Laserfiche WebLink
California Building Code 2022 <br />S T A T E M E N T O F S P E C I A L I N S P E C T I O N S <br />Tests and inspections indicated on the drawings are required for this project. The tests and <br />inspections indicated here are the responsibilities of the Owner's Special Inspector, as required <br />by Chapter 17 of the Building Code. <br />The Special Inspector shall observe the work assigned for conformance with the approved <br />design drawings and specifications. <br />1. Special inspections and associated testing shall be performed by an approved qualified <br />testing and inspecting agency meeting the requirements of ASTM E329 (materials), <br />ASTM D3740 (soils), ASTM C1077 (concrete), and ASTM E543 (non-destructive <br />testing). The testing and inspecting agency shall furnish to the architect/engineer a <br />copy of their scope of accreditation. Special inspectors shall be certified by the building <br />official. Welding inspectors shall be qualified per Section 6.1.4 of AWS D1.1. <br />2. The Special Inspector shall furnish inspection reports to the building official, the <br />Architect/Engineer and other designated persons. All discrepancies shall be brought to <br />the immediate attention of the Contractor for correction, then, if uncorrected, to the <br />proper design authority and to the Building Official. <br />3. The Special Inspector shall submit a final signed report stating whether the work <br />requiring special inspection was, to the best of the inspector's knowledge, in <br />conformance with the approved plans and specifications and applicable standards of <br />quality and workmanship of the Building Code. <br />4. The Contractor shall hold a pre-construction meeting involving the Architect, Structural <br />Engineer and the Special Inspector in order to discuss the specific requirements of this <br />project. <br />5. Terminology: <br />a. Continuous: Special inspection by the special inspector who is present when and <br />where the work to be inspected is being performed. <br />b. Periodic: Special inspection by the special inspector who is intermittently present <br />where the work to be inspected has been performed or is being performed. <br />c. Observe: Observe these items on a random basis. Operations need not be delayed <br />pending these inspections. <br />d. Perform: Perform these tasks for each element. <br />6. Indicated testing meets minimum requirements for structural testing to be provided by <br />the approved qualified testing and inspecting agency. Additional tests for construction <br />considerations are not indicated. The need for such additional tests shall be determined <br />by the Contractor and provided at the Contractor's expense. <br />7. See project specifications for additional requirements. <br />ACI 318 2019* <br />ACI 440.2R 2008* <br />2012 <br />ACI 506.2 2013* <br />ANSI/AISC 341 2016* <br />ANSI/SDI QA/QC 2017 <br />ASTM C31 2018b* <br />2021 <br />2020 <br />2017* <br />2020 <br />2020 <br />2016* <br />2017 <br />2017 <br />2023 <br />2012-e1* <br />ACI 440.3R <br />ANSI/AISC 360 2016* <br />ASTM C39 <br />ASTM C42 <br />ASTM C94 <br />ASTM C143 <br />ASTM C780 <br />ASTM C1019 <br />ASTM C1064 <br />ASTM C1077 <br />ASTM C1314 <br />ASTM D1557 <br />2019ASTM D3740 <br />2021ASTM D7522 <br />2019ASTM E164 <br />2021 <br />2022 <br />2021 <br />2021 <br />2015* <br />2018*AWS D1.4 <br />2020RCSC Specification <br />ASTM E329 <br />ASTM E488 <br />ASTM E543 <br />ASTM E709 <br />AWS D1.1 <br />2020*SJI 100 <br />2015*SJI 200 <br />2016*TMS 602 <br />* Reference standard cited by CBC 2022, Chapter 35 <br />ACI 506R 2016* <br />ACI 506.4R 1994* <br />Reference Standard Editions: <br />S T A T E M E N T O F S T R U C T U R A L O B S E R V A T I O N <br />Structural Observation is required by Chapter 17 of the California Building Code. Types of work <br />listed below shall be observed during periodic site visits by the Structural Engineer. Contractor is <br />responsible for notifying Structural Engineer 3 business days before work is ready for <br />observation. Structural Observation does not constitute Special Inspection. <br />1. Concrete & Reinforcing Steel: Reinforcing steel, anchor rods, and other embedments shall <br />be observed prior to placement of cast-in-place concrete and/or shotcrete elements. <br />2. Concrete Unit Masonry: Reinforcing steel, anchor rods, and other embedments shall be <br />observed prior to masonry unit placement and grouting of cells. <br />3. Structural Steel: Steel elements and welded/bolted connections shall be observed. <br />4. Light Cold-Formed Metal Framing: Floor/roof diaphragm fastening and hardware <br />installation; cold-formed metal shear wall framing prior to the installation of sheathing; <br />Shear wall screw fastening, welding, and hardware installation. <br />5. Structural Wood: Floor/roof diaphragm nailing and hardware installation, shear wall nailing <br />and hardware