Laserfiche WebLink
ARCHITECT Castillo Engineering, Inc.PROJECT 2201 HALLADAY STREET <br />1205 Pine Avenue, Suite 201 <br />Long Beach, CA 90813 <br />ENGR. MC DATE JOB NO. 24-459 SHEET NO. <br />Given: <br />h1 =18 in.d1 =3.5 in.D L TRIB D L <br />w1 15 20 17 =255 +340 <br />h2 =18 in.w =12 in.16 0 8 =128 +0 <br />15 40 3 45 +120 <br />15 60 0 =0 +0 <br />H =36 in.b =6 in.428 +460 =888 plf <br />Area = 906 in.2 L = 75.5 in. <br />6.292 ft.2 = 6.29 ft. <br />Stemwall wt. = 150 x 6 x 18 /144 = 113 plf <br />=1001 <br />qa =1500 psf <br />Pa =1500 x 6.29 =9.44 kips Pload =1001 x 6.29 =6.29 kips <br />Pnet kips <br />(E) CF1 RAISED FLOOR CAPACITY <br />Pnet = <br />26/06/2024 <br />3.14 kips <br />wuniform <br />24 <br />2201 S Halladay St <br />9/24/2024