My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
901 E Grovemont St- 101118284 & 20182123 - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grovemont St
>
901 E Grovemont St
>
901 E Grovemont St- 101118284 & 20182123 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 10:08:14 AM
Creation date
6/5/2025 7:36:48 AM
Metadata
Fields
Template:
Plan
Permit Number
20182123
101118284
Full Address
901 E Grovemont St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® <br />VSE Project Number: U3998.0088.241 <br />January 29, 2024 <br />Solectric Solution <br />6083 Andrews Court <br />Fontana, CA 92336 <br />REFERENCE: Grovemont Residence: 901 Grovemont Street, Santa Ana, CA 92706 <br />Solar Array Installation <br />To Whom It May Concern: <br />We have reviewed the existing structure at the above referenced site.The purpose of our review was to determine the <br />adequacy of the existing structure to support the proposed installation of solar panels on the roof as shown on the panel <br />layout plan. <br />Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel installation. <br />Design Parameters <br />Code: California Residential Code, 2022 Edition (2021 IRC) <br />Risk Category: II <br />Design wind speed, Vult: 95 mph (3-sec gust) <br />Wind exposure category: C <br />Seismic design category: D <br />Existing Roof Structure <br />Roof structure: 2x4 manufactured trusses @ 24" o.c. <br />Roofing material: composite shingles <br />Roof pitch: 6:12 <br />Connection to Roof <br />Mounting connection: (1) 5/16" lag screw w/ min. 2.5" threaded embedment into framing at max. 48" o.c. along rails <br />Install (2) rails per row of panels, evenly spaced; panel length perpendicular to the rails shall not exceed 68 in <br />Rail cantilever shall not exceed the lesser of 50% of the connection spacing or maximum cantilever allowed by <br />manufacturer <br />At flat hip framing, if occurs, reduce connection spacing listed above by 50% or see attached detail for blocking option. <br />Connections shall be staggered so as not to overload any existing structural member <br />Conclusions <br />Based upon our review,we conclude that the existing structure is adequate to support the proposed solar panel installation. <br />In the area of the solar array,other live loads will not be present or will be greatly reduced (2022 CRC,Section R324.4.1.1). <br />The gravity loads,and thus the stresses of the structural elements,in the area of the solar array are either decreased or <br />increased by no more than 5%.Therefore,the requirements of Section 503.3 of the 2022 CEBC are met and the structure is <br />permitted to remain unaltered. <br />651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com <br />901 E Grovemont St- <br />101118284 & 201821233/21/2024
The URL can be used to link to this page
Your browser does not support the video tag.