installation, holdown installation, and bolted connection installation. <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Continuous Periodic <br />RemarksFrequency <br />Soil and Foundations <br />1 Verify materials below shallow foundations are adequate to achieve the <br />design bearing capacity.X <br />2 Verify excavations are extended to proper depth and have reached proper <br />material.X <br />3 Perform classification and testing of compacted fill materials. Table 1705.6 X <br />4 <br />During fill placement verify use of proper materials and procedures in <br />accordance with the provisions of the approved geotechnical report. Verify <br />densities and lift thicknesses during placement and compaction of compacted <br />fill. <br />X <br />5 Prior to placement of compacted fill, inspect subgrade and verify that site has <br />been prepared properly.X <br />Performed by the Geotechnical Engineer <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Continuous Periodic <br />RemarksFrequency <br />Concrete Formwork <br />1 <br />Inspect erected formwork, shoring, and bracing to verify the shape, location <br />and dimensions, and to ensure that work is in accordance with formwork <br />design, and to verify that supports, fastenings, wedges, ties, and items are <br />secure. <br />Table 1705.3 ACI 318: <br />26.11.1.2(b)X <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Continuous Periodic <br />RemarksFrequency <br />Concrete Reinforcement and Embedded Items <br />2 <br />Cast-in-Place Anchors and other embedments: Verify the anchor diameter, <br />length, type, grade, and depth of embedment into the concrete. Verify tie- <br />wires and similar items have been properly installed to secure the embedded <br />items in place during the placement of concrete. <br />Table 1705.3 ACI 318: 17.8.2 <br />1 <br />Placement of Reinforcing Bars: Verify the reinforcing grade, size, number, <br />location, and bend detailing are as shown on the drawings and are in <br />acceptable condition. Verify tie-wires and similar items have been properly <br />installed to secure the reinforcement in place during the placement of <br />concrete. <br />Table 1705.3 <br />ACI 318: Ch. 20, <br />25.2, 25.3, <br />26.6.1-26.6.3, <br />ACI 506.4R, ACI <br />506.6T <br />X <br />3 Clearances: Verify proper clearances exist between reinforcement or <br />embedded items and forms or soil.X <br />4 <br />Mechanical Couplers: Verify that the specific manufacturer and model of <br />couplers have been approved for the application by the Architect/Engineer. <br />Verify that the couplers are installed according to the manufacturer's <br />recommendations. <br />X <br />5 <br />Headed Reinforcing Bars: Verify that the specific manufacturer and type of <br />headed reinforcing bars (with applicable product labeling) have been <br />approved for the application by the Architect/Engineer. Verify that the headed <br />terminators are installed according to the manufacturer's recommendations. <br />X <br />6 <br />Welding of Reinforcing Steel: Verify that the appropriate approved welding <br />procedure specification (WPS) is available at the site and that the welder has <br />properly considered the process to be performed and the joint configuration. <br />Verify that the welder follows the essential variables of the WPS, that the <br />materials and process comply with the applicable provisions of AWS D1.1 <br />and AWS D1.4, and the project specifications, and that each welder has <br />satisfactorily passed appropriate AWS qualification tests for the procedure to <br />be performed, and if pertinent, has undergone recertification. <br />Table 1705.3 <br />AWS D1.4, <br />ACI 318 <br />Section 26.6.4 <br />Welds larger <br />than 5/16" <br />Welds 5/16" <br />And Smaller <br />X <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Continuous Periodic <br />Remarks <br />Frequency <br />Cast in Place Concrete <br />2 Verify that the concrete is placed, consolidated, and finished as indicated on <br />the drawings. Table 1705.3 ACI 318: 26.5 X <br />1 <br />Verify that the concrete delivered to the job has been prepared with the <br />approved mix design appropriate for the application and is transported and <br />placed within the time and under the conditions permitted by ASTM C94 and <br />the project specifications. <br />Table 1705.3, <br />1904.1, 1904.2 <br />ASTM C94, ACI <br />318: Ch. 19, <br />26.4.3, 26.4.4 <br />X <br />4 Sampling of Fresh Concrete Table 1705.3 <br />ACI 318: 26.5, <br />26.12, ASTM <br />C172 <br />X <br />3 Verify that strength test specimens are taken and cured as indicated in the <br />project specifications. <br />a <br />Slump and air content: One test at point of placement for each set of <br />compression test specimens; additional tests when concrete consistency <br />seems to have changed. <br />ASTM C143 <br />b <br />Concrete Temperature: One test hourly when air temperature is 40 degrees <br />Fahrenheit and below