My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD ZONE - 718 S Flintridge Dr Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flintridge Dr
>
718 S Flintridge Dr Unit# 2
>
FLOOD ZONE - 718 S Flintridge Dr Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:18:28 AM
Creation date
6/6/2025 7:18:19 AM
Metadata
Fields
Template:
Plan
Permit Number
101119235
Full Address
718 S Flintridge Dr Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Job Name: 39424tmc <br />Date: 3/8/24 <br />SEISMIC LOADS <br />Seismic load calculation per ASCE7-22, Section 12.8: Equivalent Lateral Force Procedure <br />Location : 718 S FLINDTRIDGE DR., SANTA ANA, CA. 92704 <br />Site Coordinates 33.73748°N, 117.935918°W <br />Site specific variables: <br />Risk Category: II 1s spectral response acceleration parameter S1:0.476 g <br />Seismic use group: I 0.2s spectral response acceleration parameter Ss: 1.332 g <br />Site class: D-default Seismic roof height (hn): 10.5 (ft) <br />Seismic design Cat.: D Long-period transition period TL = 8 (sec) <br />Redundancy factor ρ: 1.3 The important factor I: 1 <br />Intermediate Calculations: <br />Fv = 1.8 SM1 =0.8568 SD1 =0.571 T = 0.117 <br />Fa = 1.2 SMS =1.5984 SDS =1.066 <br />Cs max1=Sd1/(T*(R/I)):(for TL>T)= 0.75 Cs min 1= 0.01 <br />Csmax2=Sd1*TL/(T^2*(R/I)):(for TL<T)= 51.66 Csmin2=0.5*S1/(R/I):(forS1>0.6)= 0.04 <br />Transverse Ry = 6.5 Cs= Sds/(R/I) =0.16 V=Cs*W*0.7*ρ=0.15*W <br />Longitudinal Rx = 6.5 Cs= Sds/(R/I) =0.16 V=Cs*W*0.7*ρ=0.15*W <br />Vertical Seimic Load Effect Ev=0.14Sds x Dead Load= 0.15*DL <br />Wall Mass Ext Walls Int Walls Total <br />Plate Floor Length Mass Length Mass Mass <br />Level HT (ft) Thk (in) (ft) (Kips) (ft) (Kips) (kips) <br />1st Flr 9 8 139 18.77 77 6.93 25.70 <br />Total Mass Diaphragms Wall <br />Area Weight Mass Walls Walls Mass Total <br />Abv Blw Mass <br />Level (sq ft) (psf) (kips) kips kips (Kips) (kips) <br />1st Flr 903.00 14 12.64 0 12.8475 12.85 25.49 <br />Mass Distribution Longditudinal Transverse Diaphgram <br />Wx Hx WxHx Fx Fx/A Fy Fy/A Fpx/Ax <br />Level (kips) (ft) (kip-ft) (kips) (psf) (kips) (psf) (psf) <br />1st Flr 25.49 10.50 267.64 3.80 4.211 3.80 4.211 6.02 <br />Total 25.490 267.640 3.803 3.803 <br />TMC ENGINEER INC. <br />9542 Pacific Ave, Anaheim, CA 92804 <br />Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. <br />FLOOD ZONE - 718 S <br />Flintridge Dr Unit# 23/26/2025
The URL can be used to link to this page
Your browser does not support the video tag.