIPING. <br />11. ALL WIRING ROUTED IN PLENUM TO BE RATED OR IN METALLIC FLEX (LIQUIDTITE) CONDUIT. <br />C. EQUIPMENT <br />1. EQUIPMENT/PARTS CONNECTED TO EXISTING PANELS, DUCTS, ETC. SHALL MATCH THE <br />CHARACTERISTICS (A/C, V, A) OF THAT EQUIPMENT. <br />2. ALL ELECTRICAL EQUIPMENT OUTSIDE SHALL BE NEMA 3R RATED. <br />D. GROUNDING <br />1. ALL GROUND CONNECTIONS TO BUILDING SHALL BE MADE USING TWO-HOLE CONNECTORS. <br />PROVIDE STAINLESS STEEL BOLTS AND LOCK WASHERS ON ALL MECHANICAL GROUND <br />CONNECTIONS. <br />2. ALL EQUIPMENT SURFACES TO BE BONDED TO GROUNDING SYSTEM SHALL BE STRIPPED OF <br />ALL PAINT AND DIRT AT ANY POINT OF CONNECTION. CONNECTIONS TO VARIOUS METALS SHALL <br />BE OF A TYPE AS TO PREVENT A GALVANIC OR CORROSIVE REACTION. AREA SHALL BE <br />REPAINTED FOLLOWING BONDING. <br />3. ANY METALLIC ITEM WITHIN 6' OF ANY EQUIPMENT OR METALLIC INFRASTRUCTURE (RACKS, <br />CABLE TRAY.. ETC.) OR GROUND CONDUCTORS MUST BE CONNECTED TO THE <br />GROUNDING SYSTEM PER AT&T STANDARDS. <br />4. EXTERIOR, ABOVE GRADE GROUND CONNECTIONS SHALL BE FURNISHED WITH A LIBERAL <br />PROTECTIVE COATING OF ANTI-OXIDATION COMPOUND. <br />5. ALL MATERIALS AND LABOR REQUIRED FOR THE GROUNDING SYSTEM AS INDICATED ON THE <br />PLANS AND DETAILS, AND AS DESCRIBED HEREIN SHALL BE FURNISHED BY THE CONTRACTOR <br />UNLESS OTHERWISE NOTED. <br />6. EXACT LOCATION OF GROUND CONNECTION POINTS SHALL BE DETERMINED IN FIELD. <br />ADJUST LOCATIONS INDICATED ON PLANS ACCORDING TO ACTUAL EQUIPMENT LOCATIONS <br />TO KEEP THE GROUND CONNECTION CABLES AS SHORT AND STRAIGHT AS PRACTICAL. <br />7. PROVIDE ALL ELECTRICAL SYSTEM AND EQUIPMENT GROUNDS AS REQUIRED BY THE CURRENT <br />EDITION OF THE NATIONAL ELECTRIC CODE, THE CURRENT EDITION OF THE NATIONAL <br />ELECTRICAL SAFETY CODE AND AT&T STANDARDS. BONDING JUMPERS WITH APPROVED GROUND <br />FITTINGS SHALL BE INSTALLED AT ALL RACEWAYS, EQUIPMENT ENCLOSURES, PULL BOXES, ETC. <br />TO MAINTAIN GROUND CONTINUITY WHERE REQUIRED BY CODE. <br />8. ALL BURIED EQUIPMENT GROUND CONDUCTORS SHALL BE #2 AWG BARE, TINNED, SOLID <br />COPPER UNLESS NOTED OTHERWISE ON THE DRAWINGS. <br />E. INSPECTION/DOCUMENTATION <br />1. THE CONTRACTOR, UPON COMPLETION OF HIS WORK, SHALL PROVIDE AS-BUILT DRAWINGS. <br />INFORMATION SHOULD BE GIVEN TO THE GENERAL CONTRACTOR FOR INCLUSION IN FINAL <br />AS-BUILT SURVEY DOCUMENTS TO BE GIVEN TO THE OWNER. <br />2. CONTRACTOR SHALL SUPPLY DOCUMENTATION ATTESTING TO THE COMPLETE GROUND <br />SYSTEM'S RESISTANCE TO GROUND (MAX. 5 OHMS). <br />3. AN ELECTRICAL INSPECTION SHALL BE MADE BY AN INSPECTING AGENCY APPROVED BY AT&T'S <br />REPRESENTATIVE. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND OBTAIN <br />POWER COMPANY APPROVAL. <br />4. CONTRACTOR SHALL HAVE ATS AND GENERATOR RELAY INSTALLATION AND CONNECTIONS <br />INSPECTED BY OTHERS TO ENSURE THAT UL LISTING FOR THAT EQUIPMENT IS NOT VOIDED. <br />230817 <br />REQUIRED SPECIAL INSPECTIONS: <br />1. PER IBC 1705.4 SPECIAL INSPECTION OF MASONRY. (IF REQUIRED) <br />CEC <br />l. CEC (CALIFORNIA ELECTRICAL CODE)CBC <br />GENERAL NOTES <br />PO BOX 2621, BOISE, ID 83701 <br />530.539.4787 <br />CONTACT@GEOSTRUCTURAL.COM <br />WWW.GEOSTRUCTURAL.COM <br />0 04/01/24 ISSUED FOR CONSTRUCTION BM <br />SHEET TITLE: <br />SHEET NUMBER: <br />N-1 <br />REV DATE DESCRIPTION INT <br />REVISIONS <br />SITE INFORMATION: <br />2621 SOUTH BIRCH STREET <br />SANTA ANA, CA 92707 <br />GENERATOR INSTALLATION <br />PROJECT <br />MAIN - DYER <br />10086996 <br />CHECKED BY:JAD <br />THE INFORMATION CONTAINED IN THIS SET OF <br />DOCUMENTS IS PROPRIETARY BY NATURE. ANY <br />USE OR DISCLOSURE OTHER THAN THAT WHICH <br />RELATES TO THE CLIENT NAMES IS STRICTLY <br />PROHIBITED. <br />at t & <br />GENERAL DYNAMICS <br />Information Technology <br />09/30/25 <br />JURISDICTION USE: <br />DATE SIGNED: 4/2/24 <br />2621 S Birch St - 101119515 & <br />20182981 <br />7/24/2024