or 80 degrees Fahrenheit and above, and one test for <br />each set of compressive-strength specimens. <br />ASTM C1064 <br />c <br />Compression Test Specimens: One set of four standard cylinders for each <br />compressive-strength test, unless otherwise directed. Mold and store <br />cylinders for laboratory-cured test specimens except when field-cured test <br />specimens are required. <br />ASTM C31 <br />d <br />Compressive-Strength Tests: One specimen shall be tested at 7 days, two <br />specimens tested at 28 days, and one specimen retained for later testing if <br />required. <br />ASTM C39 <br />Frequency of tests: A minimum of one set of cylinders shall <br />be tested for any individual structure or each day's placement <br />of a class of concrete exceeding 25 cubic yards. An <br />additional set of cylinders shall be tested for each 100 cubic <br />yards of each class of concrete. When frequency of testing <br />will provide fewer than five strength tests for a given class of <br />concrete, conduct testing from at least five randomly selected <br />batches or from each batch if fewer than five are used. <br />5 Verify maintenance of specified curing temperature and techniques. Table 1705.3 ACI 318: <br />26.5.3-26.5.5 X <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Continuous Periodic Remarks <br />Frequency <br />Post-Installed Anchors <br />1 Approved Products: Verify that the specific manufacturer and model of <br />anchors have been approved for the application by the Architect/Engineer. X <br />2 <br />Verification of drilled holes: Verify that holes are drilled at the angle required <br />and of the diameter and depth required. Verify that holes are clean prior to <br />installation of anchors. <br />Table 1705.3 <br />X <br />3 <br />Adhesive Anchors: Verify that the adhesive packaging indicates an expiration <br />date and that the expiration date has not passed. Verify that adhesive is <br />mixed properly and that the initial portion of adhesive coming out of the <br />nozzle is wasted, as required by the manufacturer. Verify that the anchors <br />are installed according to the manufacturer's recommendations. <br />X <br />See General Notes for approved products <br />Adhesive anchors include threaded rods and reinforcing bars <br />set in holes filled with adhesive. <br />4 Mechanical Anchors: Verify that the anchors are installed according to the <br />manufacturer's recommendations.X <br />5 <br />Anchor Testing: Test ten percent of each application of anchors to the tensile <br />or torque proof load as indicated in the General Notes. One application of <br />anchors shall be defined as those anchors installed by a single crew in a <br />single day. <br />X <br />Test locations are random at the discretion of the Special <br />Inspector, unless otherwise directed by the <br />Architect/Engineer. If any anchor fails the test, test all <br />anchors in the same application not previously tested until 10 <br />consecutive anchors pass <br />a <br />Tension Tests: Tension test loads shall be maintained for a minimum of one <br />minute. Anchor displacement at the end of the loading period shall be limited <br />to one-fifth of the nominal anchor diameter. Displacement following release of <br />load shall return to zero. <br />ASTM E488 X Applicable to adhesive anchors <br />b <br />Torque Tests: Required torque must be reached within a half turn of the nut <br />from snug, except for 3/8" diameter anchors, for which the required torque <br />must be reached within a quarter turn of the nut from snug. <br />X Applicable to mechanical anchors <br />ACI 318 <br />Section 17.8.2 <br />ACI 318 <br />Section 17.8.2 <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Remarks <br />Frequency <br />Perform Observe <br />Structural Steel - Bolting <br />1 Inspection Tasks Prior to Bolting <br />a Verify that the manufacturer’s certifications are available for fastener <br />materials X <br />b Verify that fasteners marked in accordance with ASTM requirements X <br />c Verify that the correct fasteners are selected for the joint detail (grade, type, <br />diameter, bolt length if threads are to be excluded from shear plane)X <br />d Verify that the correct bolting procedure is selected for joint detail X1705.2 <br />AISC 360 <br />Section N5.6 and <br />Table N5.6-1Verify that connecting elements, including the appropriate faying surface <br />condition and hole preparation, if specified, meet applicable requirements Xe <br />Confirm that pre-installation verification testing by installation personnel are <br />observed and documented for fastener assemblies and that verified methods <br />are used <br />X Documentation for seismic resistance is required per AISC <br />348 Section J7 and Table J7.2f <br />Verify that protected storage is provided for bolts, nuts, washers and other <br />fastener components Xg <br />2 Inspection Tasks During Bolting <br />a Verify that fastener assemblies are placed