My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1327 S Grand Ave - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
1327 S Grand Ave
>
1327 S Grand Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 7:37:11 AM
Creation date
6/5/2025 7:36:53 AM
Metadata
Fields
Template:
Plan
Permit Number
101119260
Full Address
1327 S Grand Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> SCE Santa Ana <br /> October 25,2019 <br />Project No. 3.31634 <br /> Page 10 <br /> <br /> <br />15.2.1 Site Preparation <br /> <br />Prior to grading, the proposed structural improvement areas (i.e. all structural <br />fill, pavements areas and structural building, etc.) of the site should be cleared <br />of surface and subsurface obstructions, including vegetation. Vegetation and <br />debris should be disposed of offsite. Holes resulting from removal of buried <br />obstructions, which extend below the recommended removal depths described <br />herein or below finished site grades (whichever is lower) should be filled with <br />properly compacted soil. Should existing underground utilities be encountered <br />they should be completely removed and properly backfilled. Alternatively, if the <br />utility is not within the influence zone of the foundation it may be abandoned in <br />place by fully grouting the pipe. <br /> <br />15.3 Excavation <br /> <br />Up to approximately 2 to 2 ½-feet of surficial undocumented fill soils were observed <br />during our investigation. These soils will need to be over-excavated and removed from <br />within all structural areas. Where not constrained at junctions with existing structures, <br />excavations should extend to a minimum horizontal distance of at least 3-feet outside <br />any building footprints. The actual depth of removal may vary and should be field <br />verified and approved by the geotechnical consultant prior to fill placement. Removals <br />and compaction recommendations are provided in Appendix C. <br /> <br />Cut-Fill transitions shall not be allowed to occur below foundations. We recommend <br />that the subgrade materials be made uniform. For building pads located across a cut- <br />fill transition, this can be accomplished by excavating the native materials to at least 2- <br />foot below the bottom of the deepest footing and extending to 3-foot beyond the <br />building corners. The bottom of the excavation should then be scarified, moisture <br />conditioned, and replaced as a uniform layer of engineered fill. <br /> <br />Site soils are suitable for use as compacted fill if they are processed in accordance with <br />the recommendations in Appendix C. Approved fill soils should be placed in thin lifts <br />(≤ 8-inches loose thickness) and moisture conditioned to at least optimum moisture <br />content. All fill should be compacted to a minimum of 90-percent relative compaction. <br /> <br />Local conditions may be encountered during excavation that could require additional <br />over-excavation beyond the above noted minimum in order to obtain an acceptable <br />55 of 100 <br />1327 S Grand Ave <br />12/12/2024
The URL can be used to link to this page
Your browser does not support the video tag.