My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 S Sycamore St Unit# A - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Sycamore St
>
3000 S Sycamore St Unit# A
>
3000 S Sycamore St Unit# A - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:37:07 AM
Creation date
6/5/2025 7:36:43 AM
Metadata
Fields
Template:
Plan
Permit Number
20182272
101118488
Full Address
3000 S Sycamore St Unit# A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
© 2020 IRONRIDGE, INC. VERSION 3.2 FLUSH MOUNT INSTALLATION MANUAL - 7 <br />B. PLAC e MODUL e <br />Place module on rails (module cells not shown for <br />clarity). When installing CAMO the module can <br />overhang the rail no more than 1/4". <br />D. S eCUR e TO FRAMe <br />Rotate handle with an upwards motion until CAMO <br />snaps into rail channel. Ensure CAMO bonding <br />pins are fully seated on top of module frame. <br />CAMO <br />A. SLID e INTO RAIL <br />Slide CAMO into rail channel far enough to clear the <br />module frame. CAMO requires 6" of clearance from end of <br />rail. <br />C. PULL TOWARDS e ND <br />Pull CAMO towards rail ends, at 45 degree angle, so the <br />bonding bolt contacts the module flange edge. <br />B <br />C D <br />A <br />6" Cle <br />a <br />r <br />a <br />n <br />c <br />e <br />8" BONDING JUMP e R <br />8" Bonding Jumper is an electrical bonding jumper that can <br />be used on the Flush Mount System for row to row bonding; <br />making the module frames the medium for the equipment <br />ground path. <br /> ➢Bonding jumper is pushed onto the bottom flange of the module. <br /> <br /> ➢New jumpers should be used if re-installation of jumper is required. <br /> <br /> ➢Supports bottom flange thicknesses from 1.2mm to 3.1mm. <br />FRAMe COMPATIBILITY <br />CAMO has been tested or evaluated with all modules listed in the <br />Module Compatibility section having frames within the referenced <br />dimensions. Be sure the specific module being used meets the <br />dimension requirements. <br /> ➢For installations with Hanwha Q CeLLS modules with 32 mm frame heights, <br />the maximum ground snow is 45 PSF (33 PSF module pressure). <br /> ➢CAMO is only compatable with Canadian Solar module CS1YxxxMS. “xxx” <br />refers to the module power rating <br />3000 S Sycamore St Unit# <br />A- 201822724/29/2024
The URL can be used to link to this page
Your browser does not support the video tag.