in all holes and washers and nuts <br />are positioned as required X <br />b Verify that the joint is brought to the snug-tight condition prior to the <br />pretensioning operation X <br />c Verify that fastener component not turned by the wrench prevented from <br />rotating X <br />d <br />Verify that fasteners are pretensioned in accordance with the RCSC <br />Specification, progressing systematically from the most rigid point toward the <br />free edges <br />X <br />1705.2 <br />AISC 360 <br />Section N5.6 and <br />Table N5.6-2, <br />RCSC <br />Specification <br />Section 9 <br />3 Inspection Tasks After Bolting <br />a Document acceptance or rejection of bolted connections X1705.2 <br />AISC 360 <br />Section N5.6 and <br />Table N5.6-3 <br />Documentation for seismic resistance is required per AISC <br />348 Section J7 and Table J7.3 <br />4 Inspection of Fabricated or Erected Frame <br />a <br />Confirm compliance with the details shown on the drawings. Verify member <br />sizes, member locations and proper application of joint details at each <br />connection <br />X <br />Item <br />No.System, Material or Element Building Code <br />Reference <br />Material Standard <br />Reference Continuous Periodic <br />RemarksFrequency <br />Structural Wood <br />1 <br />Bolted Connections: Verify that bolt size, spacing, edge distance and end <br />distance are consistent with information shown on the construction <br />documents. <br />1704.2 <br />Plan Check Number: <br />Project Number: <br />20 <br />2 <br />2 <br /> <br />R <br />Y <br />+ <br />A <br />O <br />, <br /> <br />L <br />L <br />P <br />Th <br />e <br />s <br />e <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />a <br />r <br />e <br /> <br />c <br />o <br />p <br />y <br />r <br />i <br />g <br />h <br />t <br /> <br />p <br />r <br />o <br />t <br />e <br />c <br />t <br />e <br />d <br />. <br /> <br /> <br />U <br />n <br />d <br />e <br />r <br /> <br />s <br />u <br />c <br />h <br /> <br />p <br />r <br />ot <br />e <br />c <br />t <br />i <br />o <br />n <br /> <br />u <br />n <br />a <br />u <br />t <br />h <br />o <br />r <br />i <br />z <br />e <br />d <br /> <br />u <br />s <br />e <br /> <br />i <br />s <br /> <br />n <br />o <br />t <br /> <br />p <br />e <br />r <br />m <br />i <br />t <br />t <br />e <br />d <br />. <br /> <br />T <br />h <br />e <br />s <br />e <br /> <br />p <br />la <br />n <br />s <br /> <br />s <br />h <br />a <br />l <br />l <br /> <br />n <br />o <br />t <br /> <br />b <br />e <br /> <br />r <br />e <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />o <br />r <br /> <br />u <br />s <br />e <br />d <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />b <br />y <br /> <br />A <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />s <br /> <br />O <br />r <br />a <br />n <br />g <br />e <br />. <br />c <br />SEAL <br />CONSULTANT <br />Dr <br />a <br />w <br />i <br />n <br />g <br /> <br />F <br />i <br />l <br />e <br /> <br />N <br />a <br />m <br />e <br />: <br />Sh <br />e <br />e <br />t <br /> <br />P <br />l <br />o <br />t <br />t <br />e <br />d <br />: <br />S H E E T <br />-- <br />731 South Highway 101, Suite 1M, <br />Solana Beach, CA 92075 <br />(714) 639-9860 <br />ry-aoarchitects.com <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />g <br />v <br />o <br />s <br />s <br />\ <br />D <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />B <br />L <br />D <br />C <br /> <br />s <br />g <br />h <br />_ <br />S <br />E <br /> <br />R <br />E <br />V <br />I <br />T <br /> <br />C <br />E <br />N <br />T <br />R <br />A <br />L <br />_ <br />V2 <br />0 <br />2 <br />3 <br />_ <br />g <br />v <br />o <br />s <br />s <br />@ <br />s <br />g <br />h <br />. <br />c <br />o <br />m <br />. <br />r <br />v <br />t <br />10 <br />/ <br />2 <br />5 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />4 <br />: <br />1 <br />8 <br />: <br />2 <br />8 <br /> <br />P <br />M <br />GE <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br /> <br />S <br />P <br />E <br />C <br />I <br />A <br />L <br />IN <br />S <br />P <br />E <br />C <br />T <br />I <br />O <br />N <br />S <br />238143.00-BLDC <br />8631 RUSH STREET <br />ROSEMEAD, CA 91770 <br />626-302-3687 <br />SOUTHERN CALIFORNIA EDISON <br />SC <br />E <br /> <br />- <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br /> <br />B <br />l <br />d <br />g <br /> <br />C <br /> <br />V <br />o <br />l <br />u <br />n <br />t <br />a <br />r <br />y <br />Se <br />i <br />s <br />m <br />i <br />c <br /> <br />R <br />e <br />t <br />r <br />o <br />f <br />i <br />t <br />13 <br />2 <br />7 <br /> <br />S <br />. <br /> <br />G <br />R <br />A <br />N <br />D <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />101119260 <br />S0.03 <br />2024-01-24 Issue for Plan Check <br />2024-06-11 Re-Issue for Plan Check <br />2024-10-25 RTU Anchorage Added <br />2 <br />2024-10-25 2 RTU Anchorage Added <br />1327 S Grand Ave <br />12/12/2024