Laserfiche WebLink
MSP <br />UM <br />ACD INV <br />64 <br />' <br />- <br />0 <br />" <br />103'-4" <br />64 <br />' <br />- <br />0 <br />" <br />103'-4" <br />33' <br />-11 <br />" <br />18'-5" <br />15'-5" <br />6' <br />- <br />9 <br />" <br />GAS <br />1 <br />PROJECT DESCRIPTION: <br />PLOT PLAN & VICINITY MAP <br />SCALE: 1/16" = 1'PV-1 <br />SCALE: NTS PV-1 <br />PLOT PLAN & <br />VICINITY MAP <br />15X355 LONGI SOLAR:LR4-60HPB 355M 355W MODULE <br />ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES <br />SYSTEM SIZE: 5.33KW DC STC,5.00 kW AC CEC <br />REV <br />SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />ANSI B <br />11" X 17" <br />DATE DESCRIPTION <br />REVISIONS <br />Signature with Seal <br />PROJECT NAME & ADDRESS <br />PV-1 <br />PROJECT ID <br />DA <br />V <br />I <br />D <br /> <br />M <br />A <br />R <br />T <br />I <br />N <br />E <br />Z <br />52 <br />0 <br /> <br />S <br /> <br />S <br />H <br />A <br />W <br />N <br />E <br />E <br /> <br />D <br />R <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />, <br />U <br />S <br />A <br />FRESH02/24/2022 ORIGINAL PLAN <br />2065 W OBISPO AVE #102 <br />GILBERT, AZ 85233 USA <br />866-572-2637 <br />LIC # CA-1019100 <br />ABHISHEK MAHESH <br /> ROOF ACCESS POINT <br />ROOF ACCESS POINT SHALL NOT BE <br />LOCATED IN AREAS THAT DO NOT REQUIRE <br />THE PLACEMENT OF GROUND LADDERS <br />OVER OPENINGS SUCH AS WINDOWS OR <br />DOORS, AND LOCATED AT STRONG POINTS <br />OF BUILDING CONSTRUCTION IN <br />LOCATIONS WHERE THE ACCESS POINT <br />DOES NOT CONFLICT WITH OVERHEAD <br />OBSTRUCTIONS SUCH AS TREE LIMBS, <br />WIRES OR SIGNS. <br />ARRAY LOCATIONS <br />VICINITY MAP <br />SCALE: NTSPV-1 <br />2 HOUSE PHOTO <br />EQUIPMENT SUMMARY <br />15 - LONGI SOLAR:LR4-60HPB 355M 355W MODULES <br />01 - SOLAREDGE TECHNOLOGY:SE5000H-US (240V) INVERTER <br />15 - SOLAREDGE POWER OPTIMIZER P-401 <br />PROJECT SITE <br />SHEET INDEX <br />PV-1 PLOT PLAN & VICINITY MAP <br />PV-2 ROOF PLAN & MODULES <br />PV-3 STRING LAYOUT <br />PV-4 ATTACHMENT DETAIL <br />PV-5 ELECTRICAL LINE DIAGRAM <br />PV-6 WIRING CALCULATIONS <br />PV-7 PLACARDS <br />PV-8 OPTIMIZER CHART <br />PV-9 EQUIPMENT ELEVATION <br />PV-10+ EQUIPMENT SPECIFICATIONS <br />3 <br />PAGE 1 OF 17 <br />NOTES <br />1. NOTIFY SERVING UTILITY BEFORE <br />ACTIVATION OF PV SYSTEM. <br />2. MANUFACTURERS PRODUCT INSTALLATION <br />INSTRUCTIONS SHALL BE AVAILABLE AT <br />THE TIME OF INSPECTION. <br />3. ALL SUBMITTALS WILL COMPLY WITH 2019 <br />CEC, CBC, AND CFC. <br />4. SMOKE ALARMS AND CARBON MONOXIDE <br />DETECTOR EQUIPMENT SHALL BE IN PLACE <br />AT RESIDENCE ACCORDING TO THE CRC, <br />CBC R314-315 REQUIREMENT. <br />AHJ - SANTA ANA <br />UTILITY - SCE <br />ACCOUNT # - CA-R-190919 <br />GOVERNING CODES <br />THIS PROJECT SHALL COMPLY WITH THE <br />FOLLOWING CODE <br />2019 CALIFORNIA ELECTRICAL CODE <br />2019 CALIFORNIA RESIDENTIAL CODE <br />2019 CALIFORNIA BUILDING CODE <br />2019 CALIFORNIA FIRE CODE <br />2019 CALIFORNIA GREEN BUILDING <br />STANDARDS CODE <br />2019 CALIFORNIA ENERGY CODE <br />2019 CALIFORNIA PLUMBING CODE <br />2020 NATIONAL ELECTRICAL CODE <br />ALL OTHER ORDINANCES ADOPTED BY <br />THE LOCAL GOVERNING AGENCIES. <br />(N) MAIN SERVICE PANEL, <br />200A RATED, 240V <br />(FLUSH MOUNTED) <br />(N) SOLAREDGE TECHNOLOGY : <br />SE5000H-US INVERTER <br />INTEGRATED RAPID SHUTDOWN <br />(N) AC DISCONNECT <br />(E) UTILITY METER <br />ROOF ACCESS POINT <br />(E) GATE TYP. <br />(E) FENCE <br />(E) DETACHED <br /> STRUCTURE <br />ROOF #01 <br />(04) LONGI SOLAR LR4-60HPB <br />355M 355W MODULES <br />ROOF #02 <br />(11) LONGI SOLAR LR4-60HPB <br />355M 355W MODULES <br />S <br />S <br />H <br />A <br />W <br />N <br />E <br />E <br /> <br />D <br />R <br />1-STORY <br />HOUSE <br />EXISTINGDRIVEWAY <br />PROPERTY LINE <br />PROPERTY <br />LINE <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />LI <br />NE <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />LI <br />NE <br />(E) GAS METER <br />Bldg permit# <br />10111216 <br />Elect <br />permit#20176786 <br />Permits issued on <br />7/18/22 <br />520 S Shawnee Dr <br />07/19/22